Pradhan Mantri Gram Sadak Yojana Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Eprocure
Opening Date
18 Feb 2019Closing Date
23 Feb 2019Tender Amount
₹ 47,60,000Costs
EMD
₹ 48,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tiruppur District Cgf 2018-19 Gudimangalam Block Pkg No 16
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_RDTN_121780_15Bid Award Id
ViewTender No
DIPR/853/TENDERS/2019 date 5.2.19Tender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
1
-
-
Km 0/0-0/50
405
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc., complete Shoulders
1
-
-
Km 0/0-0/50
135
-
-
Picking 5 cm to 10 cm old metalled surface and sectioning in all etc complete
1
-
-
Km 0/0-0/50
625
-
-
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
1
-
-
Km 0/0-0/50
143.16
-
-
Applying TACK COAT over WBM surface at 4.0Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
1
-
-
Km 0/0-0/50
1908.75
-
-
Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
1
-
-
Km 0/0-0/50
1908.75
-
-
Construction of Retaining wall
1
-
-
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
60.75
-
-
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
15.19
-
-
Cement concrete 1:3:6 mix using 20 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm standard specifications as directed.,
75.94
-
-
Supplying and errecting centering shuttering including necessary supports of size 25mmx25mmx3mm for biarding laid over silver oak scantlings of size 10cmx6.5cm complete complying with standard specifications
270
-
-
Plastering with mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
33.75
-
-
Collection and supply of well gravel from approved quarry including cost and all other charges etc
106.31
-
-
Provision for HM stones
2
-
-
Provision for Sign boards
4
-
-
Provision for Name boards
1
-
-
Strengthening to the road from Km 16/4 of Udumalpet - Tiruppur road to Kondampatti
1
-
-
Clearing light Jungles including all labour charges for burrying and burning etc., complete.,
1
-
-
Km 0/0-0/850
1683
-
-
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
1
-
-
Km 0/0-0/850
573.75
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc., complete Shoulders
1
-
-
Km 0/0-0/850
195.5
-
-
Picking 5 cm to 10 cm old metalled surface and sectioning in all etc complete
1
-
-
Km 0/0-0/850
1000
-
-
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
1
-
-
Km 0/0-0/850
241.59
-
-
Applying TACK COAT over WBM surface at 4.0Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
1
-
-
Km 0/0-0/850
3221.25
-
-
Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
6
-
-
Km 0/0-0/850
3221.25
-
-
Construction of Retaining wall
1
-
-
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
40.5
-
-
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
10.13
-
-
Cement concrete 1:3:6 mix using 20 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm standard specifications as directed.,
50.63
-
-
Supplying and errecting centering shuttering including necessary supports of size 25mmx25mmx3mm for biarding laid over silver oak scantlings of size 10cmx6.5cm complete complying with standard specifications
162
-
-
Plastering with mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
20.25
-
-
Collection and supply of well gravel from approved quarry including cost and all other charges etc
72.9
-
-
HM Stone
4
-
-
Sign board
4
-
-
Name board
1
-
-
Strengthening to the road from Kallapalayam to Burial ground road
1
-
-
Clearing light Jungles including all labour charges for burrying and burning etc., complete.,
1
-
-
Km 0/0-0/50
810
-
-
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
1
-
-
Km 0/0-0/50
405
-
-
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc., complete Shoulders
1
-
-
Km 0/0-0/50
125
-
-
Picking 5 cm to 10 cm old metalled surface and sectioning in all etc complete
1
-
-
Km 0/0-0/50
625
-
-
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
1
-
-
Km 0/0-0/50
143.16
-
-
Applying TACK COAT over WBM surface at 4.0Kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., complete
1
-
-
Km 0/0-0/50
1908.75
-
-
Providing, laying and rolling of open- graded premix carpet of 20 mm thick composed of 13.2 mm to 5.60 mm aggregates eithe using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kn static roller capacity , finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical specification Clause 508.
1
-
-
Km 0/0-0/50
1908.75
-
-
Construction of Retaining wall
1
-
-
Earthwork excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
36
-
-
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
9
-
-
Cement concrete 1:3:6 mix using 20 mm HBG meatl for foundation including watering wherever necessary and laid in layers of not more than 15 cm standard specifications as directed.,
45
-
-
Supplying and errecting centering shuttering including necessary supports of size 25mmx25mmx3mm for biarding laid over silver oak scantlings of size 10cmx6.5cm complete complying with standard specifications
144
-
-
Plastering with mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
18
-
-
Collection and supply of well gravel from approved quarry including cost and all other charges etc
64.8
-
-
Provision for HM stones
2
-
-
Provision for Name boards
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements