Andhra Pradesh Housing Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Housing Board - APHB Tender

Civil And Construction
Building Construction

Opening Date

10 Oct 2022

Closing Date

26 Oct 2022

Tender Amount

₹ 4,63,12,717 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹59,000/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, steel centering, shuttering, vibrating etc., complete for finished item of work for FOUNDATIONS, PLINTH, PEDASTAL, (below plinth ) for Footings

161.41

-

1856012.24

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, steel centering, shuttering,, vibrating etc., complete for finished item of work for FOUNDATIONS, PLINTH, PEDASTAL, (below plinth ) for Plinth Beams

17.88

-

255966.5

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, , vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [upto Stilt Floor: Columns]

2.21

-

33383.91

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for Stilt Floor: Columns]

10.58

-

159591.37

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for 1st Floor: Columns]

10.58

-

164522.99

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for 2nd Floor: Columns]

10.58

-

169454.6

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for 3rd Floor: Columns]

10.58

-

188476.17

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc,vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for 4th Floor: Columns]

10.58

-

194488.41

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, vibrating, etc., complete for finished item of work. (for COLUMNS upto 3.66m height) [for 5th/ Terrace Floor: Columns]

5.18

-

98204.66

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for Stilt Floor: Roof Beams]

32.88

-

429743.49

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 1st Floor: Roof Beams]

32.88

-

438197.81

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 2nd Floor: Roof Beams]

32.88

-

446653.77

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 3rd Floor: Roof Beams]

32.88

-

463873.1

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 4th Floor: Roof Beams]

32.88

-

473001.4

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 5th/ Terrace Floor: Roof Beams]

4.02

-

58966.36

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering, shuttering, vibrating etc., complete for finished item of work for WATER TANKS, RCC WALLS IN BUILDINGS. (for Drop Wall) 100mm thick.

70.42

-

156165.08

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for Stilt Floor Grade Slab (125mm)]

46.33

-

587646.07

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for Stilt Floor : Roof Slab (125mm)]

10

-

126805.63

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for Stilt Floor : Roof Slab (175mm)]

52.22

-

588711.9

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 1st Floor: Roof Slab (125mm)]

10

-

129377.12

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 1st Floor: Roof Slab (175mm)]

52.22

-

602141.86

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 2nd Floor: Roof Slab (125mm)]

10

-

131948.11

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 2nd Floor: Roof Slab (175mm)]

52.22

-

615569.2

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 3rd Floor: Roof Slab (125mm)]

10

-

137185.06

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 3rd Floor: Roof Slab (175mm)]

52.22

-

642919.94

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 4th Floor: Roof Slab (125mm)]

10

-

139961

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 4th Floor: Roof Slab (175mm)]

52.22

-

657415.1

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 5th/Terrace Floor: Roof Slab (125mm)]

3.79

-

54179.32

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 5th/Terrace Floor: Roof Slab (175mm)]

4.54

-

58484.83

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 5th/Terrace Floor: precast slabs]

2.25

-

17300.55

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering,etc., complete for finished item of work [for Stilt Floor: Lintels]

0.13

-

1774.89

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, etc., complete for finished item of work [for 1st Floor: Lintels]

0.58

-

8411.26

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work [for 2nd Floor: Lintels]

0.58

-

8680.58

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, etc., complete for finished item of work [for 3rd Floor: Lintels]

0.58

-

9719.36

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, etc., complete for finished item of work [for 4th Floor: Lintels]

0.58

-

10047.69

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, etc., complete for finished item of work [for 5th/ Terrace Floor: Lintels]

0.17

-

2997.93

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for Stilt Floor: Chajjas]

2.03

-

2427.58

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for 1st Floor: Chajjas]

1.49

-

2479.22

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for 2nd Floor: Chajjas]

1.49

-

3175.35

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for 3rd Floor: Chajjas]

1.49

-

3970.9

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for 4th Floor: Chajjas]

1.49

-

4674.73

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 grade) corresponding to IS-456 using WEIGH BATCHER 0.50Cum (6Cum/ Hr) size 10mm & 06mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc.,to site and excluding seigniorage charges, including all operational, insidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400 kgs as per IS code, centering charges suchas steel scaffolding pipes, jack props, acro spans, wallers, foot plates, brackets steel centering plates etc., shuttering etc., complete for finished item of work for CHAJJAS (SUNSHADES) of average 50mm thick (60mm thick at fixed end and 40mm thick at free end) including plastering 12mm thick in CM (1:5) prop. and finished to average thickness of 50mm. [for 5th/ Terrace Floor: Chajjas]

2.24

-

8067.82

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for Stilt Floor: Walls (200mm thick)]

11.24

-

185486.08

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for 1st Floor: Walls (200mm thick)]

5.51

-

92796.76

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for 2nd Floor: Walls (200mm thick)]

5.51

-

94631.82

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for 3rd Floor: Walls (200mm thick)]

5.51

-

103807.39

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for 4th Floor: Walls (200mm thick)]

5.51

-

106205.71

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Lift, Sump & Water tank side walls) [for 5th/ Terrace Floor: Walls (200mm thick)]

18.39

-

362171.89

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for Stilt Floor: for all Reinforcement]

31.09

-

2827113.95

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for 1st Floor: for all Reinforcement]

10.79

-

1001595.2

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for 2nd Floor: for all Reinforcement]

10.79

-

1022016.62

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for 3rd Floor: for all Reinforcement]

10.79

-

1042438.57

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for 4th Floor: for all Reinforcement]

10.79

-

1062859.99

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [for 5th/ Terrace Floor: for all Reinforcement]

4

-

401624.6

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for Stilt Floor: ]

0.03

-

153.81

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for 1st Floor: ]

0.16

-

922.88

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for 2nd Floor: ]

0.16

-

922.88

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for 3rd Floor: ]

0.16

-

922.88

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for 4th Floor: ]

0.16

-

922.88

... More
Construction of Commercial Complex;PCC work of mix (1:3:6) Prop. using 13.2/12.5mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, machine mixing, laying, levelling and all labour charges, curing etc., complete. for finished item of work for Hold Fasts and Bed Blocks. [for 5th/ Terrace Floor:]

0.05

-

307.63

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for STEPS. [for Stilt Floor: for Steps]

1.22

-

10100.52

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for STEPS. [for 1st Floor: for Steps]

1.22

-

10243.58

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, laying concrete, vibrating etc., complete for finished item of work for STEPS. [for 2nd Floor: for Steps]

1.22

-

10386.65

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for STEPS. [for 3rd Floor: for Steps]

1.22

-

12148.45

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for STEPS. [for 4th Floor: for Steps]

1.22

-

12415.72

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for STEPS. [for 5th/ Terrace Floor: for Steps]

1.22

-

12683

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for Stilt Floor: Brick Masonary (225mm)]

20.86

-

166174.27

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for 1st Floor: Brick Masonary (225mm)]

34.8

-

288864.36

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for 2nd Floor: Brick Masonary (225mm)]

34.8

-

309486.84

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for 3rd Floor: Brick Masonary (225mm)]

34.8

-

330104.1

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for 4th Floor: Brick Masonary (225mm)]

34.8

-

350723.1

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls) [for 5th/ Terrace Floor: Brick Masonary (225mm)]

9.1

-

97082.03

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:4) Prop. with Flyash cement/ solid Blocks of size 290x100x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 50 kg/ sqcm. for (Super Structure Partition Walls) [for 1st Floor: Brick Masonary (100mm)]

0.4

-

3589.34

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:4) Prop. with Flyash cement/ solid Blocks of size 290x100x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 50 kg/ sqcm. for (Super Structure Partition Walls) [for 2nd Floor: Brick Masonary (100mm)]

0.4

-

3954.69

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:4) Prop. with Flyash cement/ solid Blocks of size 290x100x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 50 kg/ sqcm. for (Super Structure Partition Walls) [for 3rd Floor: Brick Masonary (100mm)]

0.4

-

4319.91

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:4) Prop. with Flyash cement/ solid Blocks of size 290x100x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 50 kg/ sqcm. for (Super Structure Partition Walls) [for 4th Floor: Brick Masonary (100mm)]

0.4

-

4685.2

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:4) Prop. with Flyash cement/ solid Blocks of size 290x100x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 50 kg/ sqcm. for (Super Structure Partition Walls) [for 5th/ Terrace Floor: Brick Masonary (100mm)]

10.49

-

132817.25

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for Stilt Floor: Int. Plastering]

312.33

-

170561.23

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for 1st Floor: Int. Plastering]

364.27

-

211548.06

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for 2nd Floor: Int. Plastering]

364.27

-

224188.13

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for 3rd Floor: Int. Plastering]

364.27

-

236809.98

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for 4th Floor: Int. Plastering]

364.27

-

249431.83

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for INTERNAL WALLS. [for 5th/ Terrace Floor: Int. Plastering]

280.26

-

201633.06

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for Stilt Floor: Ext. Plastering]

347.01

-

194602.65

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for 1st Floor: Ext. Plastering]

141.86

-

84468.75

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for 2nd Floor: Ext. Plastering]

141.86

-

90206.87

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for 3rd Floor: Ext. Plastering]

141.86

-

95952.07

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for 4th Floor: Ext. Plastering]

141.86

-

101697.28

... More
Construction of Commercial Complex;Plastering 12mm thick, base coat in CM (1:5), of 8 mm thick and top coat in CM (1:3), at 4mm thick with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for for EXTERNAL WALLS. [for 5th Floor: Ext. Plastering]

109.8

-

83157.03

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for Stilt Floor: Ceiling Plastering]

385.18

-

87320.53

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for 1st Floor: Ceiling Plastering]

385.18

-

90902.72

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for 2nd Floor: Ceiling Plastering]

385.18

-

97624.12

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for 3rd Floor: Ceiling Plastering]

385.18

-

104307.01

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for 4th Floor: Ceiling Plastering]

385.18

-

111009.16

... More
Construction of Commercial Complex;Plastering 12mm thick Single Coat in CM (1:3) with sponge finishing including cost and conveyance of all materials and water to site, and all operational, incidental charges, scaffolding charges, and all labour charges, curing etc.but excluding seigniorage charges, complete for finished item of work to the required strength as directed by the dept., for CEILING. [for 5th/ Terrace Floor: Ceiling Plastering]

29.42

-

8990.45

... More
Construction of Commercial Complex;Flooring with polished shahabad 18mm thick set over base coat of cm(1;8) over alredy laid ccbed/rcc roof slab,includng neat cement slurry of honey like consistancy spred @3.3kgs per sqm and jointed with neat cement to full depth including cost of all materials like cement, sand,and water and flooring stones etc complete ,excluding seigniorage charges ,labour charges for dressing of flooring stones etc ,complete for finished item of work. for Stilt Floor.

732.99

-

515183.43

... More
Construction of Commercial Complex;Flooring with Vitrified Tiles double charged/ multi charged stain free full body porcelain of size 800mm x 800mm, set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for Stilt Floor: Vitrified Flooring]

8.72

-

13357.96

... More
Construction of Commercial Complex;Flooring with Vitrified Tiles double charged/ multi charged stain free full body porcelain of size 800mm x 800mm, set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 1st Floor: Vitrified Flooring]

326.64

-

512774.23

... More
Construction of Commercial Complex;Flooring with Vitrified Tiles double charged/ multi charged stain free full body porcelain of size 800mm x 800mm, set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 2nd Floor: Vitrified Flooring]

326.64

-

525219.18

... More
Construction of Commercial Complex;Flooring with Vitrified Tiles double charged/ multi charged stain free full body porcelain of size 800mm x 800mm, set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 3rd Floor: Vitrified Flooring]

326.64

-

537660.86

... More
Construction of Commercial Complex;Flooring with Vitrified Tiles double charged/ multi charged stain free full body porcelain of size 800mm x 800mm, set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 4th Floor: Vitrified Flooring]

326.64

-

550109.07

... More
Construction of Commercial Complex;Providing SKIRTING with Vitrified double charged/ multi charged stain free full body porcelain Tiles length eual to flooring stones, set over base coat of cement mortar (1:5),12 mm thick cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for Stilt Floor: Vitrified Skirting]

1.19

-

1812.29

... More
Construction of Commercial Complex;Providing SKIRTING with Vitrified double charged/ multi charged stain free full body porcelain Tiles length eual to flooring stones, set over base coat of cement mortar (1:5),12 mm thick cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 1st Floor: Vitrified Skirting]

12.3

-

19149.83

... More
Construction of Commercial Complex;Providing SKIRTING with Vitrified double charged/ multi charged stain free full body porcelain Tiles length eual to flooring stones, set over base coat of cement mortar (1:5),12 mm thick cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 2nd Floor: Vitrified Skirting]

12.3

-

19619

... More
Construction of Commercial Complex;Providing SKIRTING with Vitrified double charged/ multi charged stain free full body porcelain Tiles length eual to flooring stones, set over base coat of cement mortar (1:5),12 mm thick cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 3rd Floor: Vitrified Skirting]

12.3

-

20087.55

... More
Construction of Commercial Complex;Providing SKIRTING with Vitrified double charged/ multi charged stain free full body porcelain Tiles length eual to flooring stones, set over base coat of cement mortar (1:5),12 mm thick cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. [for 4th Floor: Vitrified Skirting]

12.3

-

20556.11

... More
Construction of Commercial Complex;Flooring with Non-porcelain, Non-skid full body Ceramic floor tiles of size 300mm x 300mm thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (part 1-15) of any colour and finish in all shades and design set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Toilets flooring. [for 1st Floor: Ceramic Flooring]

13.48

-

14610.68

... More
Construction of Commercial Complex;Flooring with Non-porcelain, Non-skid full body Ceramic floor tiles of size 300mm x 300mm thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (part 1-15) of any colour and finish in all shades and design set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Toilets flooring. [for 2nd Floor: Ceramic Flooring]

13.48

-

15124.11

... More
Construction of Commercial Complex;Flooring with Non-porcelain, Non-skid full body Ceramic floor tiles of size 300mm x 300mm thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (part 1-15) of any colour and finish in all shades and design set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Toilets flooring. [for 3rd Floor: Ceramic Flooring]

13.48

-

15638.22

... More
Construction of Commercial Complex;Flooring with Non-porcelain, Non-skid full body Ceramic floor tiles of size 300mm x 300mm thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (part 1-15) of any colour and finish in all shades and design set over base coat of cement mortar (1:8),12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Toilets flooring. [for 4th Floor: Ceramic Flooring]

13.48

-

16151.66

... More
Construction of Commercial Complex;Providing Dadoing with Glazed full body porcelain wall tiles of size 300 x 600mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8mm 1st quality confirming to IS:13711, IS: 13712, IS: 13630) part 1 to 15 of any colour and finish in all shades and designs set over base coat of cement mortar (1:5),12 mm thick over cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Dadoing work in Toilets. [for 1st Floor: Glazed Dadoing]

42.77

-

36848.94

... More
Construction of Commercial Complex;Providing Dadoing with Glazed full body porcelain wall tiles of size 300 x 600mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8mm 1st quality confirming to IS:13711, IS: 13712, IS: 13630) part 1 to 15 of any colour and finish in all shades and designs set over base coat of cement mortar (1:5),12 mm thick over cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Dadoing work in Toilets. [for 2nd Floor: Glazed Dadoing]

42.77

-

37259.56

... More
Construction of Commercial Complex;Providing Dadoing with Glazed full body porcelain wall tiles of size 300 x 600mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8mm 1st quality confirming to IS:13711, IS: 13712, IS: 13630) part 1 to 15 of any colour and finish in all shades and designs set over base coat of cement mortar (1:5),12 mm thick over cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Dadoing work in Toilets. [for 3rd Floor: Glazed Dadoing]

42.77

-

37665.9

... More
Construction of Commercial Complex;Providing Dadoing with Glazed full body porcelain wall tiles of size 300 x 600mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8mm 1st quality confirming to IS:13711, IS: 13712, IS: 13630) part 1 to 15 of any colour and finish in all shades and designs set over base coat of cement mortar (1:5),12 mm thick over cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding seigniorage charges, etc., complete for finished item of work as directed by the Dept. for Dadoing work in Toilets. [for 4th Floor: Glazed Dadoing]

42.77

-

38076.52

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for Stilt Floor: Granite Treads]

23.7

-

92897.62

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for 1st Floor: Granite Treads]

8.23

-

32856.41

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for 2nd Floor: Granite Treads]

8.23

-

33436.57

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for 3rd Floor: Granite Treads]

8.23

-

34016.31

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for 4th Floor: Granite Treads]

8.23

-

34596.47

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar(1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for TREADS (0.3m vide) [for 5th/ Terrace Floor: Granite Treads]

8.23

-

35176.63

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for Stilt Floor: Granite Risers]

10.91

-

39044.33

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for 1st Floor: Granite Risers]

5.51

-

19975.82

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for 2nd Floor: Granite Risers]

5.51

-

20238.23

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for 3rd Floor: Granite Risers]

5.51

-

20500.63

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for 4th Floor: Granite Risers]

5.51

-

20763.04

... More
Construction of Commercial Complex;Providing & fixing high polished granite slab 16 to 18 mm thick other than black and regular colours like multi red /BM brown/ Perpery red and Paradise set over base coat of cement mortar (1:8) , 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete excluding seigniorage charges, labour charges for dressing of tiles etc., complete for finished item of workas directed by the department. for RISERS (0.15m width) [for 5th/ Terrace Floor: Granite Risers]

5.51

-

21025.45

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for Stilt Floor: Internal Painting]

697.51

-

243604.32

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for 1st Floor: Internal Painting]

749.45

-

261744.71

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for 2nd Floor: Internal Painting]

749.45

-

261744.71

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for 3rd Floor: Internal Painting]

749.45

-

261744.71

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for 4th Floor: Internal Painting]

749.45

-

261744.71

... More
Construction of Commercial Complex;Providing and applying Synthetic Plaster Putty or Plaster of Paris putty or Lime Punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powered materials, applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hrs, sand with 180 and 320 No., emery paper for the surface prepartion including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc,. and Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for INTERNAL WALLS AND CEILING. [for 5th/ Terrrace Floor: Internal Painting]

309.68

-

108155.39

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 1st Floor: External Painting]

347.01

-

212976.77

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 1st Floor: External Painting]

141.86

-

87064.73

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 2nd Floor: External Painting]

141.86

-

87064.73

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 3rd Floor: External Painting]

141.86

-

87064.73

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 4th Floor: External Painting]

141.86

-

87064.73

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS. [for 5th/ Terrace Floor: External Painting]

109.8

-

67389.75

... More
Construction of Commercial Complex;Providing Impervious Coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1 kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding seigniorage charges, and including conveyance charges of materials, all operational, incidental and labour charges for mixing mortar, laying , rendering smooth and thread lining, curing , rounding off junctions of wall and slab etc., complete for finished item of work, for Terrace. or 5th/ Terrace Floor:

416.43

-

290648.71

... More
Construction of Commercial Complex;Supply and fixing 110mm Dia. 4.00 Kg/Sqm pressure PVC pipe of Prince/ Sudhakar /Kisan/ Supreme or any ISI brand of make as per ISI 1st class from roof up to basement level including plain bend at top, clips and shoe at bottom and fixed to wall with pipe clips including cost and conveyance of all materials to work site, fixing of wooden gutties, plugs, nails and all labour charges etc., complete for finished item of work as directed by the department for Rain water down take pipe of each pipe legth 12.70 Mts..

9

-

1688.85

... More
Construction of Commercial Complex;Supplying and fixing aluminium composite cladding with skin material 0.25 mm thick aluminium sheet cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work including necessary accessories complete in all respects including all scaffolding and labour charges etc., complete for finished item of work but excluding cost of structural steel fabrication, if any, ACP Cladding -3 mm thk.

