Transport Tenders

Transport Tenders

City Of Solution Tender

Czech Republic
Details: The Subject of the Competition Is the Development of an Architectural Design for a New Building for Technical Services and the Revitalization of the Existing Collection Yard, Including Paved and Unpaved Areas, and Connection to the Transport and Technical Infrastructure. Note: For Administrative Reasons, the Contract Is Published as an Open Procedure on the Contracting Authority's Profile, However, It Is an Open Design Competition. Further Information Is Provided in the Competition Terms and Conditions.
Closing Date2 Jun 2025
Tender AmountCZK 4.5 Million (USD 194.9 K)

REGIONAL MUNICIPAL WASTE Utilization Plant RYPIN LIMITED LIABILITY COMPANY Tender

Transportation and Logistics
Poland
Description: Announcement of the Order for the Service of Collection, Transport and Management of Waste with the code 19 12 12 or 19 12 10
Closing Date27 Mar 2025
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Civil And Construction...+1Construction Material
United States
Details: This Combined Synopsis/solicitation For Services Prepared In Accordance With The Format In Subpart 12.6 Of The Federal Acquisition Regulation (far) As Supplemented With Additional Information Included In This Notice. This Synopsis/solicitation Is Being Advertised As Small Business Set-aside Only. This Announcement Constitutes The Only Solicitation; No Separate Written Solicitation Will Be Issued. the Solicitation Number Is 37130pr250000047 applicable North American Industry Classification Standard (naics) Codes Are: 237110 Water And Sewer Line And Related Structures Construction this Requirement Is For A Fixed Price Contract. The Contract Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far Part 13 And Part 15 the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Best Value. when Submitting Your Proposals, Request A Price Breakdown Of The Following: a. Cost Of Labor And Supervision b. Cost Of Materials And Equipment Needed To Perform The Work. prospective Contractors Shall Also Provide Along With Your Proposal Past Performance Documents Which Will Be Used To Determine Expertise To Perform Such Work. contract Will Be Awarded To The Vendor Who Can Perform The Work Outlined In The Provided Sow In The Time Frame Needed By Unit. past Performance And Cost Factors Will Also Be Used When Selecting The Award. anticipated Award Date: 10 Business Days After Close Of Solicitation, Ooa 23 April 2025 ****quotes Are To Be Received No Later Than Close Of Business (3 P.m. Est) On Thursday April 10, 2025. Quotes Can Be Email To: Mehdi.bouayad@uscg.mil quotations Sent Via The Us Postal Service Or Hand Delivered Should Be Sent To: commanding Officer Uscg Base Miami Beach (p&c) Attn: Mehdi Bouayad 16001 Sw 117th Ave miami, Fl 33177 telephone Requests Of Quotes, Will Not Be Accepted, A Formal Notice Of Changes (if Applicable) Will Be Issued In Beta.sam.gov (sam.gov | Workspace) ***** Site Visit**** Tuesday Mar 25, 2025 At 09:00 Am Est At Project Site (uscg Sector St. Petersburg) 600 8th Ave Se, St. Petersburg, Fl 33701 poc: Cwo Justin David email: Justin.h.david@uscg.mil phone: 619-788-7170 scope Of Work: Scope Of Work contractor Shall Provide All Labor, Tools, And Replacement Materials To Conduct Repairs To A Ruptured 1 ½” Copper Nickel Schedule 40 Potable Water Main And Associated Fittings. Work Shall Include Excavation, Inspection, Repair, Back