Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Agriculture or Forestry Works

Opening Date

3 Feb 2024

Closing Date

9 Feb 2024

Tender Amount

₹ 74,64,700 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
item;Maintenance of Lawns From December-2023 to March-2024(Months)

-

-

-

... More
item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 200x5x15/25000=0.60 Daysx4 Months=2.40

2.4

3352

8045.52

... More
item;Maintenance of Individual plants and shrubs trimming once in 15 days and watering once in a day @ 5 ltrs per plant with manual watering

200

444

3553.12

... More
item;Maintenance From December-2023 to March-2024(4Months)

-

-

-

... More
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(8"x12")Bags Total lead 25Km =22km x10.58=232.76+542.19

100

774

774.95

... More
item;Cost of Shub Plants

100

50

5000

... More
item;Shrub planting: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

200

194

38814

... More
item;Engaging of JCB for Clening and leveling of sites including the fuel charges and driver batta etc complete 3days X 8 Hours = 24 Hours

24

850

20400

... More
item;Individual Shrub Plantation

-

-

-

... More
item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 1700x5x28/25000=9.52 Daysx4Months=38.08

38.08

3352

127655.58

... More
item;Maintenance of hedge planting trimming once in 15 days watering once in a day @ 5ltrs per plant with manual watering

1700

2930

199293.72

... More
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(6"x12")Bags Total lead 25Km =22km x3.02=66.44+338.83

17000

405

68895.9

... More
item;Cost of Hedge Plants

17000

35

595000

... More
item;Hedge planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material

1700

756

1286033

... More
item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete =1000 Sqmt X 0.45x2 = 900 Cum

900

174

157320

... More
item;Hedge Plantation along the Walking Track (1000 RMT @ 45 cm width Both sides = 450 Sq.Mtrs

-

-

-

... More
item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.From December-2023 to March-2024 (4 months)

200

360

2887.52

... More
item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering (16 Waterings) From December-2023 to March-2024 =200x20x16/25000=2.56

2.56

3352

8581.89

... More
item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant

200

482

965.64

... More
item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant

200

160

321.89

... More
item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)

20

2261

452.2

... More
item;Application of fertilizers (2 doses)

200

293

587.86

... More
item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)

200

-

200

... More
item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")

200

28

5600

... More
item;Planting of bag plants after refilling the pits/support sticks10"x16" bags

200

2139

4278.4

... More
item;Internal transport of bag plants to planting site 10X16 bags

200

608

1216.88

... More
item;10"x16"Bags(10.58x22+735.93)

100

968

968.69

... More
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 53Km

-

-

-

... More
item;Cost of Avnue Plants

100

250

25000

... More
item;Application of Folidol dust (10%) @20gms/pit/dose

200

57

114.21

... More
item;Application of Red soil and FYM including internal distribution 75cmt cube pit

200

1233

2467.75

... More
item;Cost of Folidol dust (10%) @20grms/pit

200

-

100

... More
item;Cost and conveyance of well decomposed FYM (0.60 mt pits)

200

2558

5117.46

... More
item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60X0.60X0.60=0.216x200=43.208 cum x 20%=8.64 cum

8.64

1228

10614.24

... More
item;Digging of pits of size0.60x0.60x0.60 mts

200

6761

13522.43

... More
item;Alignment and Stacking including cost of stacks(45%)

90

97

87.38

... More
item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)

400

65

263.03

... More
item;Avenue Plantation

-

-

-

... More
item;Supply and fixing of Granite stone benches of minimum length of 5 feet with flammed finish of approved design and colour including the cost of earth work excavation laying of PCC 1:2:4 in required dimensions fixing chagre labour charges making charges incidental and operation charges contractor profit etc complete for finished item of work and as directed by the engineer

10

11000

110000

... More
item;Signboards

-

-

150000

... More
item;Cost of sculptures (3 Nos)

1

-

500000

... More
item;Internal Transportation spereading of gravel

600

71

43164

... More
item;Lawn Mounds, Gravel filling

600

204

122520

... More
item;Laying of shabad stone flooring with ran door white 50.80 mm thickness over a base of mud motor of 30mm thickness and pointing of full depth stores with red soil and carpet grass including cost and conveyance of all material and labour chagres 2 feetx2 feet x 150 Rmt= 600

600

4299

257961

... More
item;Laying of carpet grass and ramming

2500

58

145250

... More
item;Cost of carpet grass

2500

135

337500

... More
item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass ( 4? thickness after rolling )

2500

333

834375

... More
item;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide 50 mm thicj ibn PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid using concrete batching and mixing plant including contracotrs profit and overhead charges but excluding seinorage charges all complete as per clause 408 MORTH, complete for finished item of work and as directed by the Engineer-in-charge (Morth 408 8.2 B)

1470

575

846249.6

... More
item;Internal Transportation & application of gravel including spreading

1470

99

146176.8

... More
item;Supply & stacking of gravel at site to the department guage for permeasurements and it shall be composed for wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleteriious matter the cost including of transportation, loading, unloading charges taxes & seiniorage charges etc complete = 735 Sqm x2 M Height =1470 Cum

1470

204

300174

... More
item;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 kms

1850

137

253450

... More
item;ESTIMATE FOR DEVELOPEMNT OF LANDSCAPING WORK AT SHAMBUNIKUNTA LAKE, AMEENPUR DURING THE YEAR 2023-24

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.