Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Road Construction
Eprocure

Opening Date

6 Sep 2019

Closing Date

9 Oct 2019

Tender Amount

₹ 6,40,69,413 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Package-25, Thanjavur Division Cridp 2019-20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

1673.4

-

12.99

... More
Road D

250

-

12.99

... More
Road F

206.25

-

12.99

... More
Road G

200

-

12.99

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 a) box cutting for widening portion

-

-

-

... More
Road A

423.5

-

73.1

... More
Road B

406

-

73.1

... More
Road C

765.92

-

73.1

... More
Road D

2171.76

-

73.1

... More
Road E

2864.53

-

73.1

... More
Collection and supply of Carted earth including excavation removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for formation of embankment with 97% Compaction.

-

-

-

... More
Road E

1490.5

-

197.37

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-III as per MORTH Vth Rev., 111, 112, 401 & 900.

-

-

-

... More
Road D

420.46

-

2188.78

... More
Road E

278.11

-

2193.18

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density and complete as per clause 401 in accordance with standard specifications for grading-V as per MORTH Vth Rev., 111, 112, 401 & 900.

-

-

-

... More
Road A

266

-

2105.78

... More
Road B

266

-

2118.98

... More
Road C

485.23

-

2123.38

... More
Road D

555.13

-

2096.98

... More
Road E

333.73

-

2101.38

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 406 & 900

-

-

-

... More
Road A

762.5

-

2420.05

... More
Road B

800

-

2420.05

... More
Road C

1203.95

-

2420.05

... More
Road D

1197.83

-

2420.05

... More
Road E

766.07

-

2420.05

... More
Road F

61.88

-

2420.05

... More
Road G

60

-

2420.05

... More
Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 502 & 900

-

-

-

... More
Road A

4400

-

61.21

... More
Road B

4400

-

61.2

... More
Road C

7369.56

-

61.2

... More
Road D

4955.4

-

61.21

... More
Road E

2797.6

-

61.21

... More
Road F

618.75

-

61.18

... More
Road G

600

-

61.19

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900

-

-

-

... More
Road A

4400

-

11.96

... More
Road B

4400

-

11.96

... More
Road C

7369.56

-

11.96

... More
Road D

4955.4

-

11.96

... More
Road E

2797.6

-

11.96

... More
Road F

618.75

-

11.95

... More
Road G

600

-

11.95

... More
Advance BT patch work to an average thickness of 45mm IRC size HBG metals with 44kg of (VG10) 80/100 grade bulk bitumen per 1 cum metals including premixing, laying over the existing BT surface and compaction including all labour and other incidental charges etc., completed as per clause 3004-2 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501 & 900.

-

-

-

... More
Road D

17.27

-

3536.2

... More
Road E

13.58

-

3527.74

... More
Road F

23.03

-

3492.56

... More
Road G

22.32

-

3470.12

... More
Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 and in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 501, 503 & 900

-

-

-

... More
Road D

8238

-

16.81

... More
Road E

5959.5

-

16.81

... More
Road F

4631.25

-

16.81

... More
Road G

4650

-

16.81

... More
Providing and laying Dense Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 Grade Bitumen at the rate of minimum 4.50% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM (Grade-II ) as per MORTH No. 111, 112, 501, 505 & 900

-

-

-

... More
Road A

220

-

8423.58

... More
Road B

220

-

8423.58

... More
Road C

368.2

-

8423.58

... More
Road D

296.87

-

8423.58

... More
Road E

167.18

-

8423.58

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900

-

-

-

... More
Road F

52.5

-

7228.1

... More
Road G

52.5

-

7228.1

... More
Providing and laying Bituminous Concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG30) at percentage specified by job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandam rollers to achieve the desired compaction as per MORTH specification clause No. 501-6, 501-7 & 507 and complete in all respects and in accordance with standard specifications MORTH Vth Rev. 111, 112, 507 & 900 Grading -II

-

-

-

... More
Road A

132

-

9006.43

... More
Road B

132

-

9006.43

... More
Road C

219.81

-

9006.43

... More
Road D

395.57

-

9006.43

... More
Road E

262.71

-

9006.43

... More
Road F

157.5

-

9006.43

... More
Road G

157.5

-

9006.43

... More
Refilling with excavated earth for filling in layers, not exceeding limits including watering consolidation by power roller rolling including all labour charges and incidental charges etc., complete as directed by the Engineer.as per MORTH Vth Rev., 111, 112, 301, 304, 305, 2907

-

-

-

... More
Road A

423.5

-

17.92

... More
Road B

406

-

17.92

... More
Road C

765.92

-

17.92

... More
Road D

2171.76

-

17.92

... More
Road E

2864.53

-

17.92

... More
Collection and supply of Gravel including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900

-

-

-

... More
Road A

240

-

675.16

... More
Road B

210

-

675.16

... More
Road C

315

-

664.65

... More
Road D

110

-

664.76

... More
Road E

463.5

-

644.61

... More
Road F

230.8

-

612.89

... More
Road G

232

-

566.31

... More
Providing RCC M15 grade Precast KM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc., complete (as per MORT & H specification NO.804)

-

-

-

... More
Road A

1

-

2718.8

... More
Road B

1

-

2724.11

... More
Road C

1

-

2725.88

... More
Road D

2

-

2715.85

... More
Road E

1

-

2709.94

... More
Road F

1

-

2708.17

... More
Road G

2

-

2702.27

... More
Providing RCC M15 grade Precast HM stone of standard design as per IRC8-1980 and fixing in position in pedetal including painting,printing etc., complete (as per MORT & H specification NO.804)

-

-

-

... More
Road A

3

-

660.28

... More
Road B

4

-

661.43

... More
Road C

5

-

661.81

... More
Road D

10

-

659.64

... More
Road E

7

-

658.36

... More
Road F

6

-

657.98

... More
Road G

7

-

656.7

... More
CULVERTS & RETAINING WALL

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. a) Dismantling brick masonry/ stone masonry MORTH 111 112 202

-

-

-

... More
Road C

48.8

-

168

... More
Road D

32.32

-

168

... More
Road E

44.1

-

168

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for FOUNDATION

-

-

-

... More
Road C

95.94

-

146.2

... More
Road D

55.53

-

146.2

... More
Road E ( 125.28+84.00)

209.28

-

146.2

... More
Vibrated Cement Concrete M 15 Nominal mix using 40mm ISS size hard broken granite metal and using M- Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Below sill Level as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Road C

8.57

-

5942

... More
Road D

19.81

-

6037

... More
Road E

26.28

-

5637

... More
Vibrated Cement Concrete M 20 grade mix (Nominal mix) using 40mm HBG metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Foundation of Retaining wall (below sill level) as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Road C

28.79

-

6318

... More
Road E

16.8

-

5729

... More
Vibrated Cement Concrete M 20 Nominal mix using 40mm ISS size hard broken granite metal and using M- Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Body wall of culverts and Retaining wall Above sill Level as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Road C

52.4

-

7506

... More
Road D

28.61

-

7387

... More
Road E

160.03

-

7385.17

... More
Vibrated reinforced cement concrete design mix M25 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M-Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for BASE SLAB, STEM AND TOP SLAB OF Box culvert

-

-

-

... More
Road C

132.1

-

9334

... More
Road D

71.8

-

9387

... More
Road E

119.61

-

9575

... More
Providing and fixing seepage pipes of 110 mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900mm dia semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill -1 No.

-

-

-

... More
Road E

80

-

200

... More
Supply and fabrication of (HYSD) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Road C

10.56

-

69850

... More
Road D

5.7

-

69850

... More
Road E

6.84

-

69850

... More
Vibrated cement concrete M30 (Design mix) using 25mm, 12mm and 6mm ISS sized hard granite metal and using M- Sand including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB.

-

-

-

... More
Road C

91.72

-

560

... More
Road D

55.94

-

546.7

... More
Road E

70.98

-

544.9

... More
Vibrated reinforced cement concrete M40 (Design mix) using crushed ISS, hard broken granite graded metal 20mm and below including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering labour charges for laying, compacting curing, including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for CRASH BARRIER.

-

-

-

... More
Road C

20.2

-

3294

... More
Filling with clean good gritty gravel including cost and conveyance of materials to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete and as directed by the departmental officers for filling around the pipe as per MORTH Vth Rev., 305 & 2907

-

-

-

... More
Road E ( 11.20+ 112.50 )

123.7

-

638.01

... More
Quarry Dust Filling around the pipes in between the body wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev., 2907 For Pipe Culvert

-

-

-

... More
Road C

52.31

-

621.22

... More
Road D

33.8

-

600.87

... More
Road E

52.62

-

588.6

... More
Collection and supply of Carted earth including cost and conveyance to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for Diversion Road in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900

-

-

-

... More
Road C

375.8

-

197.37

... More
Road D

578.6

-

197.37

... More
Road E (16.80+394.50)

411.3

-

197.37

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for Pipe culvert and diversion

-

-

-

... More
Road C

15

-

3700

... More
Road D

7.5

-

3700

... More
Road E

22.5

-

3700

... More
Laying and fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 2905, 2906 & 900

-

-

-

... More
Road C

15

-

197

... More
Road D

7.5

-

197

... More
Road E

22.5

-

197

... More
Upkeeping Component

-

-

-

... More
Collection and supply of US gravel including cost and conveyance to worksite and stacking them into road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms. as per MORTH Vth Rev., 111, 112, 401, 408, 900 ( Twice times per year)

-

-

-

... More
Second Year

-

-

-

... More
Road A

101

-

581.38

... More
Road B

86

-

581.38

... More
Road C

205

-

574.33

... More
Road D

355

-

574.33

... More
Road E

154

-

559.76

... More
Road F

167

-

529.68

... More
Road G

176.5

-

492.08

... More
Third Year

-

-

-

... More
Road A

101

-

581.38

... More
Road B

86

-

581.38

... More
Road C

205

-

574.33

... More
Road D

355

-

574.33

... More
Road E

154

-

559.76

... More
Road F

167

-

529.68

... More
Road G

176.5

-

492.08

... More
Fourth Year

-

-

-

... More
Road A

101

-

581.38

... More
Road B

86

-

581.38

... More
Road C

205

-

574.33

... More
Road D

355

-

574.33

... More
Road E

154

-

559.76

... More
Road F

167

-

529.68

... More
Road G

176.5

-

492.08

... More
Fifth Year

-

-

-

... More
Road A

101

-

581.38

... More
Road B

86

-

581.38

... More
Road C

205

-

574.33

... More
Road D

355

-

574.33

... More
Road E

154

-

559.76

... More
Road F

167

-

529.68

... More
Road G

176.5

-

492.08

... More
Clearing the Light jungles including weeding out shrubs bushes, vegetables, growth etc,as per spcifications and directions of Engineer in charge.