Fill, Soil Compaction, And Rebar/concrete Slab Replacement. Source And Location Of Leak Has Been Identified And Marked For Visual Reference. remove And Properly Dispose Of Existing Materials That Need To Be Removed To Access Rupture In Accordance With All Applicable State And Federal Laws. Provide All Transportation And Disposal Provisions. Contactor Shall At No Time Dispose Of Any Materials In The Water. contractor Shall Provide Necessary Tools, Equipment And Materials Required To Saw Cut Concrete Slab On Waterfront Pier And Excavate To A Depth Of 2-4 Feet To Access Section Of Ruptured Piping. contractor Shall Perform Inspections And Operational Verifications During Installation Services. This Includes Visual, Environmental, Mechanical, And Functional Verifications Of The System. The Contract Can Be Modified With Contracting Officer Approval Only If Further Damages Are Discovered During Excavation Portion Of This Contract. contractor Shall Be Responsible For The Removal Of All Trash And Debris From Project Area Upon Completion. Contractor Shall Adhere To All Local, State, And Federal Environmental Regulations For Entire Duration Of Project. all Work And/or Contract Modifications Must Be Approved By The Contracting Officer Only And Be Approved By The Contracting Officer’s Representative Cwo Justin H. David. contractor Shall Be Responsible For Removal And Reinstallation Of All Obstacles Throughout The Duration Of Contract. Upon Completion Contractor Shall Conduct Flow And Leak Test Pre And Post Back Fill/concrete Pour. q&a’s: Questions Concerning The Work Requested Must Be Sent To Mehdi.bouayad@uscg.mil By Cob (3 Pm Est) On Friday 04 April 2025. These Q&a’s Will Be Answered And Posted To This Solicitation As An Amendment Prior To Close Of Solicitation. storm Protection should Warnings Of Extreme Weather (such As Storm Surge, Wind Of Gale Force) Be Issued, The contractor Shall Take Every Practicable Precaution To Minimize Danger To Personnel, The Work and Adjacent Property. Precautions Shall Include, But Not Be Limited To, Closing All Openings, removing All Loose Materials, Tools And Equipment From Exposed Locations, And Removing Or securing Fencing, Scaffolding And Other Temporary Work. delivery And Storage equipment And Materials Shall Be Carefully Handled, Properly Stored, And Adequately Protected to Prevent Damage Before And During Installation, In Accordance With The Manufacturer's recommendations. Damaged Or Defective Items Shall Be Replaced. Location Of Storage And staging Area Shall Be Designated By The Poc. The Contractor Will Be Responsible For Security Of all Materials And Equipment. receipt Of Materials shipment Of Equipment, Materials, And Supplies Shall Be Addressed To The Contractor - Not The government. The Contractor Must Be On Hand To Accept Shipments; The Government Will Not accept Shipments. cleanup the Contractor Shall Keep The Work Area, Including Storage Areas, Free From Accumulations Of waste Materials On A Daily And Comply With All Federal, State And Local Regulations pertaining To The Storage, Transport And Disposal Of Wastes. The Contractor Shall Not Use Coast guard Waste Disposal Facilities Including Garbage Cans, Trash Piles Or Dumpsters. security working Personnel List. the Contractor Shall Provide The Cor Cwo Justin David With A List Of Names Of All Personnel Who Will Be Working on The Site. The Contractor May Submit A Revised List At Any Time During The Project. Only personnel On The Approved Listing Will Be Allowed On The Site. personnel Identification. all Personnel Shall Carry Proper Identification (id) When On Site. Proper Id Is Defined As Either the Individual’s Driver’s License, Or A Company Issued Id. The Identification Must Be Laminated, and Show Facial Picture Of The Individual. Individuals Without Proper Id Will Be Escorted Off the Coast Guard Premises. quality quality Of Contractor Furnished Material. Materials Supplied By The Contractor Shall Be Of A quality Conforming To Applicable Federal Specifications And Lead And Asbestos Free. warranties all Warranties And/or Guarantees, Either Implied Or Expressed, For Individual Equipment Shall be Endorsed To The Government. general the Contractor Is Wholly Responsible For Work Site Safety. The Contractor Shall Implement A safety Program That Protects The Lives And Health Of Personnel In The Service Area, Prevents damage To Property And Avoids Work Interruptions. The Contractor Shall Provide Appropriate safety Measures Including But Not Limited To Barricades, Signs And Signal Lights As Well As complying With The Requirements Of All Applicable Federal, State And Local Safety Laws, Rules and Regulations. compliance the Contractor Is Specifically Required To Comply With The Requirements Of The U. S. Army corps Of Engineers "safety And Health Requirements Manual" (em 385-1-1, Latest Version available) And The “accident Prevention” Clause (far 52.236-13). Once Accepted, This Safety plan Shall Become Part Of The Contract Requirements. Note: This Review/acceptance Does Not In any Way Relinquishes The Contractor From Responsibility For Work Site Safety Nor The Obligation to Comply With The Osha Regulations Found In 29 Cfr 1910 & 1926 Or Any Other State Or local Safety Law, Rule Or Regulation Applicable To The Contract Work. The Coast Guard Will cooperate Fully With The Department Of Labor (occupational Safety And Health Administration) in Their Enforcement Of Osha Regulations. applicable Far Clauses far 52.213-4: 52.213-4 Terms And Conditions-simplified Acquisitions (other Than Commercial Items). attached By Reference 52.222-6 Construction Wage Rate Requirements 52.236-2 Differing Site Conditions (april 1984) 52.236-3 Site Investigation And Conditions Affecting The Work (april 1984) 52.236-27 Site Visit (construction) {feb 1995) work Hours: Monday Through Friday, 0730 – 1800 (7:30 Am – 6 Pm) No Weekends Or Holidays Authorized. see Attached Applicable Far Clauses By Reference. offerors May Obtain Full Text Version Of These Clauses Electronically At: Www.arnet.gov/far the Following Homeland Security Acquisition Regulations (hsar) Are Incorporated As Addenda To This Solicitation: Hsar 3052.209-70 Prohibition On Contracts With Corporate Expatriates (jun 2006); Contracting Officers Technical Representative (dec 2003) (cotr) Hsar 3052.237-72. Copies Of Hsar Clauses May Be Obtained Electronically At Http://www.dhs.gov. request Company’s Tax Id Information And Uei Number. vendors Providing An Offer Must Be Registered In Sam (system For Award management) Prior To Close Of This Solicitation. https://www.sam.gov/portal/public/sam/. The Vendors Sam Registration Must Be in An “active” Status Prior To Award. vendors Must Ensure That The Above Listed Naics Codes Are Listed On Their Sam registration To Perform This Type Of Service.
Closing Date10 Apr 2025
Tender AmountRefer Documents 

DEPT OF THE AIR FORCE USA Tender

Others
United States
Details: This Requirement Has Been Solicited Previously As A 100% Small Business Set-aside On Gsa Advantage And Sam.gov, Which Received (2) Responses Whom Were Not Realistic With Regard To Price And Could Not Meet The Requirements Of Daf Sapco Approval To Operate And Meet Sap It Destruction Requirements. based On The Above Findings, The Contracting Officer Anticipates Awarding A Sole Source Contract To Gigabiter, Llc. Cage: 4nuk7 the Contractor Shall Provide All Personnel, Equipment, Supplies, Facilities, Transportation, Tools, Materials, Supervision, And Other Items And Non-personal Services Necessary To Perform Sap It Destruction As Defined In This Performance Work Statement Except For Those Items Specified As Government Furnished Property And Services. The Contractor Shall Provide A Truck That Will Come To The 20fw/cvn Bldg. 105 And Transport/destroy The Sap It Waste To An End Product 2mm Or Smaller.
Closing Date28 Mar 2025
Tender AmountRefer Documents 

Health protection sp z o o Tender

Healthcare and Medicine
Poland
Description: Announcement of the Procurement of the Service of Providing Health Services in the Scope of Paramedic Activities in Medical Transport in Giżycko Health Care Sp. Z oo
Closing Date26 Mar 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Description: 6515--36c257-25-ap-2554 | New | Stryker Transport Stretchers 30in
Closing Soon24 Mar 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Furnitures and Fixtures
United States
Details: General: C.w. Bill Young Veterans Medical Center And Lee County Have A Requirement For Emergency Evacuation Devices. The Alblrg02 Albacmat Rescue Mat Size Large Self-storing, Name Brand Or Equal. Contractor Shall Provide All Tools, Equipment, Labor, Supervision, Transportation, And Materials To Provide The Required Emergency Evacuation Devices For Bay Pines And Lee County Facilities. scope Of Work: The Emergency Evacuation Devices Are Used To Assist And Evacuate Patients/visitors, Who Cannot Ambulate, Down The Hallways And Stair Wells. The Evacuation Rescue Mat Is A No Lift Device That Will Transfer The Person From A Hospital Bed, Chair, Or The Floor Keeping Them Flat, Secure, And Safe. It Will Allow Them To Be Transferred Down A Stair Well In An Emergent Situation. This Design Allows One Person To Safely Transfer Another. It Provides A Way To Evacuate Patients Safely And Efficiently Who Cannot Walk Down The Stairs. Emergency Evacuation Equipment Needs Analysis And Training And Education Of Staff Needs To Be Included. 3.tenical Requirements: Large Size Emergency Evacuation Sled Specifications Required: Sled/mat Must Be A No Lift Device Made Of Heat Resistant Material And Designed To Minimize Drag Coefficient Over A Wide Range Of Flooring (concrete, Tile, Carpet, Glass, Gravel, Dirt/mud Debris Filled Hallways) For Horizontal And Vertical Emergency Evacuation No Wheels Which Will Impede Movement Through Debris. -stretcher Like Design -when In Storage Is Half The Size Of A Rolled Up Sleeping Bag. -constructed With Heat-resistant Material -single Person Operation -3 Patient Securing Straps For Flexibility Across Patient (including Small, Amputees Or Disabled) -3 Transit Strap For Safely Moving The Patient By The Rescuer At The Head End.â  -1 Transit Strap For Moving Patient From The Feet End When Required. -6 Carry Handles To Enable The Carrying Of Patient In A Stretcher Spine Board Can Be Inserted. -thermal Cover - For Warmth And Protection And Can Also Help Calm A Panicky Patient. -polypropylene Board As The Base For Patient Comfort, Heat Protection And Slide-ability. -no Wheels, No Pulleys Or Ropes To Rig.   -insulated Board To Provide Patient Protection -fluorescent Yellow Straps For Detection In Dim Lighting -foot Rest Pocket For Comfort And Security Of Patient -simple Instructions Clearly Visible On Self-storage Pocket -ability To Be Wiped Clean -dimensions: 75 Long, X 32 Wide (at Widest Point) -storage Dimension: 14 X 7 X 7 Weight: 4lbs 11oz -load Capacity: 1030 Lbs. when Deployed The Evacuation Device Must Be Able To Fit Through A Standard Hospital Inpatient Room And Be Able To Make Turns On Narrow Stairs And Landing Dimensions: 36in X 87in X 6in (w/l/h) weigh Less Than 10lbs. includes A Compact Storage Bag With Shoulder Strap For Easy Storage And Transport. must Be Decon Capable Using Standard Decon Wipes. sled Can Be Deployed In Under 20 Seconds. when Deployed, The Device Shall Cocoon The Patient Protecting The Patient S Back And Sides? utilizes Standard Patient Loading / Transfer Protocols (bundle And Log Roll) To Load Patient Into The Sled. must Be A Durable Multi Use Product.
Closing Soon21 Mar 2025
Tender AmountRefer Documents 

Transport Malta Malta Tender

Furnitures and Fixtures
Malta
Purchaser Name: Transport Malta Malta | Description: Tm Quote 016/2025- Call For Quotation For The Supply, Delivery And Installation Of Ergonomic Office Chairs And Adjustable Counter Chairs For Transport Malta
Closing Date2 Apr 2025
Tender AmountEUR 9.8 K (USD 10.6 K)

Government Of Iceland Tender

Iceland
Description: Public Transport On Land In Rural Areas 2026-2027
Closing Date8 Apr 2025
Tender AmountRefer Documents 

Municipal Social Welfare Center in Konopiska Tender

Transportation and Logistics
Poland
Description: Notice of Order for Transport Service
Closing Date27 Mar 2025
Tender AmountRefer Documents 
1-10 of 8718 active Tenders