Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Jul 2024
Closing Date13 Aug 2024
Tender Amount₹ 1,88,65,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
KM 0/000 - 3/465

4307.5

-

-

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
KM 0/000 - 1/000

51.82

-

-

... More
KM 1/000 - 2/000

52.92

-

-

... More
KM 2/000 - 3/000

54.92

-

-

... More
KM 3/000 - 3/465

30.16

-

-

... More
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

-

-

-

... More
KM 0/000 - 1/000

51.82

-

-

... More
KM 1/000 - 2/000

52.92

-

-

... More
KM 2/000 - 3/000

54.92

-

-

... More
KM 3/000 - 3/465

30.16

-

-

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth)

-

-

-

... More
KM 0/000 - 1/000

326.57

-

-

... More
KM 1/000 - 2/000

317.26

-

-

... More
KM 2/000 - 3/000

372.97

-

-

... More
KM 3/000 - 3/465

268.21

-

-

... More
Gravel Shoulder Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
KM 0/000 - 1/000

558.34

-

-

... More
KM 1/000 - 2/000

559.24

-

-

... More
KM 2/000 - 3/000

560.87

-

-

... More
KM 3/000 - 3/465

259.93

-

-

... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density

-

-

-

... More
KM 0/000 - 1/000

575.21

-

-

... More
KM 1/000 - 2/000

559.24

-

-

... More
KM 2/000 - 3/000

565.24

-

-

... More
KM 3/000 - 3/465

288.46

-

-

... More
PRIMER COAT Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
KM 0/000 - 1/000

3834.75

-

-

... More
KM 1/000 - 2/000

3728.25

-

-

... More
KM 2/000 - 3/000

3768.29

-

-

... More
KM 3/000 - 3/465

1923.08

-

-

... More
TACK COAT Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503

-

-

-

... More
KM 0/000 - 1/000

3862.5

-

-

... More
KM 1/000 - 2/000

3750

-

-

... More
KM 2/000 - 3/000

3779.16

-

-

... More
KM 3/000 - 3/465

1933.95

-

-

... More
Mix Seal Surface 25mm thick using Waste Plastic Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
KM 0/000 - 1/000

3862.5

-

-

... More
KM 1/000 - 2/000

3750

-

-

... More
KM 2/000 - 3/000

3779.16

-

-

... More
KM 3/000 - 3/465

1933.95

-

-

... More
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510

-

-

-

... More
KM 0/000 - 1/000

3862.5

-

-

... More
KM 1/000 - 2/000

3750

-

-

... More
KM 2/000 - 3/000

3779.16

-

-

... More
KM 3/000 - 3/465

1933.95

-

-

... More
Provision of Rumble strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
KM 0/000 - 1/000

5.62

-

-

... More
KM 1/000 - 2/000

5.62

-

-

... More
KM 2/000 - 3/000

5.62

-

-

... More
KM 3/000 - 3/465

5.62

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

3

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

1

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

1

-

-

... More
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801)

-

-

-

... More
60 Cm Equilateral triangle (Cautionary) sign Board

8

-

-

... More
60 Cm Circular (Mandatory) sign Board

14

-

-

... More
Chevron Signs 90 cm

5

-

-

... More
Metal Bracket with type IX flotoscent Prismatic reflective shetting which is suitable for guard rail is is available one way/two way. Applied for metal crash barriers / guard rail / to provide refelction across wide range observation

20

-

-

... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface

-

-

-

... More
KM 0/000 - 3/465

693

-

-

... More
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
(ii) Ordinary Kilometer Stone (Precast)

3

-

-

... More
(iii) 200 m stone (precast)

14

-

-

... More
(iv) Guard Stone(precast)

20

-

-

... More
Construction of 6 m Span RCC Slab Culvert (Chainage : 13)

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

2.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

14.82

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.

7.5

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

163.98

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

18.74

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

18.74

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

96.56

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

98.52

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

4.26

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

24.48

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

2.59

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

6

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

14.81

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert (Chainage : 1229)

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

2.8

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

14.82

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.

7.5

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

81.69

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

9.34

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

9.34

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

48.2

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

24.13

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

6.98

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert (Chainage : 1688)

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert (Chainage : 2082)

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Construction of 1.5 m Span RCC Slab Culvert (Chainage : 3197)

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

6.05

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

17.87

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of un, Reinforced Cement Concrete

2.7

-

-

... More
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.

90.63

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

10.36

-

-

... More
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

10.36

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

54.18

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

33.39

-

-

... More
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal)

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification Clauses 1002, 1005, 1010 & 1202.

0.35

-

-

... More
Providing and Fixing 20mm thick Compressible Fiber Board in expansion joint complete as per Drawing and MORD Technical Specification.

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

8.78

-

-

... More
Maintenance of the road

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

3.47

-

-

... More
For the Second Year from the date of completion of work

3.47

-

-

... More
For the Third Year from the date of completion of work

3.47

-

-

... More
For the Fourth Year from the date of completion of work

3.47

-

-

... More
For the Fifth Year from the date of completion of work

3.47

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.