Drinking Water And Sanitation Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Drinking Water And Sanitation Department - DWSD Tender

Works
Eprocure

Opening Date

24 Jun 2019

Closing Date

1 Jul 2019

Tender Amount

₹ 46,29,561 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(b)Components &parts used in the solar pumping system including the metallic structure (MS)should confirm to the BIS

-

-

-

... More
(c)The rates are pumping system includes compressive maintenance contract for 5 years . During CMC period the contractor has to visit the installation on quality basis and also on intimation of Defect from user . During CMC Contractor shall have to repair /replace the parts found defective due to manufacturing defect free of cost.

-

-

-

... More
(d)Max-m shut off head 120.00meter.

-

-

-

... More
(e)Discharge 5000liters per day for 90.00m Dynamic head

-

-

-

... More
(f)Cable 2.5mmx3core as per IS 694

-

-

-

... More
(g)Control panel suitable for above pumpset with arrangement of dry run protection ,sensor, float switch &rain preventive box etc.

-

-

-

... More
(h) Lighting arrestor.

-

-

-

... More
(i) Controller for censer for over flow and dry bore.

-

-

-

... More
Carrying out recuparation/ Yeild test for ascertaining the discharge of constructed well/ excavetad profile as directed by the EIC. The test carried out by the drawing down water from the well/ profile below normal/subsoil water level upto full depth rise is recorded the normal water level/ sub soil water level in the well/ profile as well as strainer/ level at pump as per design of W.S. Scheme shall be recorded prior to the test including cost of all materials, Over Load, Labours etc complete as directed

11

-

3344

... More
Supplying all labours, tools & equipments for dismnatling of head and water tank asseby and taking out 32 mm dia old G.I. pipe, connectiong Road, clylinder assembly the dismnatled components after necessary changing for making the T/W in good condition with all transportation including unused taken out materials back in store all complete job as per direction of E/I.

11

-

677.23

... More
Supplying all materials, labours and fixing IM-II hand Pump with all accessories all complete job as per direction of E/I including carriage of materials.

11

-

139.15

... More
Supplying all tools equipments and labour and lowing 32 mm dia medium quality G.I. Pipe in drilled T/W in 3 Mtrs. Length all complete as per dirction E/I including carriage of materials.

264

-

14.74

... More
Supplying all tools, labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification & direction of E/I including carriage of materials.

11

-

182.97

... More
Supplying ISI marked Water Tank Assembly Mark-II (G.I.) conforming to IS 15500/2004 with latest revisions.

11

-

1498

... More
Supplying ISI marked GM Cylinder assemble complete set for Mark-II conforming to IS 15500/2004 with latest revisions to facilitate dual water supply system.

11

-

2388

... More
Construction RCC Foundation for Steel structure staging & Solar panel

-

-

-

... More
Earth work in excavation in foundation trenches in ordinary soil and disposal of excavated earth as obtained to a distance up to 50.0m ,including all lifts, levelling ,ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design ,building specification and direction of E/I(vide classification of soil item -B)

77.11

-

120.53

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials ,labour ,royalty and taxes all complete as per building specification and direction of E/I(Mode of measurement compacted volume)

4.18

-

223.35

... More
Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.

53.24

-

238.38

... More
Providing PCC M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I.

5.32

-

5358.83

... More
Providing RCC M-200 in nominal mix of (1:1.5:3) in columns with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I. Foundation for steel structure staging Footing

8.91

-

5829

... More
Vertical Pedestal

3.76

-

6972.73

... More
Tie Beam

3.12

-

6360.23

... More
Providing for steel reinforcement as per approved design and drawing excluding carriage of T.S. bar to work site cutting, bending with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/I. Foundation for steel structure staging

0.99

-

65841.8

... More
Vertical Column

1.1

-

63762.5

... More
Carriage of materials from different sources or departmental stores to work site including loading, transporting, unloading and stacking the materials at work site etc. all complete job. as per direction of E/I. (a) Bricks (Lead 22 Km)

1760

-

1.29

... More
(b) Sand (Lead 20 Km)

14.3

-

491.35

... More
(c) Stone Chips (Lead 25 Km)

18.37

-

491.35

... More
(d) Cement (Lead 20 Km)

8.25

-

307.13

... More
(e) Steel (Lead 20 Km)

2.09

-

307.13

... More
Construction of galvanized tubular Steel structure staging for HDPE water storage Tank& Solar Panel.