-

-

-

... More
First Year

-

-

-

... More
Road A

1212

-

3.9

... More
Road B

1290

-

3.9

... More
Road C

3075

-

3.9

... More
Road D

5325

-

3.9

... More
Road E

2310

-

3.9

... More
Road F

2505

-

3.9

... More
Road G

2647.5

-

3.9

... More
Second Year

-

-

-

... More
Road A

1212

-

3.9

... More
Road B

1290

-

3.9

... More
Road C

3075

-

3.9

... More
Road D

5325

-

3.9

... More
Road E

2310

-

3.9

... More
Road F

2505

-

3.9

... More
Road G

2647.5

-

3.9

... More
Third Year

-

-

-

... More
Road A

1212

-

3.9

... More
Road B

1290

-

3.9

... More
Road C

3075

-

3.9

... More
Road D

5325

-

3.9

... More
Road E

2310

-

3.9

... More
Road F

2505

-

3.9

... More
Road G

2647.5

-

3.9

... More
Fourth Year

-

-

-

... More
Road A

1212

-

3.9

... More
Road B

1290

-

3.9

... More
Road C

3075

-

3.9

... More
Road D

5325

-

3.9

... More
Road E

2310

-

3.9

... More
Road F

2505

-

3.9

... More
Road G

2647.5

-

3.9

... More
Fifth Year

-

-

-

... More
Road A

1212

-

3.9

... More
Road B

1290

-

3.9

... More
Road C

3075

-

3.9

... More
Road D

5325

-

3.9

... More
Road E

2310

-

3.9

... More
Road F

2505

-

3.9

... More
Road G

2647.5

-

3.9

... More
Provision for engaging JCB for Clearing the vent way of CD works, and minor Bridges, clearing storm water drains and removing debris along roadside during urgent periods.

-

-

-

... More
First Year

-

-

-

... More
Road A

2

-

700

... More
Road B

2

-

700

... More
Road C

6

-

700

... More
Road D

2

-

700

... More
Road E

10

-

700

... More
Road F

8

-

700

... More
Road G

8

-

700

... More
Second Year

-

-

-

... More
Road A

2

-

700

... More
Road B

2

-

700

... More
Road C

6

-

700

... More
Road D

2

-

700

... More
Road E

10

-

700

... More
Road F

8

-

700

... More
Road G

8

-

700

... More
Third Year

-

-

-

... More
Road A

2

-

700

... More
Road B

2

-

700

... More
Road C

6

-

700

... More
Road D

2

-

700

... More
Road E

10

-

700

... More
Road F

8

-

700

... More
Road G

8

-

700

... More
Fourth Year

-

-

-

... More
Road A

2

-

700

... More
Road B

2

-

700

... More
Road C

6

-

700

... More
Road D

2

-

700

... More
Road E

10

-

700

... More
Road F

8

-

700

... More
Road G

8

-

700

... More
Fifth Year

-

-

-

... More
Road A

2

-

700

... More
Road B

2

-

700

... More
Road C

6

-

700

... More
Road D

2

-

700

... More
Road E

10

-

700

... More
Road F

8

-

700

... More
Road G

8

-

700

... More
Painting with Plastic Enamel paint over the existing boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, cautionary board and Sign board etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
First Year

-

-

-

... More
Road A

0.97

-

158.1

... More
Road B

0.99

-

158.1

... More
Road C

2.23

-

158.1

... More
Road D

1.85

-

158.1

... More
Road E

4.5

-

158.1

... More
Road F

2.93

-

158.1

... More
Road G

2.93

-

158.1

... More
Second Year

-

-

-

... More
Road A

3.13

-

158.1

... More
Road B

3.51

-

158.1

... More
Road C

5.47

-

158.1

... More
Road D

7.61

-

158.1

... More
Road E

8.1

-

158.1

... More
Road F

6.17

-

158.1

... More
Road G

7.61

-

158.1

... More
Third Year

-

-

-

... More
Road A

3.13

-

158.1

... More
Road B

3.51

-

158.1

... More
Road C

5.47

-

158.1

... More
Road D

7.61

-

158.1

... More
Road E

8.1

-

158.1

... More
Road F

6.17

-

158.1

... More
Road G

7.61

-

158.1

... More
Fourth Year

-

-

-

... More
Road A

3.13

-

158.1

... More
Road B

3.51

-

158.1

... More
Road C

5.47

-

158.1

... More
Road D

7.61

-

158.1

... More
Road E

8.1

-

158.1

... More
Road F

6.17

-

158.1

... More
Road G

7.61

-

158.1

... More
Fifth Year

-

-

-

... More
Road A

3.13

-

158.1

... More
Road B

3.51

-

158.1

... More
Road C

5.47

-

158.1

... More
Road D

7.61

-

158.1

... More
Road E

8.1

-

158.1

... More
Road F

6.17

-

158.1

... More
Road G

7.61

-

158.1

... More
White washing over the existing Culverts, Parapet and minor bridge including cost of materials and labour charges etc, complete.

-

-

-

... More
First Year

-

-

-

... More
Road A

23.09

-

22.78

... More
Road B

26.68

-

22.78

... More
Road C

45.36

-

22.78

... More
Road D

88.31

-

22.78

... More
Road E

94.66

-

22.78

... More
Road F

44.88

-

22.78

... More
Road G

47.13

-

22.78

... More
Second Year

-

-

-

... More
Road A

23.09

-

22.78

... More
Road B

26.68

-

22.78

... More
Road C

45.36

-

22.78

... More
Road D

88.31

-

22.78

... More
Road E

94.66

-

22.78

... More
Road F

44.88

-

22.78

... More
Road G

47.13

-

22.78

... More
Third Year

-

-

-

... More
Road A

23.09

-

22.78

... More
Road B

26.68

-

22.78

... More
Road C

45.36

-

22.78

... More
Road D

88.31

-

22.78

... More
Road E

94.66

-

22.78

... More
Road F

44.88

-

22.78

... More
Road G

47.13

-

22.78

... More
Fourth Year

-

-

-

... More
Road A

23.09

-

22.78

... More
Road B

26.68

-

22.78

... More
Road C

45.36

-

22.78

... More
Road D

88.31

-

22.78

... More
Road E

94.66

-

22.78

... More
Road F

44.88

-

22.78

... More
Road G

47.13

-

22.78

... More
Fifth Year

-

-

-

... More
Road A

23.09

-

22.78

... More
Road B

26.68

-

22.78

... More
Road C

45.36

-

22.78

... More
Road D

88.31

-

22.78

... More
Road E

94.66

-

22.78

... More
Road F

44.88

-

22.78

... More
Road G

47.13

-

22.78

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers

-

-

-

... More
First Year

-

-

-

... More
Road A

7.33

-

135

... More
Road B

9.27

-

135

... More
Road C

8.28

-

135

... More
Road D

39.36

-

135

... More
Road E

26.24

-

135

... More
Road F

5.56

-

135

... More
Road G

6.69

-

135

... More
Second Year

-

-

-

... More
Road A

7.33

-

135

... More
Road B

9.27

-

135

... More
Road C

8.28

-

135

... More
Road D

39.36

-

135

... More
Road E

26.24

-

135

... More
Road F

5.56

-

135

... More
Road G

6.69

-

135

... More
Third Year

-

-

-

... More
Road A

7.33

-

135

... More
Road B

9.27

-

135

... More
Road C

8.28

-

135

... More
Road D

39.36

-

135

... More
Road E

26.24

-

135

... More
Road F

5.56

-

135

... More
Road G

6.69

-

135

... More
Fourth Year

-

-

-

... More
Road A

7.33

-

135

... More
Road B

9.27

-

135

... More
Road C

8.28

-

135

... More
Road D

39.36

-

135

... More
Road E

26.24

-

135

... More
Road F

5.56

-

135

... More
Road G

6.69

-

135

... More
Fifth Year

-

-

-

... More
Road A

7.33

-

135

... More
Road B

9.27

-

135

... More
Road C

8.28

-

135

... More
Road D

39.36

-

135

... More
Road E

26.24

-

135

... More
Road F

5.56

-

135

... More
Road G

6.69

-

135

... More
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10cm

-

-

-

... More
First Year

-

-

-

... More
Road A

95

-

6.1

... More
Road B

96

-

6.1

... More
Road C

255

-

6.1

... More
Road D

134

-

6.1

... More
Road E

460

-

6.1

... More
Road F

338

-

6.1

... More
Road G

338

-

6.1

... More
Second Year

-

-

-

... More
Road A

137

-

6.1

... More
Road B

142

-

6.1

... More
Road C

309

-

6.1

... More
Road D

234

-

6.1

... More
Road E

518

-

6.1

... More
Road F

392

-

6.1

... More
Road G

426

-

6.1

... More
Third Year

-

-

-

... More
Road A

137

-

6.1

... More
Road B

142

-

6.1