411.39

-

1023163.09

... More
Construction of Commercial Complex;Providing and fixing Structural Glazing fabricated from roll formed sections made of pre-painted steel/powder coated (base steel as per IS 513 of "D" quality. Galvanized as per IS 277 with Zinc of 120Gm/Sqm) with total coated thikness of 0.72mm and the glass holding section made of 304 grade stain less steel section as stiffeners inside the colour coated steel powder coated sections are per the design requirements & Calculations to suit wind pressures as given in IS:875, the primer coat with epoxy primer of 5-7 microns thick finished painted with a polyster paint of 12-16 microns thick and back coated with alkyed baker of 5-7 microns or powder coated with pure polyster powder upto 50-60 microns thickned the vertical section of 50 mm x 99 mm x 0.72 mm, 33mm x 56mmx 0.72mm for frame haorizontal section, stiffen section of 47 mm x 97 mm x1mm cover profiles section of 20mm 58mm x0.58mm, glass holding section of 37mm x37mm and 37mm x18mm including fixing 5mm thick ocen blue reflective black, brackets made of CRCA powder coated/ electroplated to connect vertical to horizontal vertical to slab, to fix vertical to top and bottom as per site requirment and gasket made of ethyl propylene diamine monomer, U.V.resistant silicon sealant including fixing and Concrete masonry wall with self- expanding cap and screw inclusive of cost and conveyanceof all materials to site, all labour chargers, incidental chargers, cost of all cosumable etc. and fixing chargers complete for finished item of work.

253.49

-

1908041.81

... More
Construction of Commercial Complex;Providing and fixing Cladding to internal walls with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5), 12mm thick using screened sand over the rough plastered surface including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement, sand, water, granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and excluding seigniorage charges, cost of base coat and overheads & contractors profit complete for finished item of work [for Stilt Floor: Wall Cladding]

8.28

-

35387.06

... More
Construction of Commercial Complex;Providing and fixing Cladding to internal walls with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5), 12mm thick using screened sand over the rough plastered surface including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement, sand, water, granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and excluding seigniorage charges, cost of base coat and overheads & contractors profit complete for finished item of work [for 1st Floor: Wall Cladding]

8.28

-

36541.71

... More
Construction of Commercial Complex;Providing and fixing Cladding to internal walls with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5), 12mm thick using screened sand over the rough plastered surface including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement, sand, water, granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and excluding seigniorage charges, cost of base coat and overheads & contractors profit complete for finished item of work [for 2nd Floor: Wall Cladding]

8.28

-

37037.27

... More
Construction of Commercial Complex;Providing and fixing Cladding to internal walls with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5), 12mm thick using screened sand over the rough plastered surface including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement, sand, water, granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and excluding seigniorage charges, cost of base coat and overheads & contractors profit complete for finished item of work [for 3rd Floor: Wall Cladding]

8.28

-

37861.54

... More
Construction of Commercial Complex;Providing and fixing Cladding to internal walls with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5), 12mm thick using screened sand over the rough plastered surface including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement, sand, water, granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and excluding seigniorage charges, cost of base coat and overheads & contractors profit complete for finished item of work [for 4th Floor: Wall Cladding]

8.28

-

38686.23

... More
Construction of Commercial Complex;DOOR of SIZE 0.91 x 2.10 (D1) :- Providing and fixing DOOR FRAME fabricated from sections made of galvanized stell powder coated (base steel as per IS 513, galvanized as per IS.277 with Zinc of 120 grams/square meter) the factory made section should be with a powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30 mm thick Door Shutter with groove to insert gasket in the frame section. frame section filled with polyurethane foam, cut to length and joined by way of welding each frame provide with :: (a) 2mm thick ms powder coated butt hinges of 100mm long -3 Nos for Single shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mmx200mmx1.20mm hold fasts screwd to stiffeners-6 Nos with split end tail (d) Nylon Aldrops receiver - 1 No for single shutter frame (e) Tie Road - 1 No. and supplying and fixing of single Leaf Flush Door Shutter Solid Bond Wood black Board type with COMMERCIAL PLY ON BOTH FACES of 30 mm thick conforming to IS.2202 including cost of fixtures such as 2 Nos-250mm long M.S. Powder Coated Aldrops, 2 Nos-150mm long M.S.Powder coated Handles, 1 No- 250mm long M.S.Powder Coated tower Bolts., 1 No . M.S.Powder Coated door stopper, hings etc.,and including cost and conveyance of all materials to work site and all labour chargers for fixing etc.,complete as directed by the department.

12

-

99642

... More
Construction of Commercial Complex;PVC DOOR FRAME OF SIZE 0.76 x 2.10:- Providing and fixing factory made polyVinyl Chloride (PVC) Door Frame of the Size 50x 47 mm with a wall thickness of 5 mm, made out of extruded 10mm rigid PVC foam sheet, mitre cut at two corners and joined with2 Nos.of 150mm long brackets of 15x 15mm M.S.Square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4 Nosof screws to be provuded for each vertical menbers and minimum 2 Nos for horizontal member etc., complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work. PVC Door SHUTTER:- Providing and fixing 30mm thick solid panel PVC Door Shutter consisting of frame made out of M.S.Tubes of 19 gauge thickness and size of 19mm x 19mm for stiles,and 15mmx15mm for top and bottom rails, M.S. frame shall have a coat of steel primers of approved make ilicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges and rerction at site with complete finished item of work. b) window with Two Sliding Shutters and with grill outer frame size 90mmx 50mm have a rebate of 15mmx 5mm to fit grill made of 10mm MS Sq Rods for horizontalbars welded at aregular pitch of 150mm to 12mm x 6mm MS flat. Size window : 1.80 x 1.20 Mtsc., Complete as directed by the department the solvent cement adhesive etc., An additional 5 mm thick PVC strip of 20mm width is to be stuck on the interior side of the "C" Channel using PVC solvent adhesive etc., complete as per direction of Engineer- in-charge, Manufacture's specification and drawing for finished item of work for WC doors.

8

-

46354.4

... More
Construction of Commercial Complex;Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS513, Dquality, galvanized as per IS 277withZinc of 120GSM), using factory made section powder coated with Pure polyester powder upto 50-60microns thick with total coated thickness of 0.58mm forOuter Frame and 0.58mm thickness for Sliding Shutter Section, the Outer Framefor TwoTracks with Grill provision size of 90 mm x 50 mm and without grill provision is of 75 mm x50mm and the Window Shutter section o f 0.58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the shutter/ sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made ofAlumimium 1 No.per each shutterand cut to length miterjoined with corner brackets including installation of window system at site using anchor fasteners,Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges and erection at site with complete finished itemof work. b) Window with Two Sliding Shutters and with Grill Outer Frame Size 90mmx 50 mm have a rebate of 15mm x 5mm to fit grill made of 10mm MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to 12mm x 6mm MS flat. Size of Window : 1.80 x 1.20 Mts

5

-

69291.25

... More
Construction of Commercial Complex;Ventilator of size 0.61 x 0.61 mt::- Providing and fixing of top hung ventilator with flymesh made of pre-painted steel windows & top hung and fixed louvered ventilators made of pre-painted steel (base steel as per IS 513 of -0.8 mm thick, galvanized as per IS 277 with Zinc of 120 GSM), finish painted with polyester paint of 60-65 microns thick and section for outer frame of 100x45mm centre mullion of 100x 60mm, and section for shutter of 52x25mmx0.6mm thick, section for fly-shutter of 52x25mmx0.6mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade with 144 holes per Sq.inch and mullions to have double rebate for glazed shutter and fly shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No.of High grade nylon latch handle, window stopper, 2 Nos.of with MS Powder coated/ SS ball bearing butt hinges provided per shutter and windows fitted with 4mm thick plain float glass with rubber gaskets including fixing the frames in concrete/ masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., single openable ventilator shutter window size of 2'0"x2'0"(609.6x609.6mm) outer frame section size of 100x45mm, Glazed and flymesh shutter frame section size of 52x25mm thick.complete for finished item of workVentilators : Top lovers 2'-0"x2'0"(609.6x609.6mmBox section) outer frame section size of 33mmx56mm.

12

-

34818

... More
Construction of Commercial Complex;supply and fixing powder coated Aluminium fully Glazed swing Door (D) as per the approved drawing with aluminium anodised section of jindal sections with fixed fan light of 500mm height at top door using aluminium sections of outer frame 2408 of size 101.60 mmx 44.45mm, 3.18mm thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick for shutter 4504 of size 47.62x44.45x3.18mm and middle lock rail of 4621 of size 49.91x44.45x3mm and bottom rail of 14.3x44.45x3.18mm and 5mm thick plain float glassfitted with suitable aluminiumglazing clips and rubber beading shutters mounted on double action hydraulic floor spring of approved brand for doors including cost of cutting floors as required, embedding in floors including supply and fixing ISI marked powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt ( IS:204 300mm long, 4 NOs. alluminium handles (IS:208)150mm dia and 2 Nos . aldrops (IS:2681) 300mm long including labour charges for manufacturing door, fixing the door with required No.of screws etc., including overheads & contractors profit complete for finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948-1961) and as approved by the Engineer)(1820mmx 2600mm) main Door & Lobby doors of Size 1.82m x 2.60m(D).

4

-

149415.6

... More
Construction of Commercial Complex;Supply and fixing of stainless steel (grade 304) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium calss and vertical posts of 25mm dia and 1.6mm thick medium class 2 nos for each step fixed with base plate of 75mm dia using bonding agent and anchorefastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing riling , buffing, polishing all members of the railing thouroughly ,lacquer finishing to present seemless finish encluding cost conveyance of all meterials, electrodes, welding charges, cost of all consumables, labour charges for finished item of work. for Staircase hand railing.

