Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Eprocure

Opening Date

30 May 2020

Closing Date

1 Jul 2020

Tender Amount

₹ 5,39,52,202 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Road D

424.5

-

62.13

... More
Road E

413

-

62.14

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Road D

424.5

-

11.97

... More
Road E

413

-

11.97

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Road A

9513.15

-

21.16

... More
Road B

11347

-

21.16

... More
Road C

9009.45

-

21.16

... More
Road D

3558.2

-

21.16

... More
Road E

5660.73

-

21.16

... More
Bituminous Macadam Providing and laying bituminous macadam with Mini Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface using manual labour to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7) for patch work. (Table 500-7). (Morth No. 111, 112, 501, 504, 900)

1

-

-

... More
Road A

41.27

-

6758.99

... More
Road B

41.27

-

6800.13

... More
Road C

41.27

-

6841.25

... More
Road D

12.15

-

6747.56

... More
Road E

23.71

-

6798.41

... More
Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7). (Morth No. 111, 112, 501, 504, 900)

1

-

-

... More
Road A

475.66

-

6677.64

... More
Road B

567.35

-

6677.64

... More
Road C

450.47

-

6677.64

... More
Road D

39.83

-

6677.64

... More
Road E

60.74

-

6677.64

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects -Grading II (111, 112, 501, 507, 900)

1

-

-

... More
Road A

285.39

-

8075.08

... More
Road B

340.41

-

8075.08

... More
Road C

270.28

-

8075.08

... More
Road D

119.48

-

8075.08

... More
Road E

182.21

-

8075.08

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side Drains in accordance with the specifications and lines , grades and cross sections shown in the drawings or as directed by the Engineer For high berms cutting (Morth No. 111, 112, 301, 305, 900)

1

-

-

... More
Road A

1199.5

-

117.6

... More
Road B

1430.83

-

117.6

... More
Road C

1642.34

-

117.6

... More
Road D

1760.23

-

117.6

... More
Road E

3168.44

-

117.6

... More
RETAINING WALL

1

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel stoney, earth etc., and depositing on bank with all leads and lifts and all other incidental charges complete as per standard specification For Foundation as per SS 20B (Morth No. 111, 112, 304)

1

-

-

... More
Road F

254.1

-

235.2

... More
Cement Concrete M-20 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting and all other incidental charges etc., complete. For Foundation of Culvert & Retaining wall (Morth No. 111, 112,1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road F

50.82

-

6873.8

... More
Cement Concrete M-20 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting and all other incidental charges etc., complete. Body Wall of Culvert & Retaining Wall (Morth No. 111, 112,1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road F

398.95

-

8633.55

... More
Refilling with earth other than sand in between body walls complying with standard specification including all labour charges and all others incidental charges etc., complete for Retanng walls (Box Cut Earth Labour Charges only) (Morth No. 304, 900)

1

-

-

... More
Road F

638.13

-

41.02

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision " Fifth Revision Cl. 305--4.4, 309-3.2 and Cl 2504 etc., complete

1

-

-

... More
Road F

110.88

-

1891.29

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. (Morth No. 2706, 900)

1

-

-

... More
Road F

104

-

172.8

... More
SUB ESTIMATE - RETAINING WALL

1

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel stoney, earth etc., and depositing on bank with all leads and lifts and all other incidental charges complete as per standard specification For Foundation as per SS 20B (Morth No. 111, 112, 304)

1

-

-

... More
Road A

174.9

-

235.2

... More
Road B

132

-

235.2

... More
Road C

237.6

-

235.2

... More
Cement Concrete M-20 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting and all other incidental charges etc., complete. For Foundation of Culvert & Retaining wall (Morth No. 111, 112,1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road A

34.98

-

6713.96

... More
Road B

26.4

-

6742.31

... More
Road C

47.52

-

6800.55

... More
Cement Concrete M-20 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting and all other incidental charges etc., complete. Body Wall of Culvert & Retaining Wall (Morth No. 111, 112,1000, 1500, 1700, 2200, 900)

1

-

-

... More
Road A

281.2

-

8360.91

... More
Road B

207.2

-

8287.26

... More
Road C

373.05

-

8408.15

... More
Refilling with earth other than sand in between body walls complying with standard specification including all labour charges and all others incidental charges etc., complete for Retanng walls (Box Cut Earth Labour Charges only) (Morth No. 304, 900)

1

-

-

... More
Road A

585.08

-

41.02

... More
Road B

414.4

-

41.02

... More
Road C

774.72

-

41.02

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision " Fifth Revision Cl. 305--4.4, 309-3.2 and Cl 2504 etc., complete

1

-

-

... More
Road A

76.32

-

1773.32

... More
Road B

57.6

-

1795.3

... More
Road C

103.68

-

1838.44

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. (Morth No. 2706, 900)