... More
Road C

309

-

6.1

... More
Road D

234

-

6.1

... More
Road E

518

-

6.1

... More
Road F

392

-

6.1

... More
Road G

426

-

6.1

... More
Fourth Year

-

-

-

... More
Road A

137

-

6.1

... More
Road B

142

-

6.1

... More
Road C

309

-

6.1

... More
Road D

234

-

6.1

... More
Road E

518

-

6.1

... More
Road F

392

-

6.1

... More
Road G

426

-

6.1

... More
Fifth Year

-

-

-

... More
Road A

137

-

6.1

... More
Road B

142

-

6.1

... More
Road C

309

-

6.1

... More
Road D

234

-

6.1

... More
Road E

518

-

6.1

... More
Road F

392

-

6.1

... More
Road G

426

-

6.1

... More
Letterings in Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15cm

-

-

-

... More
First Year

-

-

-

... More
Road A

8

-

9.15

... More
Road B

8

-

9.15

... More
Road C

24

-

9.15

... More
Road D

8

-

9.15

... More
Road E

40

-

9.15

... More
Road F

32

-

9.15

... More
Road G

32

-

9.15

... More
Second Year

-

-

-

... More
Road A

24

-

9.15

... More
Road B

26

-

9.15

... More
Road C

46

-

9.15

... More
Road D

48

-

9.15

... More
Road E

64

-

9.15

... More
Road F

54

-

9.15

... More
Road G

66

-

9.15

... More
Third Year

-

-

-

... More
Road A

24

-

9.15

... More
Road B

26

-

9.15

... More
Road C

46

-

9.15

... More
Road D

48

-

9.15

... More
Road E

64

-

9.15

... More
Road F

54

-

9.15

... More
Road G

66

-

9.15

... More
Fourth Year

-

-

-

... More
Road A

24

-

9.15

... More
Road B

26

-

9.15

... More
Road C

46

-

9.15

... More
Road D

48

-

9.15

... More
Road E

64

-

9.15

... More
Road F

54

-

9.15

... More
Road G

66

-

9.15

... More
Fifth Year

-

-

-

... More
Road A

24

-

9.15

... More
Road B

26

-

9.15

... More
Road C

46

-

9.15

... More
Road D

48

-

9.15

... More
Road E

64

-

9.15

... More
Road F

54

-

9.15

... More
Road G

66

-

9.15

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces

-

-

-

... More
Fourth Year

-

-

-

... More
Road A

90

-

16.81

... More
Road B

90

-

16.81

... More
Road C

157.5

-

16.81

... More
Road D

219.38

-

16.81

... More
Road E

180

-

16.81

... More
Road F

157.5

-

16.81

... More
Road G

157.5

-

16.81

... More
Fifth Year

-

-

-

... More
Road A

150

-

16.81

... More
Road B

150

-

16.81

... More
Road C

262.5

-

16.81

... More
Road D

365.63

-

16.81

... More
Road E

300

-

16.81

... More
Road F

262.5

-

16.81

... More
Road G

262.5

-

16.81

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Fourth Year

-

-

-

... More
Road A

2.7

-

9006.43

... More
Road B

2.7

-

9006.43

... More
Road C

4.73

-

9006.43

... More
Road D

6.58

-

9006.43

... More
Road E

5.4

-

9006.43

... More
Road F

4.73

-

9006.43

... More
Road G

4.73

-

9006.43

... More
Fifth Year

-

-

-

... More
Road A

4.5

-

9006.43

... More
Road B

4.5

-

9006.43

... More
Road C

7.88

-

9006.43

... More
Road D

10.97

-

9006.43

... More
Road E

9

-

9006.43

... More
Road F

7.88

-

9006.43

... More
Road G

7.88

-

9006.43

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

58770700

... More
Add GST at 12%

1

-

7052484

... More
Total Value put to Tender

1

-

65823184

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.