36

-

188501.4

... More
Construction of Commercial Complex;R.R.Masonary in C.M.(1:8) Prop. using hard stone other than granite including cost and conveyance of all materials, labour charges, curing etc., complete for FOUNDATION AND BASEMENT.

11.45

-

47271.8

... More
Construction of Commercial Complex;Supplying, laying, jointing and testimg of 110mm Dia. (S.16.5) unplasticized Non-pressure Polyviny Chloride (PVC-U) Pipes of dark (any shade of Brown) for use in Underground Drainage & Sewerage System conforming to IS.15328/2003) with Solvent Cement Jointing including transportation charges, loading, unloading and excluding taxes and including cost and conveyance of all materials to site of work and all labour charges such as laying, jointing including excavation of trenches and socket pits in any soil (except rock required blasting) upto a depth of 3'-0" and refilling the same after laying the pipe line with excavated soil etc., over heads & contractor profit complete for finished item of work as directed by the department.

54.9

-

18899.33

... More
Construction of Commercial Complex;Supplying, laying, jointing and testimg of 160mm Dia. (S.16.5) unplasticized Non-pressure Polyviny Chloride (PVC-U) Pipes of dark (any shade of Brown) for use in Underground Drainage & Sewerage System conforming to IS.15328/2003) with Solvent Cement Jointing including transportation charges, loading, unloading and excluding taxes and including cost and conveyance of all materials to site of work and all labour charges such as laying, jointing including excavation of trenches and socket pits in any soil (except rock required blasting) upto a depth of 3'-0" and refilling the same after laying the pipe line with excavated soil etc., over heads & contractor profit complete for finished item of work as directed by the department.

60

-

41175

... More
Construction of Commercial Complex;Supplying and fixing of 150mm x 100mm SWG Gully Trap1st class of ISI make confirming to ISI 651 & 4127 with C.I. gratings of 6" x 6" and constructing intermediate brick masonry chamber of size 20"x14"x12" in CM (1:6) prop. over a bed of CC (1:5:10) prop. 3" thick and plastering 12mm thick in CM (1:3) prop. both inside, outside & top with fine rendering with neat cement and fitted with 12" x 9" C.I. frame and hinged cover etc. overheads& contractor profit etc, complete for finished item of work.

4

-

2308.8

... More
Construction of Commercial Complex;Construction of 3'-0" (904.0mm) Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc. overheads& contractor profit, complete for finished item of work as per standard specification.

2

-

13565.7

... More
Construction of Commercial Complex;Construction of 3'-0" (904.0mm) Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc. overheads& contractor profit, complete for finished item of work as per standard specification.

3

-

32022.45

... More
Construction of Commercial Complex;Construction of 457.20 mm x 457.20 mm (1-6"x1-6") Brick masonry INSPECTION CHAMBER with 9" thick brick masonry work in C.M (1:6)prop. with necessary carbelling as per ISI standard upto a depth of 3'-0" over a bed of 4' thick CC(1:5:10) prop. including plastering in CM(1:3)Prop. 1/2" thick to Inside, Outside & Top surfaces with fine rendering in neat cement and making necessary C.C channelling with CC(1:2:4) prop. with smooth neat cement finishing, earth work excavation in all soils (except rock required blastering) etc., and refilling with excavated soils as per SS and fixing with 1'-6"x1'-6" C.I frame and cover of 20 Kg including cost and conveyance of all materials and cost of steel and its fabrication charges to site of work and labour charges, curing etc., overheads& contractor profit, complete for finished item of work.

6

-

23130

... More
Construction of Commercial Complex;Supplying and fixing of 110mm Dia UPVC/SWR pipes of Sudhakr/Price/Kisan/Supreme of approved with any ISI standards of 6kg./Sq.Cms. of single socket pipe with air tight joints,fixing with clams,clips, and nails etc.,complete for (Vent Shaft) W.C.Connection inculding cost and conveyance of all materials to work site labour charges for fixing and commissioning the pvc pipes including couplers/bends etc of any diameter including fittings like bends, tees ,couplers ,junctions ,plugs etc with solvent jointings as per standarad practice ,excluding taxes. overheads& contractor profit complete for finished item of work.

36

-

10594.8

... More
Construction of Commercial Complex;Supplying & fixing of 110mm Dia UPVC/SWR DOUBLE "Y" with Door of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

2

-

463.6

... More
Construction of Commercial Complex;Supplying & fixing of 110mm Dia UPVC/SWR VENT COWL of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

2

-

38.7

... More
Construction of Commercial Complex;Supplying & fixing of 110mm Dia UPVC/SWR DOOR BEND 87.5 Degree of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

16

-

1727.2

... More
Construction of Commercial Complex;Supplying and fixing of 75mm Dia UPVC/SWR pipes of Sudhakr/Price/Kisan/Supreme of approved with any ISI standards of 6kg./Sq.Cms. of single socket pipe with air tight joints,fixing with clams,clips, and nails etc.,complete for (Vent Shaft) W.C.Connection inculding cost and conveyance of all materials to work site labour charges for fixing and commissioning the pvc pipes including couplers/bends etc of any diameter including fittings like bends, tees ,couplers ,junctions ,plugs etc with solvent jointings as per standarad practice ,excluding taxes. overheads& contractor profit complete for finished item of work.

75.96

-

12168.79

... More
Construction of Commercial Complex;Supplying & fixing of 75mm Dia UPVC/SWR DOUBLE "Y" with Door of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

6

-

790.8

... More
Construction of Commercial Complex;Supplying & fixing of 75mm Dia UPVC/SWR SINGLE "Y" with Door of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

8

-

754.4

... More
Construction of Commercial Complex;Supplying & fixing of 75mm Dia UPVC/SWR SINGLE "Tee" with Door of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

4

-

291

... More
Construction of Commercial Complex;Supplying & fixing of 75mm Dia UPVC/SWR VENT COWL of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

4

-

54.6

... More
Construction of Commercial Complex;Supplying & fixing of 75mm Dia UPVC/SWR DOOR BEND 87.5 Degree of Sudhakar/Kisan Prince/Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & contractor profit complete for finished item of work.

8

-

536.8

... More
Construction of Commercial Complex;Supplying and fixing of 101.6mm (4") Dia.multi floor trap with jalli for UPVC/SWR pipe fittings of Sudhakar/ Prince/ Kisan/ Supreme or any ISI make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc,. overheads & contractor profit, complete for finished item of work.

20

-

2886

... More
Construction of Commercial Complex;Supplying and fixing of premium make of ASHIRVAD/ AJAY/ ASTRAL FLOWGUARD or equivalent CPVC PIPES of 15.90mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., solvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings,excluding all taxes,overheads & cotractor profit complete for finished item of work as directed by the dept.

8.28

-

602.37

... More
Construction of Commercial Complex;Supplying and fixing of premium make of ASHIRVAD/AJAY/ASTRAL FLOWGUARD or equivalent CPVC PIPES of 28.60mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., solvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings,excluding all taxes,overheads & cotractor profit complete for finished item of work as directed by the dept.

37.68

-

6465.89

... More
Construction of Commercial Complex;Supplying and fixing of premium make of ASHIRVAD/AJAY/ASTRAL FLOWGUARD or equivalent CPVC PIPES of 34.90mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., solvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings,excluding all taxes,overheads & cotractor profit complete for finished item of work as directed by the dept.

189.95

-

51799.37

... More
Construction of Commercial Complex;Supplying and fixing of premium make of ASHIRVAD/AJAY/ASTRAL FLOWGUARD or equivalent CPVC PIPES of 41.30mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., solvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings,excluding all taxes,overheads & cotractor profit complete for finished item of work as directed by the dept.

40.7

-

15213.66

... More
Construction of Commercial Complex;Supplying and fixing of premium make of ASHIRVAD/AJAY/ASTRAL FLOWGUARD or equivalent CPVC PIPES of 54.00mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., solvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings,excluding all taxes,overheads & cotractor profit complete for finished item of work as directed by the dept.

197.15

-

113341.54

... More
Construction of Commercial Complex;Supplying and fixing of 50mm N.B. size Gunmetal Gate Valve (G.M.Peet) as per IS.778, Class-I of Indian make heavy type including cost and conveyance of all materials to work site and all jointing materials, labour charges etc.,overheads & cotractor profit complete, for finished item of work as directed by the dept. complete .

6

-

22536.9

... More
Construction of Commercial Complex;Supplying and fixing of 12.70mm Dia. N.P. Bib Tap heavy duty of make Seiko/ Senior/ Nice or equivalent of any approved make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc, overheads & cotractor profit complete. for finished item of work.

8

-

3326.8

... More
Construction of Commercial Complex;Supplying and fixing of 50.80mm G.I.Union of 1st quality of any approved make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & cotractor profit complete. for finished item of work.

2

-

304.5

... More
Construction of Commercial Complex;Supplying and fixing of 38.10mm G.I.Union of 1st quality of any approved make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & cotractor profit complete. for finished item of work.

5

-

613.5

... More
Construction of Commercial Complex;Supplying and fixing of 19.05mm G.I.Union of 1st quality of any approved make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., overheads & cotractor profit complete. for finished item of work.

5

-

272.75

... More
Construction of Commercial Complex;Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit complete for finished item of work for all floors.

8

-

11527.2

... More
Construction of Commercial Complex;Supplying and fixing of 16mm to 20 mm thick (average 0.61m width of any length) polished marble slab of any variety and gang saw cut (such as Dongari/ Adanga/ Maroth/ Rajgunpur ect.,) partitioins of size 4' 0" x 2' 0" for urinals including full rounding the edges, fixing in position, polishing, including cost and conveyance of all materials and labour charges, overheads & contractors profit complete for finished item of work for all floors.

4

-

12837.2

... More
Construction of Commercial Complex;Supplying and fixing of 4" x 24" (101.60 x 609.60mm) white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work for all floors.

8

-

4481.2

... More
Construction of Commercial Complex;Supply, Instllation and commissioning approved make floor mounted Close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern,ultra solid seat cover of approvadmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc., complete for finished item of work in all respects: White Colour

8

-

78676.8

... More
Construction of Commercial Complex;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

8

-

19774.8

... More
Construction of Commercial Complex;Supplying and fixing Chrome plated bib cock cum health faucet with 1m long flexible tube and wall hook of Jaquar make queen series/Jupiter Aqua Lines-JAL-make Nira as approved by Engineer-In-Charge with 7 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

8

-

35793.6

... More
Construction of Commercial Complex;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

20

-

1846

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Sump & Water tank side walls) 200mm Thick [At Basement floor tanks]

3.6

-

59387.22

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Sump & Water tank side walls) 200mm Thick [At Terrace floor tanks]

1.13

-

22256.59

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code from standard suppliers approved by the department including pumping, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Roof Slab)125mm thick [At Basement floor tanks]

10.92

-

138499.45

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code from standard suppliers approved by the department including pumping, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work (for Roof Slab)125mm thick [At Terrace floor tanks]

2.96

-

42229.89

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [At Basement floor tanks]

0.43

-

39286.94

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works [At Terrace floor tanks]

0.37

-

37351.09

... More
Construction of Commercial Complex;Providing Impervious Coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1 kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding seigniorage charges, and including conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying , rendering smooth and thread lining, curing , rounding off junctions of wall and slab etc., complete for finished item of work, for Terrace.

16.91

-

11798.84

... More
Construction of Commercial Complex;Plastering with CM (1:5), of 12 mm thick in single coat with. Screened sand with sponge finishing including cost and coneyance of all meterials hacking surface, scaffolding, leads, lifts and labour charges etc., complete for INTERIOR AND EXTERIOR WALLS of Sump and Water tanks. [At Basement floor tanks]

130

-

25025

... More
Construction of Commercial Complex;Plastering with CM (1:5), of 12 mm thick in single coat with. Screened sand with sponge finishing including cost and coneyance of all meterials hacking surface, scaffolding, leads, lifts and labour charges etc., complete for INTERIOR AND EXTERIOR WALLS of Sump and Water tanks. [At Terrace floor tanks]

37.62

-

7242.81

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code from standard suppliers approved by the department including pumping, centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for Precast Slabs for manhole cover

0.43

-

3588.34

... More
Construction of Commercial Complex;Earth Work Excavation in ordinary soil by Manual Means up to 3m depth with an initial lead of 10 Mts including all operational, incidental, labour charges etc cmplete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS-20B (APSS 308). (for Foundations)

70.11

-

19890.21

... More
Construction of Commercial Complex;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing, excluding seigniorage charges etc., complete. for bed of drains.

14.68

-

74639.73

... More
Construction of Commercial Complex;Brick Masonry work in CM(1:6) Prop. with Flyash cement/ solid Blocks of size 290x225x140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs, gypsum of 5 kgs and stone dust including cost and conveyance of all materials , labour charges, scaffolding , curing etc., and excluding seiniorage charges complete with a compresive strength not less than 75 kg/ sqcm. for (Super Structure Main Walls)

20.42

-

162676.95

... More
Construction of Commercial Complex;Plastering 12mm thick in Single Coat with CM(1:5) Prop. with sponge Finishing including cost and conveyance of all materials and water to work site and all operational, incidental charges, scaffolding charges, labour charges, curing etc., complete for finished item of work (for Interior and Exterior walls of drains)

231.16

-

44498.3

... More
Construction of Commercial Complex;Supplying and placing of Plain Cement Concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges and labour charges such as weigh batching, laying concrete, curing etc., complete for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code centering charges such as steel scaffolding pipes, jack props, Acro spans, wallers, foot plates, brackets steel centering plates etc, shuttering, vibrating etc., complete for finished item of work for Precast Slabs

12.08

-

100340.71

... More
Construction of Commercial Complex;Supplying, installation, testing and commissioning of electric driven main fire pump suitable for automatic operation and consisting of following : complete in all respect as required. a) Horizontal type, multistage, centrifugal, split casing pump of cast iron body & bronze impeller with stainless steel shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg / sq.cm. at highest and farthest outlet at specified flow of 2280 lpm at 70 Mtr. head conforming to IS 1520 b) Suitable HP SQ cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation on 15Volts, 3 phase 50 Hz. AC with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325 c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required. d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps: Kirloskar / Mather&Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

1

-

470366.1

... More
Construction of Commercial Complex;Supplying , installation, Testing and commissioning of diesel engine driven main fire pump suitable for automatic operation and consisting of following : complete in all respect as required. a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg /sq.cm. at highest and farthest outlet at specified flow of 2280 lpm at 70 Mtr head conforming to IS 1520. b) Suitable HP, 1500 RPM water cooled with radiator, diesel engine conforming to relevant BS & IS standard complete with auto starting mechanism, 12 Volts / 24 Volts electric starting equipment, Diesel Tank, exhaust pipe extended upto 1 m. outside pump house duly insulated with 50mm thick glass wool with 1.0mm thick alluminium sheet cladding, residential silencer, instruments and protection as per specification, stop solenoid for auto stop in the event of fault with audio indications, painted with post office red colour etc as required. c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required. d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Engines : Kirloskar / Cummins. Makes of Pumps : Kirloskar / Mather&Platt

1

-

783943.5

... More
Construction of Commercial Complex;Supplying , installation , testing and commissioning of electric driven pressurisation / Jockey pump suitable for automatic operation and consisting of following : complete in all respect as required. a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel haft,mechanical seal and flow of 180 lpm at 120 Mtr head conforming to IS 1520. b) Suitable HP SQ cage induction motor TEFC type suitable for operation on 415Volts, 3 phase 50 Hz. AC with IP 55 class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required. d) Suitable cement concrete foundation duly plastered with anti vibration pads. Complete for finished item of work. Makes of Pumps : Kirloskar / Mather&Platt. Makes of Motors : Siemens/ ABB/ Kirloskar

1

-

143723

... More
Construction of Commercial Complex;Supplying , installation , testing and commissioning of electric driven Terrace / Booster pump suitable for automatic operation and consisting of following : complete in all respect as required. a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel shaft, mechanical seal and flow of 900 lpm at 45 Mtr head conforming to IS 1520. b) Suitable HP SQ cage induction motor TEFC type suitable for operation on 415Volts, 3 phase 50 Hz. AC with IP 55 class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required. Complete for finished item of work.

1

-

73168.1

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 200mm dia.

20

-

80440

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 150mm dia.]

126

-

386523.9

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 100mm dia.]

30

-

57262.5

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 80mm dia.]

20

-

25359

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 65mm dia.]

72

-

68716.8

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 50mm dia.]

81

-

61843.5

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 40mm dia.]

20

-

12953

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 32mm dia.]

685

-

350240.5

... More
Construction of Commercial Complex;Providing , laying, testing & Commissioning of following classes MS pipes (C - Class) conforming to IS 3589 and 1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., Complete for finished item of work. Makes: Jindal / Hissar / Tata pipes [MS Pipes (C- Class) 25mm dia.]

2430

-

828265.5

... More
Construction of Commercial Complex;Supplying and fixing single headed Internal / External hydrant valve with instantaneous Gun metal couplings of 63mm dia with Cast iron wheel ISI marked conforming to IS 5290 (Type -A) with blank Gun Metal cap and chain as required. Complete for finished item of work. Makes: Newage/ Winco/ Padmini / Safex/Minimax

9

-

85842

... More
Construction of Commercial Complex;Supplying, fixing, testing and commissioning of butterfly valve PN 1.6, with Bronze / Gun metal seat duly ISI marked complete with Nuts, Bolts, Washers, gaskets, conforming to IS 13095 of following sizes as required. Complete for finished item of work. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Butterfly valve 200mm dia.]

1

-

6402.25

... More
Construction of Commercial Complex;Supplying, fixing, testing and commissioning of butterfly valve PN 1.6, with Bronze / Gun metal seat duly ISI marked complete with Nuts, Bolts, Washers, gaskets, conforming to IS 13095 of following sizes as required. Complete for finished item of work. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Butterfly valve 150mm dia].

5

-

26784.75

... More
Construction of Commercial Complex;Supplying, fixing, testing and commissioning of butterfly valve PN 1.6, with Bronze / Gun metal seat duly ISI marked complete with Nuts, Bolts, Washers, gaskets, conforming to IS 13095 of following sizes as required. Complete for finished item of work. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Butterfly valve 100mm dia.]

1

-

4116.3

... More
Construction of Commercial Complex;Providing, installation, testing and commissioning of dual plate Flat type non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Non - Return valve 200mm dia.]

1

-

12020.5

... More
Construction of Commercial Complex;Providing, installation, testing and commissioning of dual plate Flat type non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Non - Return valve 150mm dia.]

4

-

34493.6

... More
Construction of Commercial Complex;Providing, installation, testing and commissioning of dual plate Flat type non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto /Valtree [Non - Return valve 100mm dia.]

1

-

4573

... More
Construction of Commercial Complex;Supplying and fixing 63mm dia, 15 mtr long RRL hose pipe with 63mm dia Male and Female Gun metal / SS couplings duly binded with GI wire, rivets etc conforming to IS 636 (Type -A) as required. Complete for finished item of work. Makes: Newage/ Winco/ Padmini / Safex / Minimax

18

-

132418.8

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of cast iron Y ? Stainer flanged end with SS mesh of following sizes confirming to IS specifications complete with rubber gasket, GI bolts , nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / NVR/ Leader / Zolotto. [Y - Stainer 200mm dia.]

1

-

22211.75

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of cast iron Y ? Stainer flanged end with SS mesh of following sizes confirming to IS specifications complete with rubber gasket, GI bolts , nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / NVR/ Leader / Zolotto. [Y - Stainer 150mm dia.]