1

-

-

... More
Road A

68.9

-

172.8

... More
Road B

52

-

172.8

... More
Road C

93.6

-

172.8

... More
SUB ESTIMATE - CC DRAIN

1

-

-

... More
Earth work Excavation of stiff clay soil including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Boxing with a lead FOR DRAIN

1

-

-

... More
Road A

333

-

117.6

... More
Road B

337.5

-

117.6

... More
Road C

345.6

-

117.6

... More
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting and all other incidental charges etc., complete. BASE COURSE TO DRAIN

1

-

-

... More
Road A

222

-

6530.15

... More
Road B

225

-

6569.89

... More
Road C

230.4

-

6608.47

... More
Cement Concrete M 20 using 20mm and 12mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour for formwork, laying watering curing and compacting vibrator charges and all other incidental charges etc., complete. DRAIN

1

-

-

... More
Road A

286.5

-

7150.73

... More
Road B

205.05

-

7191.71

... More
Road C

160.2

-

7229.27

... More
UPKEEIPING - ROAD A

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
I st Year

2579.4

-

6.16

... More
II nd Year

2579.4

-

6.16

... More
III rd Year

2579.4

-

6.16

... More
IV th Year

2579.4

-

6.16

... More
V th Year

2579.4

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
I st Year

4.93

-

141.27

... More
II nd Year

4.93

-

141.27

... More
III rd Year

4.93

-

141.27

... More
IV th Year

4.93

-

141.27

... More
V th Year

4.93

-

141.27

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

72

-

700

... More
II nd Year

72

-

700

... More
III rd Year

72

-

700

... More
IV th Year

72

-

700

... More
V th Year

72

-

700

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

7.27

-

157.2

... More
II nd Year

7.27

-

157.2

... More
III rd Year

7.27

-

157.2

... More
IV th Year

7.27

-

157.2

... More
V th Year

7.27

-

157.2

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

64

-

7.28

... More
II nd Year

64

-

7.28

... More
III rd Year

64

-

7.28

... More
IV th Year

64

-

7.28

... More
V th Year

64

-

7.28

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (15 cm Km stones)

1

-

-

... More
I st Year

4

-

12.13

... More
II nd Year

4

-

12.13

... More
III rd Year

4

-

12.13

... More
IV th Year

4

-

12.13

... More
V th Year

4

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

193.86

-

25

... More
II nd Year

193.86

-

25

... More
III rd Year

193.86

-

25

... More
IV th Year

193.86

-

25

... More
V th Year

193.86

-

25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

104

-

90

... More
II nd Year

104

-

90

... More
III rd Year

104

-

90

... More
IV th Year

104

-

90

... More
V th Year

104

-

90

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vith Year

285.39

-

21.17

... More
Vth Year

475.66

-

21.17

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Vith Year

8.56

-

8466.19

... More
Vth Year

14.27

-

8466.19

... More
UPKEEIPING - ROAD B

1

-

-

... More
Clearing of Light jungle directed by the departmental officers etc Complete.

1

-

-

... More
I st Year

2579.4

-

6.16

... More
II nd Year

2579.4

-

6.16

... More
III rd Year

2579.4

-

6.16

... More
IV th Year

2579.4

-

6.16

... More
V th Year

2579.4

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
I st Year

4.93

-

141.27

... More
II nd Year

4.93

-

141.27

... More
III rd Year

4.93

-

141.27

... More
IV th Year

4.93

-

141.27

... More
V th Year

4.93

-

141.27

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

60

-

700

... More
II nd Year

60

-

700

... More
III rd Year

60

-

700

... More
IV th Year

60

-

700

... More
V th Year

60

-

700

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

7.27

-

157.2

... More
II nd Year

7.27

-

157.2

... More
III rd Year

7.27

-

157.2

... More
IV th Year

7.27

-

157.2

... More
V th Year

7.27

-

157.2

... More
Lettering the existing KM/HM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

64

-

7.28

... More
II nd Year

64

-

7.28

... More
III rd Year

64

-

7.28

... More
IV th Year

64

-

7.28

... More
V th Year

64

-

7.28

... More
Lettering the existing HM Stones as per IRC standard including the cost of labour charges and materials etc., complete (15 cm HM/Km stones)

