Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
225068Bid Award Id
ViewTender No
S.O.No. 917/DUB/2020-21Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Development and maintenance of park;Maintenance of individual shrubs planting: watering once in a day 5 ltrs /plant/day trimming once in 15 days with manual watering including applications of fertilizers
230
-
1707.75
Development and maintenance of park;Maintenance of hedge / Shrub planting i) Trimming of hedge / shrub once in 15 days ii) Watering of hedge / shrub once in a day @ 5 liters / per plant / per day ( sub soil moisture shall be maintained continuously) iii) Formation of basins 1 ft away from the Hedge iv) Application of fertilizers, insecticides, fungicides etc.,
105
-
6462.4
Development and maintenance of park;Maintenance of Lawn i) Watering of lawns @10-15 litres / Sqm /day basing on the season and weather conditions (sub soil mositure shall be allowed) ii) Lawn moving and edging of the lawns in the following frequency, keeping the Lawn grasss blade not more than 2 cm. a) June to November - once in 15 days b) December to May - once in 30 days
173.16
-
2400.28
Development and maintenance of park;Procurement of Dust bins
3
-
16500
Development and maintenance of park;Procurement of seating benches
6
-
45000
Development and maintenance of park;Kerb stone: Supply and fixing of Cost CC stone M.90 of 600 mm X 370 mm X 110mm 1:2:4 prop (538.45 rmt @ 442.7 per 1.5 rmt)
229
-
101378.3
Development and maintenance of park;Individual Planting : Digging the pits of size 0.45mx0.45mx0.45m, refilliing the pit with red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides @ 20 gms/pit/Sqmt) etc., complete but excluding the cost of fertilizers and plant material
230
-
44636.1
Development and maintenance of park;Hedge/shrub planting: Digging the trenche of size 45 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transport of plants & planting the plants including the applicatuion of fertilises and pesticides etc., (20gms/pit/sqmt) complete but excluding the cost of the fertilizers @ 20gms/pit/sqmt) and plant material.
105
-
100068.15
Development and maintenance of park;Cost of carpet grass (Approved Rates )
1863.2
-
24165.72
Development and maintenance of park;Laying and ramming of carpet grass
173.16
-
10060.6
Development and maintenance of park;Lawn grass Bed Preparation: Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (4" thickness after roling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
173.16
-
57792.15
Development and maintenance of park;Supply & stacking of gravel at site to the department gauge for pre mesaurements and it shall be composed of well graded coarse siliceous grains sharp & gritty to touch and free from dirt & other deletrious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 micron IS sieve and should have liquid limit and plasticity index not more than 6 as per standard specification no 138 of APSS. the cost including of transportation, loading, unloading, stacking at the site including all labour charges, taxes & seiniorage charges etc., complete
278.16
-
56800.27
Development and maintenance of park;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 Km. complete
109.49
-
15000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements