Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date
4 Nov 2019Closing Date
30 Nov 2019Tender Amount
₹ 4,95,73,742Costs
EMD
₹ 11,50,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CEUFZ_399400_2Bid Award Id
ViewTender No
3238 / 1com. su.a cir /2019-20 Date 31.10.2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing, laying, spreading of graded stone aggregate (wet mix macadam) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.5% emulsion in uniform single layers on sub- base / Sub grade and compacting with road roller to achieve the desired density..
1948
-
-
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. As per MORT&H specification clause 503.
19480
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
584.4
-
-
Construction of Divider in Abadi Portion Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
10.72
-
-
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
496.91
-
-
Painting twoCoat after the surface with Primer synthatic enamal paint and Technical Specification. As per direction of E/I,As Per S.I.N0=(644+643)
3216
-
-
Supplying and fixing PVC pipe for elecrical cable as per drawing and Technical Specification. As per direction of E/I,
2685.41
-
-
Extention of Hume Pipe Culverts.(3 Nos) Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
82.4
-
-
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5.7
-
-
Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per Spe.
18.82
-
-
Struck pointing 1:2 in cement and fine sand mortar as per Spe.
18.08
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per Spe.
5.5
-
-
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.
10
-
-
Nodal /Junction Point Grade correction of emerging/branching Roads. Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
116.87
-
-
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. As per MORT&H specification clause 503.
2337.5
-
-
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
35.07
-
-
Construction of sub-grade and earthen shoulders(Patries) with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
-
-
-
Removal of unserviceable soil i/c and lead upto 1000m excation ,loading and disposal 1000 Mtr lead but excluding replacement by suitable soil which shall be paid separately as per Clause 305.
7529
-
-
Dismentling brick work or stone work in lime or cement mortar and i/c stacking of materials as per direction of Engineer in Charge with in distance of 60 mtr.as per SOR SI No-692
176.45
-
-
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
17.9
-
-
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
12
-
-
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification
953
-
-
D.P.C 25 mm thick work above plinth and top of Boundry wall i/c cost of all material t&P etc as per direction of E/I as per SI N0-600
105.59
-
-
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per Spe.
215.32
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per Spe.
1156.95
-
-
One Prime coat and two coat of dry Distamper on new work i/c supply of all materials T&P etc. as per SOR SI No-(681+682)
1164.54
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements