West Bengal Transport Corporation Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

West Bengal Transport Corporation Limited - WBTCL Tender

Services
Eprocure

Opening Date

21 Jun 2019

Closing Date

10 Jul 2019

Tender Amount

₹ 15,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cleaning of moss, mud from the surface of the roof/shed at any height as per specific direction of Engineer-in-charge and removing the same beyond the compound and cleaning the site in all respect.

1

-

8

... More
Making scaffolding without staging, including hire charge of bamboo, Ballah etc. and all materials required suitable to undertake the jobs for which scaffolding is being made and when will be directed by the Engineer-in-charge.

-

-

-

... More
a) Upto 3.0 M height

1

-

12.5

... More
b) Above 6.0 m upto 10.0 M

1

-

17

... More
c) Above 10.0 m

1

-

22

... More
Making scaffolding with staging intermediately as will be required, suitable to undertake the job for which the scaffolding with staging is being made including hire charge of bamboo, Ballah and all staging materials etc. planks, G. I. sheets etc. required dismantling of scaffolding as and when will be directed by the Engineer-in-charge.

-

-

-

... More
a) Upto 6.0 M height

1

-

25

... More
b) Above 6.0 m upto 10.0 M

1

-

30

... More
c) Above 10.0 m

1

-

39

... More
Supplying tarpaulin of approved making and fitting, fixing the same for covering the opening the verandah, door, windows etc. as per requirement, design and direction of engineer-in-charge fitted complete in frame work with bolts, hooks etc. including supply of cord pulley block, stiffening the canvas as per requirements and mending good damages.

1

-

101

... More
M. S. works in frame for umbrella made of round or square bars and frame work of M. S. Flat with the bars properly fixed to the flat bar frame work by welding etc. with or without flat bar stiffener and fixed with necessary screws etc. and supplying 1.5 mm thick m. S. sheet fitted and fixed on face of umbrella frame work with point welding at not more than 150mm apart complete in all respect as per decision and drawing and direction of Engineer-in-charge including cost of all labours, materials, tools and plants as required.

1

-

6500

... More
Hire charges of welding sets along with welder and helper as per direction of Engineer-in-charge including cost of all tools and plants require for such welding works but excluding the cost of materials.

1

-

750

... More
Supply of electric for welding works.

1

-

5.5

... More
Supply fitting and fixing 16 mm Fan hook after cutting concrete if required including mending good damages as per direction of engineer-in-charge.

1

-

56

... More
Taking out carefully existing broken glass panes from roof shed sky light opening at any height (including necessary scaffolding)and fixing the same in position as directed, supplying putty and rails as necessary stacking the scrap materials as directed.

1

-

55

... More
Supplying canvas of approved make and fittings, fixing the same for covering the opening and direction of Engineer-in-charge fitted complete in frame work with bolts, hooks etc. including supply of cord, pulley, block. Stitching the canvas as per requirements and mending good damages.

1

-

55

... More
Labour for laying departmentally supplied Tarfelt and cold adhesive on roof (concrete or sheeted slopped etc.) making proper slope as per direction of Engineer-in-charge.

1

-

40

... More
Labour for chilchaling the heap zones by cutting and leveling the existing surface to smooth grade and camber as per direction of Engineer-in-charge and removing the same within a lead of 75 M as directed.

1

-

9

... More
Labour for stone-set pavements with joints set close in cement mortar (4:1) excluding the cost of stone-sets but including the cost of carriage thereof within a lead of 150 M. when lead with 12mm thick. Cement mortar (4:1) on the under bed. (including cost thereof) 125mm / 100mm thick pavement.

1

-

209

... More
Labour for taking out stone-sets (size 280 X 125 X 100 mm) from damaged pavement (in cement mortar) removing mortar from surface of the stone-sets and stacking the stone-sets as directed within a lead of 75 M.

1

-

70

... More
Taking out carefully existing broken glass pens from wooden/ steel window at any height and stacking the scrap properly as directed excluding scaffolding / staging.

1

-

15

... More
Hire charges of gas cutter sets transportation of the same to and fro, including supply of oxyacetylene gas and all tools and plants required for cutting M. S. structural frame etc. and as per direction of Engineer-in-charge.

1

-

750

... More
Supply of Sika Latex.

1

-

275

... More
Supplying, fitting, fixing Aluminium sheet having thickness 0.63 (14 gauge) of approved quality.

1

-

266

... More
Labour for M. S. structural works in roof trusses etc. with departmentally applied simple rolled structural members ( channel, joist, angles, tees, flats, tubes etc.) connected to one another with gusset plate, cleats, riveted, bolted or welded etc. as per design or direction, complete including fabrication, hoisting and erection with supply of nuts, bolts, jointing materials, carriage, tools and plants complete as directed.

1

-

1350

... More
Supply of Iron dust of approved quality.

1

-

42

... More
Making valley / eves gutter by departmentally supplied sheets (G. I. / C. R. upto 20 Kg.) to proper shape to match with existing one.

1

-

55

... More
Renewing by supplying fitting and fixing galvanized Iron sheet valley gutter made of 20 Kg sheet with perimeter 0.91 approx. and with 2.25 mm lap each way including upplying of necessary bolts, nuts etc. complete as directed.

1

-

887

... More
Labour for Roof Shed cleaning.

1

-

12

... More
Labour for chipping of floor.

1

-

16

... More
Applying of monasur (cold adhesive) on roof for crack seating and stopping leakage and sand spreading over it by supplying sand

1

-

15

... More
Labour charges for taking out old damaged tarfelt from G.C.I. sheet roof or R.C.C. roof slab at any height including removal of the same within the 75m. distances from job site

1

-

15

... More
Supplying, Fitting & Fixing 20 mm thick Buggus Board made with bituminous materials.

1

-

45.79

... More
Clearing the Marble Floor applying Acid, cutting with hand grinder machine, sealing the joint properly with white cement, finishing the top surface wing acid/wax complete in all respect as per direction of Engineer-in-charge at site.

1

-

57.94

... More
Covering the office furniture like chair, table, almirah, rack and other utility, office documents etc. with polythene sheet before starting the painting works on ceiling and walls, removing the same after completion of works, cleaning all furnitures dust free as per direction of Engineer-in-charge at site.

1

-

24

... More
Special Note to Tenderer : THE "PERCENTAGE EXCESS" OR "AT PAR" OR "PERCENTAGE LESS" as will be quoted by the tenderer for Part B schedule will be automatically applied for Part A schedule (PC Schedule) also.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.