Pimpri Chinchwad New Town Development Authority Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Pimpri Chinchwad New Town Development Authority - PCNTDA Tender
Eprocure
Opening Date
12 Apr 2018Closing Date
16 May 2018Tender Amount
₹ 17,84,07,790Costs
EMD
₹ 89,20,390Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Purchase of Educational Plot No Educational Complex in Sector No.29
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_PCNTD_307455_1Tender No
Tender Notice No Land-7 for 2018-19Tender Authority
Pimpri Chinchwad New Town Development Authority ViewPurchaser Address
-Website
http://https://www.pcntda.org.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item No.4 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
265
8414
31.75
Item No.5 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
397
16237
40.9
Item No.6 : Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .
450
23805
52.9
Item No.7: Providing cut off trench filling using selected impervious soil directly available from material of excavation including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
305
14015
45.95
Item No.8 : Providing cut off trench filling using selected impervious soil from approved borrow areas from submergance including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
807
88205
109.3
Item No. 9 : Providing casing embankment using selected pervious material available directly from excavation , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, including watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor / excluding compaction etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
A ) Top Shrunked Portion
-
-
-
Including Watering & Compaction with vibratory compacter
549
30524
55.6
Item No. 10 : Providing casing embankment using selected pervious material from approved borrow areas , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
Top Shrunked Portion - Including Watering & Compaction with vibratory compacter
175
21018
120.1
Item No.11 : Removing dry silt from the drain with all lead & lift and depositing as directed including 1 % Cess for labour welfare etc. comp .
192
6096
31.75
Item No. 12 : Providing and constructing 200 mm thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials including labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. Including 1 % Cess for labour welfare etc. complete .
529
24889
47.05
Item No.13 : Providing and constructing 230 mm thick dry rubble stone pitching using stones and stone chips from approved source from borrow area including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. including 1 % Cess for labour welfare etc. complete .
901
152990
169.8
Item No. 14 : Conveying & disposing and placing the the balance excavated stuff of excavation neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete
478
5975
12.5
Item No 15 : Providing and fixing information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non pealable crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge including 1 % Cess for labour welfare etc. complete .
1
4519
4518.85
Item No.16 : Royalty Charges For Construction Material
130.13
18393
141.34
Item No.17 : 1 % Cess For Insurance
1
4315
4315
Item No.18 : CGST 6 % / 2.50 %
1
24787
24787
Item No.19 : SGST 6 % / 2.50 %
1
24787
24787
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements