Municipal Administration And Water Supply Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Municipal Administration And Water Supply Department - MAWS Tender
Civil Works Others
Eprocure
Opening Date
8 Feb 2019Closing Date
26 Feb 2019Tender Amount
₹ 14,50,00,000Costs
EMD
₹ 14,50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Side Retaining Wall For A Length Of 3.94km And Landscaping.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MAWS_120428_1Tender No
6209/2015/E1Tender Authority
Municipal Administration And Water Supply Department ViewPurchaser Address
-Website
http://https://www.tn.gov.in/maws/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
1616
-
-
Plain Cement concrete 1:4:8 (one cement, four sand, eight.aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.
1616
-
-
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - Drain Side Walls
3945
-
-
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - Vertical Surfaces
35040
-
-
Providing and laying in position Standardised Concrete Mix M-30 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 400Kg/ cum and maximum water cement ratio of 0.45 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. (No separate payment will be made by the Department for the excess usage of materials) - Upto Basement
8385
-
-
Supply and fabrication of Fe - 415 steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification
629
-
-
Removal of excess earth 2km away from site including loading and inloading charges and all labour charges as instructed by the Departmental Offices etc,complete as per standard specifications .
20890
-
-
Supply and Fixing of 110mm Dia PVC Pipe of 10KSC, to fixed on the side walls including cost and conveyance of all materials to site etc,complete as per standard specification
75
-
-
Hire Charges for Engaging the Dewatering pumps of 3 to 7.50Hp Disel Pump Set for removing the staged water in the existing Drains. The Cost Shall inclusive of all charges such as fuel, lubricant and Driver, Cleaner Bata etc, complete.
100
-
-
Supply and fixing of 12mm thick Bitumen Pad for the Expansion Joint in Vertical to the required thickness of good quality. The rate shall inclusive of all charges such as labour charges, cutting charges etc, complete as per standard specification
230
-
-
Providing the areas to be developed with the green carpet of Korean grass would be leveled with a mild uniform slope to void water stagnation problem and to provide clear view of the landscape from any point of the premise, after Leveling the prepared soil bed is raised to the necessary height and slope using rich soil mixture of red soil FYM ( farm Yard Manure’s) Micro nutrients, Fungicides would be spread Micro nutrients, Fungicides would be spread over the leveled ground for an height of 0.15mts. Then the ground would be watered for a week to enable the weeks in the prepared soil bed to germinate. The germinated weeds soil be removed completely. Then the developed lawn Tufts is spread over the prepared area form the lawn within 1 week (turfs are developed in our nursery in controlled chamber and treated to give resistance against the Fungal activities). Then the lawn has to be watered regularly so as to maintain its lush every day for a period of I month after planting / Turfing, But at the same time stagnation of water should be avoided as well as the weeding also be done to maintain the weds free Lawn. Hence the Grass would cover the ground so as form a etc., Complete. As per Std Specifications.
482
-
-