Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date
5 Mar 2019Closing Date
11 Mar 2019Tender Amount
₹ 5,00,000Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
T-168
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_DVVNL_305423_2Tender No
T-168/EDC/FTender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Conductor, GI earthwire, cross arm, angle, channel, insulator other line material.
80
-
-
11 KV Cubical Box 15/5 Amp.
1
-
-
16 KVA transformer
8
-
-
25 KVA transformer
8
-
-
63 KVA transformer
6
-
-
100 KVA transformer
6
-
-
11 KV XLPE cable 3x70 mm / 3 x 120 mm/3x185/3x300 mm
600
-
-
Drilling of hole in channel, angle.
480
-
-
Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint.
30
-
-
Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road.
40
-
-
Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.
5
-
-
Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast.
40
-
-
Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall not be grouted in cement, sand, and brick ballast.
10
-
-
Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings
6
-
-
Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings.
2
-
-
Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening.
10
-
-
Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm,
20
-
-
Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms.
60
-
-
Chopping of tree branches for clearance of line
20
-
-
Installation of Extra “T” as per RESPO manual
20
-
-
Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work.
-
-
-
16 KVA transformer
8
-
-
25 KVA transformer
8
-
-
63 KVA transformer
6
-
-
100 KVA transformer
6
-
-
Digging, laying and back filling 3x70 / 3x120 / 3x185/ 3x300 mm XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.
250
-
-
Installation material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.
-
-
-
11 KV cross arm holding clamp with nut & bolt
50
-
-
11 KV U clamp with nut & bolt
40
-
-
11 KV F clamp with nut & bolt
30
-
-
Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer.
250
-
-
Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms.
5000
-
-
Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm
500
-
-
Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms.
500
-
-
Guarding of 11 KV line.
500
-
-
Installation of Distribution box as per RESPO manual and as per direction of supervising engineer.
5
-
-
Fixing of TPMO fuse set on newly erected transformers.
5
-
-
Installation of 11 KV Cubical Box 15/5 Amp.
1
-
-
Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement.
5
-
-