National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure

Opening Date

30 Oct 2019

Closing Date

29 Nov 2019

Tender Amount

₹ 6,35,88,275 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

2268

-

3.6

... More
Road D

864

-

3.6

... More
Picking 5cm to 10cm old B.T surface and sectioning and to bring to camber and super elevation as directed by the departmental officers including labour charges for picking including hire charges for all tools and equipments employed and all other incidental charges etc., complete as per standard specification.

-

-

-

... More
Road A

3788

-

12.99

... More
Road B

3207

-

12.99

... More
Road C

1563

-

12.99

... More
Road D

500

-

12.99

... More
Construction of Granular sub-base Grade-V 150mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

-

-

-

... More
Road A

169

-

1280.28

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick to specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

3167

-

1559.08

... More
Road B

2534

-

1559.08

... More
Road C

1245

-

1559.08

... More
Road D

422

-

1559.1

... More
Providing and laying of prime coat over WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete as per clause 502 of MORTH Rev.5

-

-

-

... More
Road A

12667

-

62.26

... More
Road B

10134

-

62.26

... More
Road C

4980

-

62.26

... More
Road D

1687

-

62.24

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
Road A

12667

-

12.27

... More
Road B

10134

-

12.27

... More
Road C

4980

-

12.28

... More
Road D

1687

-

12.27

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP as per clause 504 of MORTH.Rev.5

-

-

-

... More
Road A

634

-

6222.94

... More
Road B

507

-

6222.94

... More
Road C

249

-

6224.56

... More
Road D

85

-

6221.54

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.

-

-

-

... More
Road A

380

-

8114.2

... More
Road B

304.02

-

8114.2

... More
Road C

150

-

8116.98

... More
Road D

51

-

8111.78

... More
Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers.

-

-

-

... More
Road A

3347

-

141.06

... More
Road B

1693

-

141.06

... More
Road C

825

-

142

... More
Road D

462

-

121

... More
Providing RCC M15 grade precast KM Stone of standard design as per IRC: 8 - 1980 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer. (Replacing the damaged / non-standard / missing KM stones)

-

-

-

... More
Road A

3

-

906

... More
Road B

2

-

906

... More
Road C

1

-

906

... More
Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer (Replacing the damaged / non-standard / missing HM stones)

-

-

-

... More
Road A

14

-

256

... More
Road B

10

-

256

... More
Road C

5

-

256

... More
Road D

2

-

256

... More
Dismantling the existing Cutstone slab in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road A - Km 2/8 & 2/10

10

-

700

... More
Dismantling the existing RCC pipes in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road B - Km 0/2

7.5

-

100

... More
Road B - Km 1/2 & Km 1/4

15

-

100

... More
Road B - Km 2/2

7.5

-

100

... More
Dismantling the existing RR Masonry in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road A - Km 2/8 & 2/10

39

-

168

... More
Road B - Km 0/2

20

-

168

... More
Road B - Km 1/2 & Km 1/4

39

-

168

... More
Road B - Km 2/2

20

-

168

... More
Dismantling the existing PCC in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road A - Km 2/8 & 2/10

30

-

289

... More
Road B - Km 0/2

15

-

289

... More
Road B - Km 1/2 & Km 1/4

30

-

289

... More
Road B - Km 2/2

15

-

289

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATIO OF BOX CULVERT

-

-

-

... More
Road A - Km 0/6

197

-

197

... More
Road A - Km 2/8 & 2/10

197

-

197

... More
Road B - Km 0/2

98.5

-

197

... More
Road B - Km 1/2 & Km 1/4

197

-

197

... More
Road B - Km 2/2

98.5

-

197

... More
Vibrated Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert

-

-

-

... More
Road A - Km 0/6

48

-

4629

... More
Road A - Km 2/8 & 2/10

12

-

4654

... More
Road B - Km 0/2

6

-

4818

... More
Road B - Km 1/2 & Km 1/4

12

-

4615

... More
Road B - Km 2/2

6

-

4563

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem and Footing of Retaining wall

-

-

-

... More
Road A - Km 0/6

224

-

6109

... More
Road A - Km 2/8 & 2/10

129.08

-

6428

... More
Road B - Km 0/2

65

-

6638

... More
Road B - Km 1/2 & Km 1/4

129.08

-

6389

... More
Road B - Km 2/2

65

-

6383

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings

-

-

-

... More
Road A - Km 0/6

74

-

172.8

... More
Road A - Km 2/8 & 2/10

56

-

172.8

... More
Road B - Km 0/2

26

-

172.8

... More
Road B - Km 1/2 & Km 1/4

56

-

172.8

... More
Road B - Km 2/2

22

-

172.8

... More
Providing and fixing of G.I drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at least 600mm beyond the bottom of Deck slab as shown in the drawing including cost and conveyance of Galvanized iron pipes and flats and fixing them in position etc, complete.

