Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies - DOLBU Tender

Works
Civil And Construction
Eprocure

Opening Date

17 Jun 2019

Closing Date

5 Jul 2019

Tender Amount

₹ 28,40,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (as per S.I. No. 273)

39.3

137550

3500

... More
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. {(as per Add item (a)}

53.6

192960

3600

... More
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. (as per S.I. No. 283)

82.2

534300

6500

... More
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. (as per S.I. No. 504)

64.5

361200

5600

... More
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. (as per S.I. No. 303)

92

506000

5500

... More
12mm thick plaster on brick work minimum thickness not less than 10mm with cement and fine sand of fineness modulus mortar in 1:4. (as per S.I. No. 584)

888

119880

135

... More
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. (as per S.I. No. 279)

12

64800

5400

... More
One priming coat and two coat oil distemper on new weork including supply of all materials, labour and T&P etc. required for proper completion.of work. (as per S.I. No. 649)

917.6

45880

50

... More
Providng and laying of 8 to 10mm thick ivory or light shade vitrified tiles of 600mm x 600mm size in flooring or skirting laid with 1 : 3 cement mortar (1 cement , 3 coarse sand) finishing with cement sturry & with pigment grouting & Polishing complete I/C S/O all material labour T & P etc. required for proper completion of work excluding base contrete. (as per Chp-14- Add New Item)

204

285600

1400

... More
Supplying and fixing of rolling shutters of approved make of 80x1.25 mm (3"x3½" gauge) cold rolled MS: laths inter locked throughout their entire length and joined together at the end locks and mounted on specially designed pipe shaft with brackets side guides and arrangements for inside and outside locking with push and pull operation complete but excluding the cost of top cover and springs. (as per S.I. No. 520)

37.8

58060

1536

... More
Providing and fixing 27.5 mm long wire springs grade 2 for rolling shutters. (as per S.I. No. 521)

20

13440

672

... More
Providing and fixing top cover for rolling shutters. (as per S.I. No. 522)

21

10080

480

... More
Providing and fixing ball bearing for rolling shutters. (as per S.I. No. 523)

20

8640

432

... More
Painting or Venishing new iron work in small areas or new wood work with one coat (up to one Sq. meter) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950. (as per S.I. No. 641)

37.8

2268

60

... More
Earth work in filling with Material Obtained from Borrow Pits (Carted earth) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical specification clause 301.5

96

12480

130

... More
Supplying and fixing of electrification work including all material, labour, T&P etc. required for proper completion of the work.

10

40000

4000

... More
Add Labour cess @ 1%

1

28120

28120

... More
Add GST @ 12%

1

301200

301200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.