Purvanchal Vidyut Vitaran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date
9 Mar 2019Closing Date
20 May 2019Tender Amount
Refer DocumentsCosts
EMD
₹ 60,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Increasing Capacity And Separation Of 11 Kv Kuri Feeder Distt- Siddarthanagar Under Eswd, Basti.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PVVNV_335693_1Tender No
37/EWC(B)/2018-19Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
33 ds0oh0 cl vkblksysVj
1
-
-
cl vkblksysVj LVªWDpj
1
-
-
33 ds0oh0 iksLV bUlqysVj
6
-
-
iksLV bUlqysVj LVªWDpj
1
-
-
33 ds0oh0 ykbVfuax vjsLVj
6
-
-
¶;wt lsV
1
-
-
33 ds0oh0 Mcy VªkUlQkeZj dUVªksy iSuy
1
-
-
33 ds0oh0 oh0lh0oh0 LVªWDpj lfgr
1
-
-
33 ds0oh0 lh0Vh0 200@100@1 ,fEi;j
3
-
-
lh0Vh0 LVªWDpj
1
-
-
11 ds0oh0 vkmVxksbax oh0lh0oh0
1
-
-
11 ds0oh0 3x300 mm ² XLPE Cable
50
-
-
11 ds0oh0 3x120 mm ² XLPE Cable
60
-
-
11 ds0oh0 dsfcy TokbafVax fdV (3x300 mm²)
2
-
-
11 ds0oh0 dsfcy TokbafVax fdV (3x120 mm²)
2
-
-
ih0lh0lh0 iksy 8-5 ehVj
48
-
-
,0lh0,l0vkj0 MkWx dUMDVj
0.15
-
-
,0lh0,l0vkj0 ohty dUMDVj
11.9
-
-
,l0Vh0 iksy 11 ehVj
28
-
-
11 ds0oh0 Økl vkeZ ^oh&Vkbi^
68
-
-
11 ds0oh0 iksfyej fiu bUlqysVj
264
-
-
vfFkZax jkWM
72
-
-
,e0,l0 ,afxy ØkWl czsflax DySEi lfgr
4
-
-
11 ds0oh0 ,e0,l0 pSuy VkWi
4
-
-
11 ds0oh0 iksfyej fMLd bUlqysVj
68
-
-
11 ds0oh0 fMLd fQfVax
68
-
-
LVs dEiyhV
32
-
-
LVs ok;j 7/10 SWG
160
-
-
xkfMZax ,afxy 75x40x3010 mm
26
-
-
th0vkÃ0 ok;j xkfMZax gsrq
390
-
-
,e0,l0Vh0vkQ pSuy
17
-
-
jcj eSV
2
-
-
,0ch0lh0 dsfcy (3x120+1x95+1x16 mm²)
0.55
-
-
fMfLVªO;wlu ckSDl
6
-
-
dkij d.Vªksy dsfcy 2x2.5mm²
150
-
-
dkij d.Vªksy dsfcy 4x2.5mm²
150
-
-
cSVjh ,oa cSVjh pktZj
1
-
-
,Q&czSdsV^
44
-
-
MsUtj cksMZ DySEi lfgr
72
-
-
dzkl vkeZ gksfYMax DySEi uV
68
-
-
LVs DySEi
74
-
-
^bZ&czSdsV^
12
-
-
ih0th0 DySEi
36
-
-
gksfYMax DySEi Vki pSuy gsrq
8
-
-
gksfYMax DySEi xkfMZax ,afxy gsrq
26
-
-
uV ,oa cksYV
13
-
-
Vh0 vkQ0 pSUky DySEi
17
-
-
,yqeqfu;e yx 300 ,fEi;j
12
-
-
ckjcsM ok;j
76
-
-
pSuy&czSdsV^ (125x65x300 mm) ¼uV&cksYV] DySEi lfgr½ Vki fiu ,l0Vh0 iksy gsrq
24
-
-
uEcj IysV DySEi lfgr
26
-
-
fMLVªhO;w'ku ckDl DySEi
12
-
-
,y0Vh0 DySEi
3
-
-
lLisU'ku DYkSEi
9
-
-
MsM ,aM DySEIk
2
-
-
PART-B-WORK
-
-
-
Shifting, loading, carriage & Erection of Single pole structure on 8.5 mtr. PCC Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, 'F' bracket, composite polymar pin, insulator, danger board with clamp, earthing, Pole no. painting, barbed wire etc. complete) The work includes carriage & handling of all materials from site store to pit site.
44
-
-
Shifting, loading, carriage & Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast) back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, composite polymer pin, insulator, danger board with clamp, no. plate,earthing, barbed wire, painting of pole with painr, making of plinth around ST Pole etc. complete)
24
-
-
Shifting, loading, carriage & Erection of Double Pole structure on 8.5 mtr. PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
2
-
-
Shifting, loadin, carriage & Erection of Double Pole structure on 11 mtr. ST Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth , proper ramming, making of plinth & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc insulator T & C type, disc fitting T & C type, composite polymer pin, insulator, P.G. Clamp, 'E' bracket, danger board with clamp,pole no. painting, barbed wire earthing, grouting of Stay Rod including all work as per norms etc. complete).
2
-
-
Grouting of extra Stay Rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
8
-
-
Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
13
-
-
Chopping of branches of trees of Eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place.
105
-
-
Shifting, loading, carriage & Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
3.85
-
-
Shifting & loading of following materials on private truck at store center -
-
-
-
11 kv 3x120 mm² xlpe cable
60
-
-
11 KV XLPE Cable 3x300 mm²
50
-
-
Lightening Arrestor with structure
1
-
-
Bus Isolator 33 KV with structure
1
-
-
Post Insulator 33 KV with structure
1
-
-
Fuse Set with structure
1
-
-
Other small materials
1
-
-
Laying of 11 KV "XLPE" cable including Covering of cable with sand & brick arround and Top of the cable.
40
-
-
Laying of 11 KV XLPE cable air after providing 4" dia M.S. Pipe 3 Mtrs long after mounting of 11 KV cable boxes at double pole of Cable.
1
-
-
Shifting, loading & carriage of 11 KV Switchgear to control room & placing in control room with grouting of bolts & mounting of switchgear pannels properly.
1
-
-
Electrical connection of 11 KV Switchgear pannel & fitting of Bus Bar, Battery & battery Charger & P.T
1
-
-
Testing of 11 KV Switchgear pannel in all respect.
1
-
-
Extra work for separation of Circuit i.e. Shiffiting the Existing Line from Vertical to Horizontal (By opening the winding from insulator and re-sagging the conductor from Vertical to Horizontal
2
-
-
Dismentaling of existing pale fencing & resetting after completion of work.
1
-
-
Dismentalling of HT Jumpers, 11 KV C/J Kit and diferent earthing of existing 5 MVA T/F, drain out of T/F oil, closing of valves & pinning of radiators & shifting of 5 MVA T/f from plinth about 40 Mtr. & resetting of accessories etc. complet work.
1
-
-
Dismentaling of existing old structure & resetting as required complete work.
2
-
-
Laying of 11 KV XLPE Cable 3x300 mm² including covering of cable with sand etc. complete work.
35
-
-
Shifting of 10 MVA T/F about 35 Mtr. distance and placing at T/F Plinth errection of conservator tank radiators and filling of T/F oil and jumpering etc. complete work.
1
-
-
Earthing of 10 MVA T/F complete including cost of GI Pipe 1.5'' dia 30 Mtr. long & other earthing materials.
1
-
-
Jointing charges of 11 KV XLPE C/J kit 3x300&3x120 mm² indoor, outdoor
4
-
-
Erection & Grouting of VCB & CT Structure mounting & fitting of VCB & CT on erected structure with complete fitting earthing of structure, installation of battery & Battery charger in control room.
1
-
-
Grouting, fitting & Mounting
-
-
-
Lightening Arrestor with structure
1
-
-
Bus Isolator 33 KV with structure
1
-
-
Post Insulator 33 KV with structure
1
-
-
Fuse Set with structure
1
-
-
Laying of copper control cable(2x2.5 &4x2.5 mm²) for making connection of VCB, CT & Control Pannel
300
-
-
Painting of existing pale fencing in switchyard.
1
-
-
Reparing of Isolator TPMO & other equipement
1
-
-
Earthing of Indoor Equipment
1
-
-
T/F Body Earthing at 2 places including cost og GI Strip, GI Pipe & other earthing material required.
1
-
-
Grouting of MS Channel Top (02 Nos.) for cable stand and welding of MS Flat (3 Nos.) at equal distance for fasting cable by clamp with N & B, mounting of cable at cabl stand and connection of jumper's
1
-
-
Neutral Earthing of 10 MVA T/F complete including cost of GI Strip, GI Pipe 1.5'' dia 30 Mtr. long & other material's.
1
-
-
Grouting of nutral earthing, stand of 10 MVA T/f with help of GI strip 50x6 mm & copper flexible bond etc.
1
-
-
Painting of all structures of S/S
1
-
-
Labour Charge for disconection & reconnection of L & F Connection
40
-
-
Open of Conductor from the line & collecting one place
11
-
-
Shifting, loading, carriage & Laying of ABC Cable (3x120 + 1x95 +1x16) mm² with fixing of distribution box,clamps etc. complete work.
0.55
-
-
Loading & unloading with cartage of old conductor from work site to store center, Siddharth Nagar.
1
-
-