Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Eprocure
Opening Date
7 Feb 2019Closing Date
21 Feb 2019Tender Amount
₹ 24,10,00,000Costs
EMD
₹ 48,20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_CEBLY_291538_1Bid Award Id
ViewTender No
12193 /431C (E-Tender)-3/18-19 DATE 10.12.18Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Granular Sub-Base with coarse Graded material (Table 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401
17353
-
-
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared under base and compacting with power vibratory-roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc.
4794
-
-
Providing, laying, spreading and compacting graded stone aggregate to cement stabilized wet mix macadam specifications including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site laying with 1% OPC cement and 3.5% Emulsion in uniform layers with paver in sub-base/base course on a well prepared surface and compacting with vibratory-roller to achieve the desired density.
4583
-
-
Providing and laying dense graded bituminous macadam with 60-90 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 4.5 percent by weight of total mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specifications clause 507 complete in all respects.
6650
-
-
Providing and laying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 Kg. Per sqm on the prepared bitumenous surface cleaned with mechanical broom.
266000
-
-
Providing and laying bituminous concrete with 60-90 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydristatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specifications clause 509 complete in all respects.
3990
-
-
Construction of Patries/Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3987
-
-
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (upto 1 Km carted Earth)
272
-
-
Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed , placed in foundation and compacted , curing etc.as per MORT&H Specification 408
279
-
-
Brick masonry work in 1:3 cement, coarse sand mortor in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per MORT&H specification clause 1300 & 2200 SI 13.1
1350
-
-
Supply of Laying and fixing of NP3 class 1000 mm dia hume pipe in proper position in culvert.
90
-
-
Pointing with cement coarse sand mortar (1:3 ) on brick work in substructure as per Technical Specifications .as per MORT&H specification clause 1300 & 2200 SI 13.2
855
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per MORT&H specification clause 1300 & 2200 SI 13.3
21
-
-
Providing plain / Reinforced cement concrete of grade M-25 in foundation/super structure ( Bed block,slab and wearing coatcomplete as per drawing and technical specifications 800, 1205.4 and 1205.5 (M-25)
131
-
-
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications As per MORT&H Specification 14.2 (1600)
8.9
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements