Western Railway Tender

Search for the latest Gujarat tenders online related to civil works, road & transport, pipelines and more easily here on BidAssist. Here you can get any and every tender that is posted on the eProcurement Gujarat website, minus the clutter. No need for a tender ID, as on BidAssist, you can view any Gujarat tender by merely typing Gujarat in the search box.

Western Railway - WR Tender

Goods
Railway
Ireps

Opening Date

2 Jul 2019

Closing Date

26 Jul 2019

Tender Amount

₹ 27,30,70,997 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
USSOR Items - Steel

-

-

82836589.04

... More
Misc. USSOR items required successsful completion of the work under Unified Standard schedule of Rates (Works & Material) 2011 Edition. (Includes All Chapter)

-

1

886395.4

... More
NS/1 - "Providing hand packed stone pitching work in 1:6 Cement mortar like masonry 6 finishing on already done earthwork or any where required as directed by engineer-in-charge with contractor all materials & labours etc complete. The rate includes cost of cement & all other materials. Note: 1. Nothing extra shall be paid for cement & sand. 2. Min. Cement consumption shall be 1.7 bag per cum"

1120

1306

1462720

... More
NS/2 - Providing & filling of poorly graded gravels as per IS 1498-1970 behind abutments, 6 wing and retaining wall after rubble filling including procurements all rolayalties and taxes etc. loading in contractor's own transport, leading, unloading and making stacks for measurment at site as directed by engineer in charge or his representataive as per specifications and special condtions of contract.

980

272

266560

... More
NS/3 - Uncoarsed Hand Packed Dry Rubble Filling.

3703

404

1496012

... More
USSOR Civil Works

-

-

1352015.19

... More
USSOR Cement

-

-

408038.4

... More
USSOR Steel Items

-

-

13413270.9

... More
Miscellaneous USSOR items required successful completion of the work under Unified Standard schedule of Rates (Works & Material) 2011 Edition. (Includes All Chapter)

-

1

297758.1

... More
NS/4 - Providing, Fabricating & laying of colour coated Galvalume (Proflex system roofing) material for self-supported roofing system (Technology similar to Proflex system provided by M&B engineering Pvt. Ltd., Ahmedabad), Material shall be of following specification, BMT 0.90mm to 1.00mm, APT 0.95mm Tolerance +/- 0.02 mm thick, width 605 mm or as decided by Railway (Tolerance +/- 2mm), including supplying, loading, transporting, unloading and staking at site, fabricating and laying with all contractors tools, plants, machineries materials and fixtures labours including all lead and lift and laps/ wastage if any etc. complete. The colour of sheet will be decided by Railway. The rate is also inclusive of designing of roofing system, proof 11 checking and providing execution drawing. Fabrication and installation of self -supported roofing technology similar to Proflex System provided by M&B engineering Pvt. Ltd., Ahmedabad or decided by Engineer in Charge. The Arch length, Arch width and Arch height will be as per the Drawing supplied by railway or as per site requirement or As per the instruction of Engineer in Charge. Note: The roofing system should be self-supported roofing system (i.e. without trusses, purlins or any ancillary supports shall be designed by the Contractor through the consultant and got duly proof checked from VITI / Indian Institute of Technology, Mumbai, or any other Govt. agencies. Design and drawing will be approved by Railways. For design of roofing system relevant load parameters of IS code of practice to be adopted. The cost of designing and proof checking of design and drawings will not be paid separately and these charges are deemed to be included in rates of this item. The rates shall also inclusive of preparation of necessary auto cad drawing required for execution of roofing system should be 100% leak proof, resistant to corrosion and maintenance free.

9300

2321

21585300

... More
Part-3 USSOR-Earth work

-

-

2268111.73

... More
USSOR-Civil Works

-

-

14311891.32

... More
USSOR Cement

-

-

11705601.6

... More
USSOR Steel Items

-

-

16834055.47

... More
Miscellaneous USSOR items required successful completion of the work under Unified Standard schedule of Rates (Works & Material) 2011 Edition. (Includes All Chapter)

-

1

886395.4

... More
NS/1 - Providing hand packed stone pitching work in 1:6 Cement mortar like masonry finishing on already done earthwork or any where required as directed by engineer-in-charge with contractor all materials & labours etc. complete. The rate includes cost of cement & all other materials. Note: 1. Nothing extra shall be paid for cement & sand. 2. Min. Cement consumption shall be 1.7 bag per cum

666

1306

869796

... More
NS/2 - Providing & filling of poorly graded gravels as per IS 1498-1970 behind abutments, 17 wing and retaining wall after rubble filling including procurements all royalties and taxes etc. loading in contractor's own transport, leading, unloading and making stacks for measurement at site as directed by engineer in charge or his representative as per specifications and special conditions of contract.

120

272

32640

... More
NS/3 - Un-coarsed Hand Packed Dry Rubble Filling as per the instruction of Engineer-in - Charge.

1587

404

641148

... More
USSOR Civil Items

-

-

591344.61

... More
Part-4 USSOR Cement

-

-

183617.28

... More
USSOR Steel Items

-

-

5752200.28

... More
Miscellaneous USSOR items required successful completion of the work under Unified Standard schedule of Rates (Works & Material) 2011 Edition. (Includes All Chapter)

-

1

128291.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.