3

-

31357.8

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of cast iron Y ? Stainer flanged end with SS mesh of following sizes confirming to IS specifications complete with rubber gasket, GI bolts , nuts, washers etc as required. Complete for finished item of work. Makes: Audco / Kirloskar / NVR/ Leader / Zolotto. [Y - Stainer 100mm dia.]

1

-

5618.3

... More
Construction of Commercial Complex;Supply and delivery of"Resilient seated soft sealing" Gate Valves (DI .D/F SLUICE VALVE ). with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS 1865, IS 3896-2 and Wedge fuly Rubber Lined with food grade quality gradeW270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vaccum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostati Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 type A Flange driling as per IS-1538 excluding all taxes, duties (inclusive of transportation). Complete for finished item of work. [Sluice Valve 200mm dia.]

2

-

57214.3

... More
Construction of Commercial Complex;Supply and delivery of"Resilient seated soft sealing" Gate Valves (DI .D/F SLUICE VALVE ). with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS 1865, IS 3896-2 and Wedge fuly Rubber Lined with food grade quality gradeW270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vaccum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostati Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 type A Flange driling as per IS-1538 excluding all taxes, duties (inclusive of transportation). Complete for finished item of work. [Sluice Valve 150mm dia.]

1

-

22045.85

... More
Construction of Commercial Complex;Supplying and fixing of First -Aid Hose Reel with MS construction spray painted in Post office Red, Conforming to Is 884 with upto date amendments, complete with the following as required. a) 36.6 Mtr Long 20mm (Nominal internal) dia water hose Thermoplastic / Textile reinforced / Rubber braided / Polypropylene Type - 2 as per IS:12585 Makes: Eversafe/ Reliance/ Newage/ SRI / Safex. b) 20mm (Nominal internal) dia gun metal globe valve and nozzle. Makes: Newage/ Winco/ Padmini / Safex. c) Drum and brackets for fixing the equipments on wall. d) Connections from riser with 25mm dia stop valve (gun metal) & MS pipe. Complete for finished item of work.

5

-

43770.5

... More
Construction of Commercial Complex;Supplying and fixing of hose cabinet of size 750mm X 600mm x 250mm made of No 16 gauge SWG CRCA sheet with 6mm thick glazed glass door including necessary locking arrangement suitable to accommodate 2 Nos 15 mtr long Hose pipe, 1 No branch pipe, mounted on wall OR raised brick platform and duly painted with Post office red externally and white internally with synthetic enamel paint complete in all respect, for external hydrant as required. Complete for finished item of work.

9

-

34101.9

... More
Construction of Commercial Complex;Supply and fixing 63mm dia Gun metal branch pipe with 20mm (Nominal internal diameter) size Gun metal / SS nozzle conforming to IS 903, suitable for instantaneous connection to interconnect hose pipe coupling as required. Complete for finished item of work. Makes: Newage/ Winco/ Padmini / Safex / Minimax

9

-

25870.5

... More
Construction of Commercial Complex;Supply and fixing 4 way fire brigade connection of cast iron body with 4 Nos Gun metal Male instantaneous inlet couplings complete with cap and chain as required for 150mm dia MS pipe connection, conforming to IS 904 as required. Complete for finished item of work. Makes: Newage/ Winco/ Padmini / Safex / Minimax

1

-

10452.6

... More
Construction of Commercial Complex;Supply and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200mm in height with air release valve on top and flanged connection to riser, drain arrangement with 25mm dia Gun metal wheel valve, with required accessories, pressure gauge and painting with synthetic enamel paint of approved shade as required. Complete for finished item of work.

1

-

18684

... More
Construction of Commercial Complex;Providing fixing, testing and commissioning of 15mm size quartzoid bulb type sprinklers of rating 68º C. pendent / side wall with required accessories. Complete for finished item of work. Makes: HD / TYCO / VIKING / NEWAGE/ SHARP / SAFEX

196

-

112680.4

... More
Construction of Commercial Complex;Providing and fixing of Pressure Switch in the MS pipe Line including connection etc as required. Complete for finished item of work. Makes : Danfoss / Indfoss / Approved makes

4

-

11761.6

... More
Construction of Commercial Complex;Providing and fixing Flow Switches in 100mm dia MS pipe. Complete for finished item of work. Makes : System Sensor / Switzer / Approved makes

5

-

31357.75

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of Bourden type, stainless steel dial type pressure gauge with isolation valve and pipe having calibration of 0-16 kg/cm2. Complete for finished item of work. MAKES: HGURU / FIEBIG and Approved makes

4

-

3135.8

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of 25mm dia Gate valve Complete for finished item of work. Makes : Zoloto / Leader / Valtree or Approved makes

5

-

6862.5

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of 25mm dia Ball valve. Complete for finished item of work. Makes : Zoloto / Leader / or Approved makes

5

-

3789.25

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of 25 / 20mm dia Air Release valve. Complete for finished item of work. Makes : Zoloto / Leader / or Approved makes

2

-

2874.5

... More
Construction of Commercial Complex;Supply, installation, testing and commissioning of Flexible Sprinkler hose of Size with 1500mm length. Complete for finished item of work. Makes : Tyko/Newage/HD

168

-

274478.4

... More
Construction of Commercial Complex;Providing, fixing, testing, commissioning of installation control valve of Cast iron body and brass / Bronze working parts comprising of water, motor alarm, bronze seat clapper, and clapper arm, hydraulically driven mechanical gong bell to sound continuous alarm when the Wet riser / Sprinkler system activates, pressure gauges, emergency releases, strainer, pressure switch, cock valve complete with drain valve and bypass , test control box, ball valves, Ms pipe of required size, flanges, orifice plate, gasket etc of size 150mm dia as required. Complete for finished item of work. Makes : HD / TYCO / NEWAGE

1

-

52262.9

... More
Construction of Commercial Complex;Supplying and wrapping the anticorrosive material for buried pipes with coating of Primer and wrapping with 4 mm thick polymer corrosion resistant tape as per IS :10221 with 15 mm overlap as per specificatios. Complete for finished item of work.

30

-

11760

... More
Construction of Commercial Complex;Supply, fabricating , installing structural steel supports for fixing all sizes of MS pipes from ceiling / wall with MS Channels, Angles, Flats, Rods, as required at site with anchor fasteners, Clamps, threaded rods, nuts, bolts,washers etc complete with painting. Complete for finished item of work.

750

-

61350

... More
Construction of Commercial Complex;Supply & laying of of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured aluminium cable as per specification confirming to IS:7098 (Part - I) Complete for finished item of work. Makes: Torent / Universal / Unicab / Havells / KEI / Gloster / Polycab / CMI

40

-

32994

... More
Construction of Commercial Complex;Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade armoured copper cable as per specification confirming to IS:7098 (Part - I) Complete for finished item of work. Makes: Torent / Universal / Unicab / Havells / KEI / Gloster / Polycab / CMI

60

-

37017

... More
Construction of Commercial Complex;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured copper cable as per specification confirming to IS:7098 (Part - I) Complete for finished item of work. Makes: Torent / Universal / Unicab / Havells / KEI / Gloster / Polycab / CMI

40

-

41040

... More
Construction of Commercial Complex;Supply of 10 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all taxes etc., Complete for finished item of work. Makes: Universal / CCI / Unicab / Polycab / Finolex / KEI /Havells.

30

-

8743.5

... More
Construction of Commercial Complex;Supply of PVC insulated 2 core 2.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990. Complete for finished item of work. Makes:Finolex / RR Kable / Havells

70

-

6447

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of Providing end terminations for the below listed cross section PVC cables including supply of brass glands, solder less crimping type copper sockets, etc., Complete for finished item of work. [for 3.5 C x 120Sq.mm. AluminIum.]

4

-

3749.4

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of Providing end terminations for the below listed cross section PVC cables including supply of brass glands, solder less crimping type copper sockets, etc., Complete for finished item of work. [for 4 C x 16 Sq.mm. Aluminum.]

6

-

1724.76

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of Providing end terminations for the below listed cross section PVC cables including supply of brass glands, solder less crimping type copper sockets, etc., Complete for finished item of work. [for 4 C x 10 Sq.mm. Aluminum.]

4

-

1149.8

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of Providing end terminations for the below listed cross section PVC cables including supply of brass glands, solder less crimping type copper sockets, etc., Complete for finished item of work. [for 10 C x 1.5 Sq.mm. Copper.]

3

-

2035.05

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of Providing end terminations for the below listed cross section PVC cables including supply of brass glands, solder less crimping type copper sockets, etc., Complete for finished item of work. [for 2C x 1.5 Sq.mm. Armored Copper.]

7

-

659.75

... More
Construction of Commercial Complex;Supply,transporatation & installation of following sizes of Hot Dipped Galvanized Iron perforated cable trays without cover, including horizontal and vertical bends, reducers tees,cross members and other accessories as required and duly suspended from the ceiling/Wall with suspenders etc., Complete for finished item of work. (NB:Add 30% Extra for perforated cable tray with cover) [Cable Tray 150mm x 50mm x 1.6mm]

15

-

6101.7

... More
Construction of Commercial Complex;Supply,transporatation & installation of following sizes of Hot Dipped Galvanized Iron perforated cable trays without cover, including horizontal and vertical bends, reducers tees,cross members and other accessories as required and duly suspended from the ceiling/Wall with suspenders etc., Complete for finished item of work. (NB:Add 30% Extra for perforated cable tray with cover) [Cable Tray 300mm x 50mm x 1.6mm]

15

-

11248.5

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of GI Earthing strips run on floor / ceiling / walls from the equipment to the nearest Earth pit with necessary accessories as required( earth pit shall be executed by other agencies) following size of earth strips. Complete for finished item of work. [G.I.Strip 25 x 3mm]

15

-

784.5

... More
Construction of Commercial Complex;Supply, installation, testing & commissioning of GI Earthing strips run on floor / ceiling / walls from the equipment to the nearest Earth pit with necessary accessories as required( earth pit shall be executed by other agencies) following size of earth strips. Complete for finished item of work. [G.I.Strip 50 x 6mm]

15

-

3000

... More
Construction of Commercial Complex;Supply, laying, testing & commissioning of Socketed and spigotted RCC pipes(NP2 class) conforming to IS:458 jointed with cement mortar & laid to correct levels below ground in trenches up to required depth including excavation in all kind of soil dewatering,refilling,watering ramming and removing the surplus excavated material and making good the same complete as required. Complete for finished item of work. [250mm dia RCC pipes (NP2 class)]

10

-

6934.5

... More
Construction of Commercial Complex;Providing floor mounting stand for keeping 4No of fire bucket 1500mm length, 900mm height made out of 40x40x6mm angle iron welded with 4 hooks and duly painted with one coat of red lead and two coats of enamel paint. Complete for finished item of work.