-

-

-

... More
For Structure Providing structural steel galvanised tubular hollow section work in trusses, other similar trussed purlins and members with all bracing ,gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge ,including cutting fabricating ,hoisting , erecting and fixing in position , making riveted/bolted /welded connections and one coat of anticorrosive paint and over it two coat of all oil painting & For Structure(PLUS) Providing and applying materials &labour for hot dip galvanizing of above structure including transportation for galvanizing minimum thickness 80microns (Net wt. of components to be Galv) preferably TATA structural section etc complete.

7936.61

-

104.34

... More
Information board for IEC Providing structural steel work in trusses other similar trussed purlins and members with bracing gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge including cutting fabricating hoisting erecting and fixing in position making reverted bolted welded connections one coat of anticorrosive paint and over it two coats of oil painting etc complete

299.2

-

68.13

... More
Materials and labour for vinyl painting of matter given by department in different color.

13.86

-

2000

... More
Providing & Laying of Rising Main, Delivery pipes and fitting, Public Stand post & H.D.P.E water storage Tank.

-

-

-

... More
Earth work in excavation (as per I.S. 3114/1965) for laying different type and size of pipe so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of E/I. 25mm dia GI pile in trench

198

-

109.19

... More
Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of E/I. For classification of soil item A&B

190.08

-

68.25

... More
Dismantling PCC road & Plain cement or lime concrete work including and stacking serviceable materials in countable stacks and disposal of unserviceable materials with all lead of 50 Mtrs. etc. all complete as per direction of E/I.

4.95

-

390.16

... More
Providing PCC M-150 in nominal mix of (1:2:4) with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I.

4.95

-

5358.83

... More
Supplying, fitting and fixing.GI/ HDPE Roll pipes with red lead and yarn of following nominal bore with screwed and socketed joints on wall ceiling and floor including supplying and fitting of wall hooks or pipe clamps, wooden plugs, cutting pipes to size and threading ends if required etc. all complete as per specification and direction of E/I. (a) 32mm dia G.I. pipe On Wall/floor etc

110

-

292.46

... More
(b) 32mm dia HDPE pipe in trench (PE-80, PN- 10)

275

-

57.65

... More
(c) 25mm dia G.I. pipe (in Trench)

165

-

228.96

... More
Supplying and fixing GI fittings of approved make all complete as per specification and direction of E/I. (a) 25mm dia GI Elbow

11

-

107.14

... More
(b) 32mm dia GI Elbow

44

-

136.86

... More
(c) 32mm GI Socket

22

-

120.64

... More
(d) 25mm GI Socket

22

-

95.29

... More
(e) Reducing Socket 25 mm x 15 mm

11

-

80.06

... More
(f) Reducing Socket 32mm x 25mm

11

-

115.21

... More
Providing and fixing 32 mm dia (wt.not less than 600 gram)Isi marti full way wheel Valve approved quality as per specification and direction of E/I.

22

-

692.54

... More
Construction of 1.20 m x1.20 m RCC platform and 125mm av. dia and 900mm high RCC Stand post with 2.00m long 15mm dia G.I. pipe, 2 Nos Elbow, Nipple and brass bib cock etc all complete as per direction of E/I.

-

-

-

... More
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling ,ramming the foundation trenches,removing roots of trees, shurbs all complete as per approved design,building specification and direction of E/I.

2.38

-

120.53

... More
Providing,coarse clean sand in filling in foundation trenches/in plinth including ramming & watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty,& taxes all complete as per building specification & direction of E/I.(mode of measurement compacted volume)

1.27

-

223.35

... More
Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering,taxes royalty all complete as per building specification and direction of E/I.