-

-

-

... More
Road A - Km 0/6

4

-

2100

... More
Road A - Km 2/8 & 2/10

4

-

2100

... More
Road B - Km 0/2

2

-

2100

... More
Road B - Km 1/2 & Km 1/4

4

-

2100

... More
Road B - Km 2/2

2

-

2100

... More
Supply and fabrication of Fe.500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,

-

-

-

... More
Road A - Km 0/6

6.1

-

69850

... More
Road A - Km 2/8 & 2/10

4.2

-

69850

... More
Road B - Km 0/2

2.1

-

69850

... More
Road B - Km 1/2 & Km 1/4

4.2

-

69850

... More
Road B - Km 2/2

2.1

-

69850

... More
Vibrated Cement Concrete M25 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for Bottom slab, Vertical stem, Key wall and Top slab for Box Culvert

-

-

-

... More
Road A - Km 0/6

89

-

8162

... More
Road A - Km 2/8 & 2/10

64

-

8550

... More
Road B - Km 0/2

32

-

8516

... More
Road B - Km 1/2 & Km 1/4

64

-

8510

... More
Road B - Km 2/2

32

-

8504

... More
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Top slab of Box culvert

-

-

-

... More
Road A - Km 0/6

48

-

529.5

... More
Road A - Km 2/8 & 2/10

35

-

531.4

... More
Road B - Km 0/2

18

-

553.8

... More
Road B - Km 1/2 & Km 1/4

35

-

553.4

... More
Road B - Km 2/2

18

-

552.9

... More
Filing behind outer walls of Box culvert with clean gritty free draining gravel including cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges etc. complete

-

-

-

... More
Road A - Km 0/6

29

-

281

... More
Road A - Km 2/8 & 2/10

38

-

305

... More
Road B - Km 0/2

19

-

317

... More
Road B - Km 1/2 & Km 1/4

38

-

305

... More
Road B - Km 2/2

19

-

293

... More
Earth work excavation in all classes of soil except hard rock not requiring blasting and depositing on bank with all leads and all lifts as per SS20B including cost of labour, equipments and all other incidental charges such as bailing out water, providing necessary coffer dam sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstruction trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus earth with all leads etc,. complete as per standard specification for Training the Channel

-

-

-

... More
Road A - Km 0/6

216

-

73.1

... More
Road A - Km 2/8 & 2/10

281

-

73.1

... More
Road B - Km 0/2

141

-

73.1

... More
Road B - Km 1/2 & Km 1/4

281

-

73.1

... More
Road B - Km 2/2

234

-

73.1

... More
Clearing Light jungle by cutting, removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees upto 300mm girth.

-

-

-

... More
Road A - Km 0/6

124

-

3.9

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 3km for formation of Diversion road for 100% compaction.

-

-

-

... More
Road A - Km 0/6

590

-

141.06

... More
Road A - Km 2/8 & 2/10

3318.6

-

141.06

... More
Road B - Km 0/2

1660

-

141.06

... More
Road B - Km 1/2 & Km 1/4

3318.6

-

141.06

... More
Road B - Km 2/2

1660

-

141.06

... More
Granular Sub Base with graded material (Table :- 400-1)Plant Mix Method (Construction of granular sub base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for grading -V Material for diversion road

-

-

-

... More
Road A - Km 0/6

31

-

1280.28

... More
Road A - Km 2/8 & 2/10

270

-

1280.28

... More
Road B - Km 0/2

135

-

1293.48

... More
Road B - Km 1/2 & Km 1/4

270

-

1293.48

... More
Road B - Km 2/2

135

-

1293.48

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 200mm thick to specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A - Km 0/6

47

-

1559.08

... More
Supplying, Laying Hoisting and fixing RCC Pipes conforming to IS 458 of NP3 class of 1000 mm dia of standard length in position with Collars including cost and conveyance of Pipes and Collars which will be supplied by the contractor himself at worksite including all labour charges for hoisting and laying the pipes and fixing in position, packing joints in Cement Mortor 1:4 and all other incidental charges etc., complete as per the standard specification for Diversion road.

-

-

-

... More
Road A - Km 0/6

20

-

3897

... More
Road A - Km 2/8 & 2/10

30

-

3897

... More
Road B - Km 0/2

15

-

3897

... More
Road B - Km 1/2 & Km 1/4

30

-

3897

... More
Road B - Km 1/2 & Km 1/4

15

-

3897

... More
For Retaining wall Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for foundation

-

-

-

... More
Road A - Km 0/6 & Km 0/10

495

-

175

... More
Road A - Km 2/6 & Km 2/8

165

-

175

... More
Road B - Km 0/2

220

-

175

... More
Road B - Km 1/0 - 2/0

439

-

175

... More
Road C

66

-

175

... More
Vibrated Cement Concrete of Grade M-15 (Nominal Mix 1:2:4), using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, structing etc; complete as per relevant standard specifications, for base course below body wall

-

-

-

... More
Road A - Km 0/6 & Km 0/10

148.5

-

4629

... More
Road A - Km 2/6 & Km 2/8

49.5

-

4654

... More
Road B - Km 0/2

66

-

4818

... More
Road B - Km 1/0 - 2/0

147

-

4615

... More
Road C

20

-

4593

... More
Vibrated Cement Concrete of Grade M-20( Nominal Mix), using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges such as bailing out water, maintaining of protective bunds,cofferdams,shoring,structing etc; complete as per relevant standard specifications, for Stem of Retaining wall

-

-

-

... More
Road A - Km 0/6 & Km 0/10

525

-

6625

... More
Road A - Km 2/6 & Km 2/8

175

-

6650

... More
Road B - Km 0/2

234

-

6831

... More
Road B - Km 1/0 - 2/0

405

-

7144

... More
Road C

70

-

6789

... More
Providing and fixing PVC Pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill.

