Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date
18 Feb 2019Closing Date
26 Feb 2019Tender Amount
₹ 99,00,000Costs
EMD
₹ 6,95,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CEUVZ_311202_8Bid Award Id
ViewTender No
713/183Com-Varanasi Circle/18 Date 05-02-2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and applying tack coat with bitumen using pressure distributor at the rate of 0.3 kg per sqm on the prepared non bituminous surface cleaned with hydrolic broom as per MORD specificationl 503. (Excluding GST)
7500
71250
9.5
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm & 11.2 mm dalla grit in proportion of 2:1 either using viscosity grade bitumen @ 1.46 kg per sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN static roller capacity, finished to required level As per Technical Specification clause.508 (Excluding GST)
7500
952500
127
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels , grade and cross fall using Type'C' as per Technical Specification Clause 510 (Excluding GST)
7500
315000
42
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and lead. Transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1 (Excluding GST)
2030.4
182736
90
Excavation in foundation in soil mixed with moorum/shingle/black cotton/kankar soil in lift 1.50 m and lead upto 30 m.and filling watering and ramming of excavated earth into space between the structure and the side of foundation requiring the use of special T&P such as pickaxe, subbals etc si.no 252 (Excluding GST)
476.9
46736
98
Cement concrete with 4 cm guage approved stone ballast approved coarse sand and cement in the proportion 8:4:1 including cost of all material, labour and T&P etc required for proper completion of work. SOR No 281(Excluding GST)
63.4
247196
3899
Providing and laying 350 mm dia N.P.-3 Hume Pipe Medium duty conform to IS 458 : 2003 including collars/Spigot Jointed with stiff mixture of cement in the proportion of 1:2 (1 Cement : 2 Fine Sand) including Testing of Joints, all transportation charges etc. complete. (Excluding GST)
30
46080
1536
Filling of earth on the side of trenches and on the patri and diversion during construction of H.P. culvert etc. required for proper completion of the work. (Excluding GST)
70
6300
90
Stone masonary wrok in cement mortar in foundation complete as per drawing & techinical specification clause 702,704,1202 & 1203 (1:4 Cement Sand Ratio) (Excluding GST)
430.6
1700870
3950
Struck pointing 1:2 cement and fine sand mortar on both visible face of end wall in parapet as per SOR 574 (Excluding GST)
279.7
44752
160
Providing and laying 600 mm dia N.P.-3 Hume Pipe Medium duty conform to IS 458 : 2003 including collars/Spigot Jointed with stiff mixture of cement in the proportion of 1:2 (1 Cement : 2 Fine Sand) including Testing of Joints, all transportation charges etc. complete (Excluding GST)
15
43200
2880
Providing and laying 900 mm dia N.P.-3 Hume Pipe Medium duty conform to IS 458 : 2003 including collars/Spigot Jointed with stiff mixture of cement in the proportion of 1:2 (1 Cement : 2 Fine Sand) including Testing of Joints, all transportation charges etc. complete (Excluding GST)
7.5
31680
4224
Providing Cement concrete Grade M-25 for reinforcement concrete in open foundation complete as per drawing and Technical specification clause 802, 803, 1202 & 1203 (Excluding GST)
19.2
119808
6240
Mild steel in plain work such as reinforced cement concrete (when not included in over all rates ) wrought to required shape as necessary including bending , and also including supply of steel and wastages and overlapping and hookes required for completion of the work. S.I. No. 504 (Excluding GST)
18.8
82720
4400
Cement Concrete grade M-15 with approved coarse sand and 2 cm. Gauge approved stone ballast in flooring and also including s/o all materials required for proper completion of the work. t. (Excluding GST)
5.4
27108
5020
Dewatering in foundation of culvet including hire charges of of diesel pump in cluding cost of all material , labour T&P etc complete. (Excluding GST).
48
5280
110
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (Excluding GST)
6.8
12580
1850