15.84

-

238.38

... More
Providing Tor steel reinforcement of 8mm, 10mm,12mm & 16mm dia bars as per approved design and drawing excluding carrriage of M.S.bars to work site, cutting, bending and inding with annealed wire with cost of wire, removal of rust ,placing the rods in position all complete as per building specification and direction of E/I. 12 mm (TMTcoil Fe 500)(only valid for Sail & Tata Steel)

137.5

-

65.84

... More
Providing R.C.C.M20 with nominal mix of (1:1.5:3) in foundation with approved quality of stone metal grade-III (50 mm to25mm size)clean coarse sand of F.M. 2.5 to 3including screening,shuttering,mixing cement concrete in mixer and placing in position,vibrating,striking,curing taxes and royalty all complete. as per building specification and direction of E/I.

1.67

-

5829

... More
Providing 12 mm thick cement plaster(1:4) with clean coarse sand of FM1.5including screening,curing,with all leads and lifts of water,scaffolding,taxes and royalty all complete as per specification and direction of E/I.

27.92

-

133.47

... More
Providing 1.5 mm thick cement punning including screening, curing,with all leads and lifts of water, scaffolding, royalty all complete as per specification and direction of E/I.

27.92

-

43.15

... More
Supplying, fitting and fixing following pipes, fittings, bib cocks confirming relevant IS specifications including cost of all materials, labours etc all complete job as per standard specifications and directio of E/I. (i) 15 mm dia GI Pipe (Medium) (Wall)

22

-

162.81

... More
(ii) 15 mm dia GI elbow

22

-

61.25

... More
(iii) 15 mm dia GI nipple

11

-

60.16

... More
(iv)15 mm dia GI socket

11

-

59.07

... More
(v) 15 mm dia brass bib cock(weight not less than 400gms)

11

-

255.12

... More
Supplying tools and making connection of new GI distribution branch 15 mm to 50 mm dia with existing GI main by providing and fixing GI Tee including cutting of pipe at two places, threading their ends, providing long screw and a GI nipple all complete as per specification and direction of E/I. (a) 15 mm dia branch line for stand post from 32 mm dia existing distribution line

11

-

275.04

... More
Providing and fixing HDPE container Syntex or alike one piece molded water tank made out of low density polythyler andbuilt corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity 5000.00 litres

-

-

-

... More
Cost of 5000 Liters Capacity Water storage Tank ( Sintex / Himgiri / Gangotri )

55000

-

6.37

... More
Transportation Charge

11

-

1000

... More
Lifting of 5000 Litrs Capacity Tank up to 4.00m height with lifting tools with rope and labour

11

-

500

... More
Making hole in Tank

44

-

25

... More
Making long screw in G.I. pipe including supplying and fitting jam nuts and extra socket etc.

44

-

158.59

... More
Carriage of materials from different sources or departmental stores to work site including loading, transporting, unloading and stacking the materials at work site etc. all complete job. as per direction of E/I. (a) Bricks (Lead 22 Km)

1100

-

1.29

... More
(b) Sand (Lead 20 Km)

7.59

-

491.35

... More
(c) Stone Chips (Lead 25 Km)

7.26

-

491.35

... More
(d) Cement (Lead 20 Km)

3.3

-

307.13

... More
(e) Steel (Lead 20 Km)

0.28

-

307.13

... More
Construction of 1.25m Internal Dia and 1.90 m deep Soak/Recharge Pit with 250 mm thick Brick Masonry honeycombed wall

-

-

-

... More
Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50 M.including all lifts, levelling ,ramming the foundation trenches,removing roots of trees, shurbs all complete as per approved design,building specification and direction of E/I.

65.71

-

120.53

... More
Providing,coarse clean sand in filling in foundation trenches/in plinth including ramming & watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty,& taxes all complete as per building specification & direction of E/I.(mode of measurement compacted volume)

2.08

-

223.35

... More
Providing designation 75 A one brick flat soling joints filled with local sand including cost of watering,taxes royalty all complete as per building specification and direction of E/I.

25.93

-

238.38

... More
Providing P.C.C.M.-150 with nominal mix of (1:2:4) in foundation with approved quality of stone metal grade-III (50 mm to25mm size)clean coarse sand of F.M. 2.5 to 3including screening,shuttering,mixing cement concrete in mixer and placing in position,vibrating,striking,curing taxes and royalty all complete. as per building specification and direction of E/I.

2.6

-

5358.83

... More
Providing designation 75 A brick work in CM (1:6) in foundation and plinth with approved quality of clean coarse sand of FM 2 to2.5 including,providing 10mm thick mortar joints cost of screening materials,raking out joints to15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I.

20.61

-

3840.03

... More
Providing precast R.C.C.M.200 with nominal mix of (1:2:4) slab of desired size with approved quality of stone ships and clean coarse sand of F.M.2.5 to3 including curing,shuttering carrying the slab manually to site and laying in position all complete(but excluding the cost ofreinforcement) taxes and royalty,all complete as per building specification and direction of E/I.

3.3

-

5489.86

... More
Providing Tor steel reinforcement of 8mm, 10mm,12mm & 16mm dia bars as per approved design and drawing excluding carrriage of M.S.bars to work site, cutting, bending and inding with annealed wire with cost of wire, removal of rust ,placing the rods in position all complete as per building specification and direction of E/I. 12 mm (TMTcoil Fe 500)(only valid for Sail & Tata Steel) Considering 90Kg per cubic metre of concrete

297

-

65.84

... More
Providing 12mm thick cement plaster(1:6) with clean coarse sand of FM1.5including screening,curing,with all leads and lifts of water,scaffolding,taxes and royalty all complete as per specification and direction of E/I.

31.12

-

124.6

... More
Providing 6 mm thick cement plaster(1:4) with clean coarse sand of FM1.5 including screening,curing,with all leads and lifts of water,scaffolding,taxes and royalty all complete as per specification and direction of E/I.

34.05

-

136.62

... More
Providing, fitting and fixing HCI or MS grating weight not less than 1.25 Kg at the inlet of the soak pit

11

-

100

... More
Providing brick bats including cost of the bats,labours, tools, royalty etc all complete as per specification and direction of E/I.

13.77

-

829.32

... More
Supplying all materials, labours, tools, tackles and constructing brick masonry drain 150 mm wide and 150 mm deep with 250 mm B/W with 75A bricks in CM(1:6) in apron on both sides over 50 mm thick PCC M15 (1:2:4) over a brick flat soling over 50 mm thick sand filling and having 12 mm CP in CM(1:3) with punning on exposed surfaces all complete job as per specification & direction of E/I.

55

-

814.19

... More
Carriage of construction materials from their source to the construction site including cost of loading, transporting, unloding and stacking in countable stacks including 10% CP & 5% OHC all comolete as per specifications and direction of the E/I. (a) Bricks (Lead 22 Km)

12980

-

1.29

... More
(b) Sand (Lead 20 Km)

18.04

-

491.35

... More
(c) Stone Chips (Lead 25 Km)

8.25

-

491.35

... More
(d) Cement (Lead 20 Km)

5.5

-

307.13

... More
(e) Steel (Lead 20 Km)

0.3

-

307.13

... More
Annual Repair and Maintenance for 1st Year

11

-

10694.34

... More
Annual Repair and Maintenance for 2nd Year

11

-

11229.05

... More
Annual Repair and Maintenance for 3rd Year

11

-

11790.51

... More
Annual Repair and Maintenance for 4th Year

11

-

12380.03

... More
Annual Repair and Maintenance for 5th Year

11

-

12999.03

... More
Add 12 % GST

1

-

491113.21

... More
Adding Labour Cess @ 1% of Estimated Cost

1

-

45837.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.