4

-

5499

... More
Construction of Commercial Complex;Designing,. Fabricating & Supply, installing, testing and commissioning of compartmentalized common control panel for Electrical motor pumps 2 No's, Diesel engine driven pump 1 No, Jockey Pump 1 No and Booster pump 1 No as per pump specifications with including required Incomer TPN  MCCB,Al. Bus bars,RYB indicating lamps and with suitable accessories and outgoing Feeder for  main pumps,Star delta starter with over load relay, single phase preventer and indicating lamps with ON / OFF push buttons, Feeder for pumps etc.., to control the above pumps in automatic operation as mentioned above Complete for finished item of work. Star Delta starter with over load relay, single phase preventer and indicating lamps with ON / OFF push buttons. -1 No. Auto manual selector switch DIESEL ENGINE MAIN PUMP a) 20Amps DPMCB   - 2 Nos. b) Battery charger with transformer with rectifier resistance DC ammeter, DC voltmeter, Trickle / booster / off selector switch - 2 Nos. c) 1 set of indicating lamps for the following : 1.  phase indication 2.  battery charger on 3.  over load relay 4. DC supply on 5. control switch on 6. Engine fails to start 7. Pump on 8. Low oil pressure 9. High water temperature 10. Auto manual selector switch d) 1 sets of push button stations for the following : 1. Engine Start 2. Engine Stop 3. Engine - hooter ACK 4. Engine - fault reset e) Selector switches (Engine control, mode selector)-2 Nos. f) Auxiliary relays / contactors / timer for sequence operating for starting and stopping of the engine - 2 set. g) Hooter for audio alarm (Industrial type) - 2 Nos. All the components shall be housed in a common cubical made of 16 swg. M.S. sheet with required stiffeners ( if required). The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height. Also panel shall have sufficient (min. 5Nos per pump set) NO/NC contacts for extending the status of fire pumps to the Fire alarm panel.

1

-

280913.1

... More
Construction of Commercial Complex;Supply, Installation, testing and commissioning of wall mounting 4 loop micro processor based analog addressable fire alarm Control panel expandable by minimum 2 additional loops with minimum 80 character LCD display 4 access levels 1000 events, historical logging, flash E-PROM, 240 volts A C Power supply, automatic battery charger, 24V SLA batteries suitable for operating the entire system including tack back units and the hooters/strobes for a minimum of 4 hours in battery condition the panel shall have suitable power amplifiers for hooter / strobes the panel shall be capable beeing integrated with the BMS system and shall include cost of supply, installation of any additional modules or interfaces required for the same. The panel shall be completed as per the specification and as required fixing of 8 loop Micro processor based Fire Alarm control panel with zonal indictions and battery back up as per detailed specifications. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

1

-

266540.8

... More
Construction of Commercial Complex;Supply, Installation, connecting testing and commissioing of Active and networkable repeater panel with LCD display complete system function keys for programming and control like system reset, alarm acknowledgement, alarm silence, trouble acknowledgement ...etc. as per specification. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

1

-

111711.95

... More
Construction of Commercial Complex;Supply and fixing of addressable wall mounting strobes cum hooters including the cost of mounting accessories complete as per specifications and as required including testing and commissioning. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

20

-

96687

... More
Construction of Commercial Complex;Supply and installation of addressable analogue manual call point with resetable flexible element to initiate alaram including the cost of mounting accessories etc. complete. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

20

-

104526

... More
Construction of Commercial Complex;Supply and instllation of intallegent analogue addressable photo electric smoke detector including cost of base plate etc., complete as per specification with required fittings and accessories. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

32

-

140083.2

... More
Construction of Commercial Complex;Supply and installation of intallegent analogue addressable rate of rise cum fixed temparature heat detectors including the cost of base plate. 75mm dia MS outlet box for fixing of the detector base, mounting accessories etc., complete as per specifications and as required. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

5

-

23518.5

... More
Construction of Commercial Complex;Supply and Installation of Intelligent analogue addressable Control Modules including the cost of mounting accessories complete as per specifications and as required. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

20

-

96687

... More
Construction of Commercial Complex;Supply and Installation of Intelligent analogue addressable monitor modules including the cost of mounting accessories complete as per specifications and as required. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

20

-

96687

... More
Construction of Commercial Complex;Supply and Installation of Intalligent analogue addressable fault isolator modules including the cost of mounting accessories complete as per specifications and complete as required. Complete for finished item of work. Makes: Siemens / Morley / Bosch / Ravel.

6

-

23518.5

... More
Construction of Commercial Complex;Supply and installation of response indicators for above false ceiling detectors. Complete for finished item of work.

32

-

6289.6

... More
Construction of Commercial Complex;Supply of 1.5 Sqmm 2 Core XLPE insulated, 1100V grade armoured copper cable as per specification confirming to IS:7098 (Part - I). Complete for finished item of work. Makes Havells / Polycab / Finolex

1530

-

180846

... More
Construction of Commercial Complex;Supply and fixing of ABC stored pressure squeeze grip type fire extinguishers, 9 kg capacity, IS:15683 : 2006, filled with ABC Mono Ammonium Phosphate base powder- 90 complete with discharge hose and wall mounting bracket, 2mm Mild Steel, EPDM Rubbers, Pressure Guage, which work effectively on all class of fires (A, B, C & Electrical fires) with 5 years warranty Including transportation, all taxes and all labour charges etc Complete for finished item of work. Makes : Safex / Kenex / Bharat / Reliance/NewTech

5

-

33971

... More
Construction of Commercial Complex;Supply and fixing of ISI mark (IS:15683) Mono ammonium phosphate powder 90 (MAP) 6 Kg Fire extinguisher, stored pressure type, pressure gauge, gross wt. 9.4 kg, empty wt.3.4 kg, Discharge time minimum 13 sec, controllable discharge mechanism, range min. 4 mts applicable on classes A,B, C & electrically started fire, A rating -4 A, B rating -34 B, can construction: Deep drawn and Co2 mig welding, Valve construction: Forging & Machining, internal coating of can: Epoxy powder coating, External coating of Can:Epoxy polyster powder coating, sheet metal thickness:1.60mm, Helium leak detection tested with 5 years warranty Including transportation, all taxes and all labour charges etc Complete for finished item of work.

5

-

33971

... More
Construction of Commercial Complex;Supply and fixing of Co2 type Fire Extinguishers 4.5 Kg capacity confirming to IS 2878 made from ISI marked steam less cylinder confirming to IS:7285 & CE certified and fitted with ISI marked controlled valve confirming to IS:3224, high pressure 1 Mtr discharge hose & horn complete with initial gas charged with carrying handle with wheels and wall mounting bracket. Squeeze lever discharge, used un-used indicator, Aphoxy coated paint (Red) with 93% gloss with 2 years warranty Including transportation, all taxes and all labour charges etc complete. Complete for finished item of work. Makes : Safex / Kenex / Bharat / Reliance/NewTech

20

-

175082

... More
Construction of Commercial Complex;Supply and fixing of Escape signage boards in Rigid Photo luminecent based glow in Dark rigid sheet with high intensity luminous properties with specificaiton. Complete for finished item of work. Makes: Cease Fire or its equivalent make Model-1ES01

40

-

62716

... More
Construction of Commercial Complex;Excavation in ordinary soil by Manual Means up to 3m depth with an initial lead of 10 Mts including all operational, incidental, labour charges etc cmplete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS-20B (APSS 308). (for Foundations)

72.16

-

20471.79

... More
Construction of Commercial Complex;Laying PCC work of mix (1:4:8) Prop. using 40mm nominal size hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, excluding seigniorage charges, machine mixing, laying, levelling, tamping, and all labour charges, curing, etc., complete for Bed of Foundations.

11.89

-

60479.53

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, steel centering, shuttering, vibrating etc., complete for finished item of work for FOUNDATIONS, PLINTH, PEDASTAL, (below plinth ) for Footings

0.76

-

8762.31

... More
Construction of Commercial Complex;Supplying and placing of Design mix concrete (M-30 GRADE) corresponding to Is-456 using WEIGH BATCHER 0.50 Cum (6Cum /Hr) at site with 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, including all operational, incidental and labour charges such as weigh batching, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402) with minimum cement content of 400Kgs as per IS code, centering charges such as steel scaffolding pipes, jack props, wallers, foot plates, brackets steel centering plates etc, weigh batching, laying concrete, vibrating, curing etc., complete for finished item of work. (for COLUMNS upto 3.66m height)

0.53

-

8006.71

... More
Construction of Commercial Complex;R.R.Masonary Bin C.M.(1:8) Prop. using hard stone other than granite including cost and conveyance of all materials, labour charges, curing etc., complete for FOUNDATION AND BASEMENT.

48.55

-

200391.34

... More
Construction of Commercial Complex;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs.Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, , scaffolding and curing etc., complete with a compressive strength not lessthan 75 kg/sqcm for walls for Compound wall

62.79

-

500219.67

... More
Construction of Commercial Complex;Plastering with CM (1:5), 12 mm thick in single coat with. Screened sand with sponge finishing including cost and coneyance of all meterials hacking surface, scaffolding, leads, lifts and labour charges etc., complete for Compound wall

635.7

-

122372.25

... More
Construction of Commercial Complex;Painting to new walls with 2 coats of Synthetic Polymer Luxury Plastic Emulsion Paint of Exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter of approved brand and shade over the finished wall putty surface including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for EXTERIOR WALLS.

1295.85

-

795327.94

... More
Construction of Commercial Complex;Suppying and fixing of MS gate of size 5.15m x 1.83m with 50 mm dia MS pipe "C" class alround the gate suitable hold fasts 4 nos., so as to fix in the compound wall, 1 no. of 300mm long MS powder coated aldrop, 2 nos. of powder coated tower bolts 30 mm long and fixing of 4 mm thick MS sheet centntrally fixed with 12 mm square pipes welded vertically and diagnally, painting with 1 coat of redoxide primary coat and 2 coats of synthetic enamel paint including cost and conveyance of all materials, fabrication welding etc., complete as directed by the department.

1

-

56807.5

... More
Construction of Commercial Complex;PAINTING to new Iron work in two coats with synthetic enamel paint of approved colour, over one coat of ( primary coat including cost and conveyance of all materials, incidental charges such as sand paper, cleaning the surface, cost of brushes and putty etc., complete. (Three coats). for compound wall Gate

37.7

-

7773.33

... More
Construction of Commercial Complex;Providing High Yield Strenth Deformed STEEL (HYSD) / Thermo Mechanically Treated (TMT) / Mild Steel (MS) Steel Bars (Fe.500 Grade as per IS1786-1979) of different diameters for RCC Works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars and including all wastages, such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wires , cover blocks and all incidental, Operational labour charges such as cutting, bending, placing in position, tying, including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS.No.126). for Reinforcement of All RCC Works

0.22

-

20007.24

... More
Construction of Commercial Complex;Supply and fixing of 20mm dia 2.0mm thick PVC pipe of heavy grade with IS:9537 part-3 FRLS rigid type concealed in wall and ceiling with all required accessories including chiselling the wall where ever necessary including masonary work for Light/ Fan point and seperate plug point including all labour charges etc, complete.

250

-

28000

... More
Construction of Commercial Complex;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in wall with all required accessories including masonary work and labour charges etc., complete.

250

-

24612.5

... More
Construction of Commercial Complex;Supply and fixing of 32mm dia 2.10mm thick PVC pipe of heavy grade with IS:9537 part-3 FRLS rigid type concealed in roof slab with all required accessories including chiselling the wall where ever necessary including masonary work for Light/ Fan point and seperate plug point including all labour charges etc, complete.

250

-

30975

... More
Construction of Commercial Complex;Wiring with 3 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) for Phase, Neutral and Earth in existing pipe with 6A switch, Ceiling rose and Module box a nd front plate covering to switch control box including all labour charges etc. , complete for light, bell, fan and exhaust fan points in Non-Residential Buildings. (Primary Light Point)

85

-

57770.25

... More
Construction of Commercial Complex;Supply and fixing of 1 no. 6A 3 pin modular socket with 1 no. 6A modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

250

-

93962.5

... More
Construction of Commercial Complex;Supply and run of 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe for run of mains including all labour charges etc., complete.

100

-

6330

... More
Construction of Commercial Complex;Supply and fixing of 1no 16A 3pin/ 6A 3pin plug socket and 1 No. 16 Amps modular switch control (5 in 1) with fuse and indicator lamp (5 in 1) duly recessed in wall the TW deep box covered with hylam shet with No.14 SWG GI wire for earth continuity including wire leads for earth and including cost and conveyance of all materials to site of work and all labour charges etc., complete.

4

-

1839.6

... More
Construction of Commercial Complex;Supply and run of 2 of 36/0.3mm (2.5 sq.mm.) FR PVC insulated flexible copper wire in the existing conduit pipe for mains including all labour charges etc., complete.

250

-

23150

... More
Construction of Commercial Complex;Supply and run of 2 of 56/0.3mm (4.0 sq.mm.) FR PVC insulated flexible copper wire in the existing conduit pipe for mains including all labour charges etc., complete.

250

-

35112.5

... More
Construction of Commercial Complex;Supply and run of 4 of 84/0.3mm (6.0 sq.mm.) FR PVC insulated flexible copper wire in the existing conduit pipe for power points including labour charges etc. complete.

250

-

85250

... More
Construction of Commercial Complex;Supply and fixing of 8 way SPN Distribution board with 1 No. 40A isolator and 6 Nos. 6-32A MCB's as outgoers including all connections etc., including cost and conveyance of all materials, labour charges etc., complete.

6

-

31453.2

... More
Construction of Commercial Complex;Supply and fixing of 4way TPN Distribution board concealed in walls including chiselling masonry work and suitable for single pole out going MCBs in sheet steel enclosure fixed on suitable angle iron frame with 1 No. 40A 4P isolator and 12Nos 6-32A SP MCB's including cost and conveyance of all materials and labour charges etc., complete.

6

-

73200

... More
Construction of Commercial Complex;Providing independent earthing by excavating a pit of size 0.6X0.6X2.1M in all types of soils with 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories duly providing staggered holes including filling with proportionate of Salt and Charcoal in layers giving earth connection from electrode G.I strip of 25mm x6mm x 200mm length with all accessories and hume pipe ring and all labour charges etc., complete

6

-

26495.4

... More
Construction of Commercial Complex;Supply and fixing of 15W heavy duty LED Down lighter, suitable for Recessed / Surface ounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10% with high power LED's having efficacy of > 120 lumins / watt, CCT: 3000K - 5700K, minimum CRI > 70, Luminaire performance complies to IS 10322 (Part 5 / Sec-3) etc., complete for Lift Lobby surface lighiting a) LUMINAIRE MAKE : Pasolite / Cosmo / Polycab / Siger/Koncept/Kiran/Vibrant b) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / EVERLIGHT/ San'an

18

-

27752.4

... More
Construction of Commercial Complex;Supply and fixing of 28W LED COB Down lighter, suitable for Recessed mounting made of pressure diecast alluminium housing with powder coating, with high efficiency reflector operating voltage range of 150 to 265 Volts AC, P.F > 0.9, Surge protection: 2KV, THD<10% with high power LED's having efficacy of > 120 lumins / watt, CCT: 3000K - 5700K, minimum CRI>70, etc., complete for Staircase, Basement floor and Stilt floor lighting Makes : VIN/Surya / Fortune Art / Syska / GreenLites /Gold Medal / Pharox / Stanjo/ Ib LED/ Promtec/ Eveready/ Enrich/ Opple b) LED MAKE : Bridge Lux / LUMILEDS / CREE / NICHIA /Epistar/ Sunpo

40

-

125432

... More
Construction of Commercial Complex;Supply and fixing of 15W LED Slim Panel Lights Round /Square suitable for Recessed / surface mounting made of diecast alluminium body with powder coating, acrylic diffuser with Driver as per IS: 15885 (Part 2/ Sec 13) : 2012 , operating voltaGE-Venture ranGE-Venture of 150 to 265 Volts AC, P.F > 0.9, SurGE-Venture protection: 2KV,THD<10%, with high power LED's having efficacy of > 120 lumins/watt,CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. for Electrical Room, Fire pump room and Toilets. a) LUMINAIRE MAKE : Phillips /Lighting Technologies(LT) / GE-Venture / Crompton / Wipro / Bajaj / Havells /Halonix/Jaquar/HPL b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.

26

-

28536.3

... More
Construction of Commercial Complex;Supply ,installation testing comissioning ofof 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200cubic meter/min but without Regulator. Makes : Crompton / Bajaj Kassels 50 / Usha atom

1

-

2613.15

... More
Construction of Commercial Complex;Supply ,installation testing comissioning of 12' (300mm) Light duty exhaust fan with wire guard Completely nuts and bolts and 23/0060 Twin core wire including all labour charges etc.,complete. Makes: Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orienthill air.

10

-

18951

... More
Construction of Commercial Complex;Supply and fixing of 1x10w Bulkhead fitting with cast Aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., complete with lamp.

12

-

15571.8

... More
Construction of Commercial Complex;Supply,Installation,Testing and Commissioning of Electric Traction Passenger Lift of Makes : As per list of recommended brands. with ? Rated capacity :- 8 Passenger/ 544Kg ? Floors :- G+1 floor (2Stops/2 Landings) ? Travel :- 3 to 4.2 mtrs ? Location of Lift Machine:- MRL (with extra cost for 2nd floor to 4th floor and with additional automatic car door and with full collective control system) ? Rated speed :- 1.0mps VS ? Doors type :- COPO/TOPO Doors with frame having clear opening of 800 mm wide x 2000 mm high made from SS 304 grade sheet of 1.5mm, thick in hairline finish for car and all landing doors with SS door architraves/frames ? Lift car enclosure made from SS 304 grade sheet of 1.5mm, thick with hairline finish with frame made from MS girders, bracing of adequate size with minimum safety factor of 5, with Toe Guard Apron, with necessary false ceiling with adequate LED lights, blower/fan for ventilation & SS chequered plate flooring, handrails, mirror, emergency light etc. COP with SS face plate having metallic push buttons with Braille Code & luminous indicator around button with FPI, scrolling UP/DN LED indicator & with/without attendant key switch, OWD with audio-visual alarm, VAS in Telugu & English with intercom system with telephone instrument in Lift car, LMR & FCC/ ground floor Clear Car size of ......mm wide x ......mm deep x ......mm high ? LOP with SS face plate having recess/ surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille Code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port, control panel duly wired with proper size & strength copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class ? ARD complete with necessary SMF VRLA batteries ? Fireman controller having fireman switch at fire Landing, Lift Machine of Gearless PMSM of suitable kW with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength ? Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc. erected with necessary steel work Minor civil work for alteration if any and erection of door frames and accessories, erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails fixing of girders for mounting lift machine etc. complete as per specification no. LFT. ?Lift shaft available having clear size of ......mm wide x ......mm deep. ......mm Pit depth, ???mm Overhead.

2

-

3604890



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.