Public Works Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Works Department - PWD Tender
Excavation
Eprocure
Opening Date
2 Mar 2019Closing Date
13 Mar 2019Tender Amount
₹ 8,18,794Costs
EMD
₹ 16,376Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_WBPWD_221400_1Bid Award Id
ViewTender No
WBPWD(R)/EE/NHD-I/NIT-64/18-19Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://wbpwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Part - A. Supply of Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 150mm dia.
500
-
217
Part - A. Supply of Eucalyptus-bullah piles at work site, including dressing and making one end pointed. 100mm dia.
200
-
96
Part - A. Supply of 1st class picked Jhama bricks.
5000
-
7.286
Part - B. Maintenance of Non-bituminous Base and Sub-Base or WBM Road
Patching of potholes by draining water, cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse with new materials as per requirement, filling the pothole area with additional volume of Jhama Metal and compacting the same with static roller as per Water Bound Macadam Specification.
100
-
443
Part - B. Carriage of Jhama metal & Silver Sand including loading & unloading from Stackyard to work-site. i) Lead upto 10 km.
200
-
236.25
Part - B. Carriage of Jhama metal & Silver Sand including loading & unloading from Stackyard to work-site. ii) Lead upto 20 km.
200
-
337.25
Part - B. Filling empty Cement bags with dry silver sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
8000
-
3.5
Part - B. Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles 150mm dia.
300
-
105
Part - B. Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles 100mm dia.
50
-
83
Part - B. Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts.
300
-
20.6
Part - B. Coal tarring on wooden surfaces including cost of materials
(a) Double coat.
300
-
36
Part - B. Carriage of Bricks including Loading & Unloading from Stackyard to work-site (i) Lead upto 10 km..
2000
-
0.535
Part - B. Carriage of Bricks including Loading & Unloading from Stackyard to work-site (ii) Lead upto 20 km..
3000
-
0.775
Part - B. Brick pavement with 1st class / picked jhama bricks (as per direction of Engineer in charge) with joints set closed in cement mortar 1:6 including preparation of bed by cutting or filling with ramming the filled up earth to the same profile as that of the finished pavement. Rate is inclusive of cost of supply of all materials, labour and all incidental charges in this connection. (a) When laid with a cushion of sand below including cost thereof: (iii) One brick on edge pavement laid in herring bone bond pattern. Excluding Bricks
93
-
197.56
Sub Total
-
-
-
GST 12%
1
-
86859.37
CESS 1%
1
-
8106.87
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements