Spain Tender Results
Spain Tender Results
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Drafting of the construction project and execution of works for the renovation of the class A3 level crossing located at kilometre point 182/271 of line 200, Madrid Chamartín Clara Campoamor – Barcelona França, and belonging to the municipality of Arcos de Jalón (province of Soria).
Contract Date1 Mar 2025
Contract AmountEUR 314.1 K (USD 326.7 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Drafting of the Project for adaptation to regulations in BT and energy efficiency of lighting in the stations of division 32 of the provinces of Teruel, Castellón, Albacete, Alicante and Murcia
Contract Date25 Feb 2025
Contract AmountEUR 99.8 K (USD 104.6 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Services for the drafting of the basic and construction project for the platform, track and energy. Implementation of standard gauge in the Mediterranean corridor. Section: San Isidro - Alicante and variant connecting the new Elche station with the city centre
Contract Date25 Feb 2025
Contract AmountEUR 4.2 Million (USD 4.4 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of works and performance of maintenance of the construction project for GSM-R mobile telecommunications facilities, Xátiva-Alcoi section of the conventional network.
Contract Date25 Feb 2025
Contract AmountEUR 7.4 Million (USD 7.7 Million)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution works of the construction project for complementary actions on the Sagunto – Teruel branch line, and the construction project for the adaptation of 750 metres of one of the sidings at Cella station.
Contract Date25 Feb 2025
Contract AmountEUR 26.6 Million (USD 27.7 Million)
1-10 of 10000 active Tender Results