-

-

-

... More
Road A - Km 0/6 & Km 0/10

180

-

172.8

... More
Road A - Km 2/6 & Km 2/8

150

-

172.8

... More
Road B - Km 0/2

180

-

172.8

... More
Road B - Km 1/0 - 2/0

250

-

172.8

... More
Road C

50

-

172.8

... More
Pipe Culvert - Earth work excavation in all class of soil such as hard stiff clay, stiff black cotton hard red earth, shales, murrams,gravel, stoney earth etc and depositing on bonk with all leads and lifts and all other incidential charges such as bailing out water , shoring,strutting and forming protective bunds whever necessary etc complete as per strandard specification for foundation

-

-

-

... More
Road C - Km 0/2

38

-

175

... More
Road C - Km 1/2

31

-

175

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Base course of pipe culvert

-

-

-

... More
Road C - Km 0/2

4

-

4593

... More
Road C - Km 1/2

4

-

4605

... More
Cement concrete M15 (Nominal mix 1:2:4) mix using 40mm ISS HBG metal including cost and conveyance of all materials to site complying to required standard and specification including labour for layiny,watering, curing and compacting and all other incidetial charges etc complete Below sill Level

-

-

-

... More
Road C - Km 0/2

7

-

5802

... More
Road C - Km 1/2

7

-

5814

... More
Cement concrete M15 (Nominal mix 1:2:4) mix using 40mm ISS HBG metal including cost and conveyance of all materials to site complying to required standard and specification including labour for layiny,watering, curing and compacting and all other incidetial charges etc complete Above sill Level

-

-

-

... More
Road C - Km 0/2

10.5

-

6896

... More
Road C - Km 1/2

10.5

-

6908

... More
Cost and supply of 1000mm dia RCC NP3 class hume pipes 2.50m including cost and conveyance to site including all other incidental charges etc., complete s directed by the departmental officers. Culvert at KM

-

-

-

... More
Road C - Km 0/2

10

-

3700

... More
Road C - Km 1/2

7.5

-

3700

... More
Laying and jointing in position the NP3 1000mm dia RCC hume Pipes excluding cost and conveyance of pipe which will be supplied by the contractor himself at the work site including labour charges for hoisting and placing the pipes in position Packing the joint with slightly damped mix of cement and sand 1:3 rammed with caulking irons including labour, jointing materials and all other incidental charges etc., complete as per the Standard specification for the cross drainage works as directed by the departmental officers.

-

-

-

... More
Road C - Km 0/2

10

-

197

... More
Road C - Km 1/2

7.5

-

197

... More
Providing quarry dust filling including cost and conveyance of gravel to work site stacking it to standard departmental gauge for pre-measurement as directed by the departmental officers including labour, laying, spreading gravel to achieve 100% proctor density under OMC including power roller rolling, including watering, hire and fuel charges for power roller, water sprinkler and all other tools and plants employed and all other incidential charges etc complete

-

-

-

... More
Road C - Km 0/2

11.3

-

149

... More
Road C - Km 1/2

11.5

-

156

... More
Earth work excavation in all classes of soil except hard rock not requiring blasting and depositing on bank with all leads and all lifts as per SS20B including cost of labour, equipments and all other incidental charges such as bailing out water, providing necessary coffer dam sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstruction trimming bottom of excavation, backfilling and clearing the site and disposal of all surplus earth with all leads etc,. complete as per standard specification for Training the Channel

-

-

-

... More
Road C - Km 0/2

40

-

73.1

... More
Road C - Km 1/2

40

-

73.1

... More
Earth Work including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with specification and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer.

-

-

-

... More
Road D

248

-

175

... More
Vibrated Cement concrete M15 (Nominal mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site complying to required standard and specification including labour for layiny, watering, curing and compacting and all other incidetial charges etc complete as per relevant standard specification for base course for CC side Drain

-

-

-

... More
Road D

50

-

4612

... More
Vibrated Cement concrete M15 (Nominal mix 1:2:4) using 20mm ISS HBG metal including cost and conveyance of all materials to site complying to required standard and specification including labour for layiny, watering, curing and compacting and all other incidetial charges etc complete as per relevant standard specification for CC side wall for CC drain

-

-

-

... More
Road D

99

-

8961

... More
Vibrated Cement concrete M20 (Nominal mix) 1:1.5:3 using 20mm ISS HBG metal including cost and conveyance of all materials to site complying to required standard and specification including labour for layiny, watering, curing and compacting and all other incidetial charges etc complete as per relevant standard specification for RCC cover slab

-

-

-

... More
Road D

27

-

10871

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, For Cover slab of CC side drain

-

-

-

... More
Road D

2

-

69850

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

-

... More
GST 12% for above SubTotal Amount

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.