Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date
30 Jun 2024Closing Soon
6 Jul 2024Tender Amount
₹ 5,96,000Costs
EMD
₹ 6,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_934168_1Tender No
EDCA-02/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Cartage of line material viz Cable, Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
10
-
-
Erection of single support pole including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
PCC/ST poles 8.5/11 Mtr.
4
-
-
Erection of 11 KV Section/Fix line/Bay double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
-
-
-
PCC/ST poles 8.5/11 Mtr.
3
-
-
(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
20
-
-
(b) Providing and fixing of stay insulator.
20
-
-
Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
-
-
-
ACSR Weasal Conductor.
247
-
-
ACSR Dog Conductor.
60
-
-
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel, Stone pad. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
12
-
-
Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms
10
-
-
Making the plinth of ST Poles.
4
-
-
Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
-
-
-
400 KVA T/F
1
-
-
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
12
-
-
Fixing of following accessories:-
-
-
-
11 KV Pin Insulator
15
-
-
11 KV Disc Insulator
15
-
-
11 KV V-type cross arm
4
-
-
F-Bracket.
4
-
-
Providing & Fixing of Clamps of LT, Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
40
-
-
Filling of 3x70 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
10
-
-
Safe carriage of 3x70 Sq.mm.11 KV XLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work.
290
-
-
Laying of 3x70 Sq.mm. 11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
290
-
-
Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km.
1
-
-
Erection & grouting of 11 KV pilfer proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs.
1
-
-
Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
1
-
-
Fixing of 11 KV Fuse set as per RESPO norms.
2
-
-
Safe Cartage of 11 KV VCB from Store Center, Sarsol to respective site.
1
-
-
Errection and Instalation of 11 KV VCB including all labour out going incoming connection with bus bar 11 KV cable boxes tapping with empire tape & H.T. tape and connecting with earthing at respective site.
1
-
-
Earthing of 11 KV VCB providing & laying M.S. earth strip 50x6 mm including welding bending etc. at respective site.
1
-
-
Wearing GI pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply.
8
-
-
Fixing of danger board with clamp N&B as per RESPO norms.
7
-
-
Body and neutral earthing of 400 KVA distribution Transformers installed by digging of pit up to water level depth (approx. 100’) and then inserting 1-1/4" dia G.I. pipe of "B" grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer including the cost of arrangement of all material, labourer, T&P, carrier etc. required for proper completion of work.
2
-
-
Construction of 400 KVA Transformer of Plinth of size 5’x5x4’ above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly after that a retaining wall of 9” width by first class brick in ratio 1:4 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. jall of 12 mm M.S. tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the Plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer. It including the cost of all material, labour T&P, carrier etc. required for proper completion of work.
1
-
-
FABRICATION & ERECTION OF FENCING AND CONSTRUCTION OF RETAINING WALL AROUND 400 KVAT/F.
The complete 11/0.4 KV Substation shall be provided with two meter height fencing and retaining wall around the substation. One No. Gate with proper locking arrangement for entry of personnel shall also be provided. The fencing shall be made of 50x25 mm x10 SWG rectangular welded mesh of wire mesh in length. Wire mesh shall be fixed on panels made of 50x50x6 mm M.S. Angle. The wire mesh on panels will be supported by 25x3 mm M.S. flat on all the bracings diagonally and 50x6 M.S. Flat horizontally at the center of the panel. The panel will be joined by bolts & nuts of appropriate size with each other and on the main support on corners including supply of all material, labour, carrier and T & P etc. required for proper completion of work. The painting of complete fencing shall also be done with one coat of red oxide primer and two coat of synthetic green paint. For construction of retaining wall around the fencing, excavation of earth shall be done in foundation in ordinary soil including disposal of surplus earth at some suitable distance. The dimension of excavation shall be 1m wide, 0.45 m deep and suitable length as per wire mesh. After excavation of earth a cement concreted pad shall be laid in foundation. Concreting shall be done with Ist class brick ballast, coarse sand and cement in proportion of 8:4:1. First class brickwork shall also be done in foundation and super structure in 1:6 Cement and coarse sand including necessary cutting and moulding of bricks in foundation depth of wall 0.30 m, thickness of wall 0.35 m & superstructure brick work thickness of wall 0.23 m & depths 0.30 m including supply of all material, labour, carrier and T & P etc. required for proper completion of work.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%