Public Works Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure

Opening Date

27 Feb 2024

Closing Date

11 Mar 2024

Tender Amount

₹ 1,18,511 
Notes
Download

Costs

Summary

Wbpwd/ae /hsd_i/nit_ 28 /2023_2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting holes and subsequent mending good damages Diameter exceeding 300 mm. but not exceeding 450 mm. In concrete work (plain or R.C.)

6.75

2592

384

... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof.

2

894

447

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m

0.36

26795

75266

... More
Replacing wooden beam or R.S. joist by R.S. joist or by another wooden beam joist and fixed complete, including hire and labour charges for necessary sal bullah props, necessary packing between beams and burgahs but excluding the cost of joist or wooden beam and concrete/ Brick works etc needed for mending damages.Mode of payment for wooden beam (raplacing the old one) will be made against Item No. 4 of carpanter's work] Height not exceeding 5m Clear span exceeding 6m but not exceeding 7.3m.

2

7310

3655

... More
Brick work with 1st class bricks in cement mortar (1:4) In superstructure, ground floor

2

11430

5715.17

... More
Wood work in beams and burgahs fitted and fixed in position complete. (Cost for repairing of Damage to be paid separately) Sal : Malayasian

0.31

22783

73495

... More
Labour for changing burgahs excluding mending damages.

60

1620

27

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar 20 mm thick plaster

36

6483

180.09

... More
Flush pointing to brick work in cement mortar (1:4) including raking out joints.

26.4

2033

77

... More
Renewing ceiling tile including pointing in cement mortar (1:3) In single layer (Cement 1.7 Kg/ Sq.m)

2.62

886

338

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety

0.14

781

5499

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m Tor steel/Mild Steel

0.01

602

54700.31

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc

11.2

325

29

... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc

18.48

702

38

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On timber or plastered surface : With super gloss (hi-gloss) - Two coats (white in shade)

18.48

1441

78

... More
On steel or other metal surface : With super gloss (hi-gloss) - Two coats (white in shade)

11.2

862

77

... More
Add GST @ 18%

99439

17899

18

... More
Add Labour Welfare Cess @ 1%

117338

1173

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.