1

-

-

... More
I st Year

4

-

12.13

... More
II nd Year

4

-

12.13

... More
III rd Year

4

-

12.13

... More
IV th Year

4

-

12.13

... More
V th Year

4

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

179.05

-

25

... More
II nd Year

179.05

-

25

... More
III rd Year

179.05

-

25

... More
IV th Year

179.05

-

25

... More
V th Year

179.05

-

25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

104

-

90

... More
II nd Year

104

-

90

... More
III rd Year

104

-

90

... More
IV th Year

104

-

90

... More
V th Year

104

-

90

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vith Year

340.41

-

21.16

... More
Vth Year

567.35

-

21.16

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Vith Year

10.21

-

8507.05

... More
Vth Year

17.02

-

8507.05

... More
UPKEEIPING - ROAD C

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
I st Year

2793.96

-

6.16

... More
II nd Year

2793.96

-

6.16

... More
III rd Year

2793.96

-

6.16

... More
IV th Year

2793.96

-

6.16

... More
V th Year

2793.96

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
I st Year

4.93

-

141.27

... More
II nd Year

4.93

-

141.27

... More
III rd Year

4.93

-

141.27

... More
IV th Year

4.93

-

141.27

... More
V th Year

4.93

-

141.27

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

72

-

700

... More
II nd Year

72

-

700

... More
III rd Year

72

-

700

... More
IV th Year

72

-

700

... More
V th Year

72

-

700

... More
Painting of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

7.27

-

157.2

... More
II nd Year

7.27

-

157.2

... More
III rd Year

7.27

-

157.2

... More
IV th Year

7.27

-

157.2

... More
V th Year

7.27

-

157.2

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

64

-

7.28

... More
II nd Year

64

-

7.28

... More
III rd Year

64

-

7.28

... More
IV th Year

64

-

7.28

... More
V th Year

64

-

7.28

... More
Lettering the existing HM Stones as per IRC standard including the cost of labour charges and materials etc., complete (15 cm HM/Km stones)

1

-

-

... More
I st Year

4

-

12.13

... More
II nd Year

4

-

12.13

... More
III rd Year

4

-

12.13

... More
IV th Year

4

-

12.13

... More
V th Year

4

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

193.86

-

25

... More
II nd Year

193.86

-

25

... More
III rd Year

193.86

-

25

... More
IV th Year

193.86

-

25

... More
V th Year

193.86

-

25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

104

-

90

... More
II nd Year

104

-

90

... More
III rd Year

104

-

90

... More
IV th Year

104

-

90

... More
V th Year

104

-

90

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vith Year

270.28

-

21.16

... More
Vth Year

450.47

-

21.16

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Vith Year

8.11

-

8547.13

... More
Vth Year

13.51

-

8547.13

... More
UPKEEIPING - ROAD D

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
I st Year

676.8

-

6.16

... More
II nd Year

676.8

-

6.16

... More
III rd Year

676.8

-

6.16

... More
IV th Year

676.8

-

6.16

... More
V th Year

676.8

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
I st Year

4.93

-

141.27

... More
II nd Year

4.93

-

141.27

... More
III rd Year

4.93

-

141.27

... More
IV th Year

4.93

-

141.27

... More
V th Year

4.93

-

141.27

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

24

-

700

... More
II nd Year

24

-

700

... More
III rd Year

24

-

700

... More
IV th Year

24

-

700

... More
V th Year

24

-

700

... More
Painting,Lettering of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

7.27

-

157.2

... More
II nd Year

7.27

-

157.2

... More
III rd Year

7.27

-

157.2

... More
IV th Year

7.27

-

157.2

... More
V th Year

7.27

-

157.2

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

64

-

7.28

... More
II nd Year

64

-

7.28

... More
III rd Year

64

-

7.28

... More
IV th Year

64

-

7.28

... More
V th Year

64

-

7.28

... More
Lettering the existing HM Stones as per IRC standard including the cost of labour charges and materials etc., complete (15 cm HM/Km stones)

1

-

-

... More
I st Year

4

-

12.13

... More
II nd Year

4

-

12.13

... More
III rd Year

4

-

12.13

... More
IV th Year

4

-

12.13

... More
V th Year

4

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

134.62

-

25

... More
II nd Year

134.62

-

25

... More
III rd Year

134.62

-

25

... More
IV th Year

134.62

-

25

... More
V th Year

134.62

-

25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

104

-

90

... More
II nd Year

104

-

90

... More
III rd Year

104

-

90

... More
IV th Year

104

-

90

... More
V th Year

104

-

90

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vith Year

119.48

-

21.16

... More
Vth Year

199.14

-

21.16

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Vith Year

3.58

-

8456.05

... More
Vth Year

5.97

-

8456.05

... More
UPKEEIPING - ROAD E

1

-

-

... More
Clearing of Light jungle as directed by the departmental officers etc Complete.

1

-

-

... More
I st Year

1322.1

-

6.16

... More
II nd Year

1322.1

-

6.16

... More
III rd Year

1322.1

-

6.16

... More
IV th Year

1322.1

-

6.16

... More
V th Year

1322.1

-

6.16

... More
Up keeping component of Making up of Low berms using side earth including cost of compaction by power roller and all other incidental charges etc complete

1

-

-

... More
I st Year

4.93

-

141.27

... More
II nd Year

4.93

-

141.27

... More
III rd Year

4.93

-

141.27

... More
IV th Year

4.93

-

141.27

... More
V th Year

4.93

-

141.27

... More
Major Bridges/Culvert vent clearance Thrice a year -Hiring JCB for uprooting heavy jungle, clearing the dumped earth, cutting the high berms, making side drains, clearing the earth slips and removing wind fallen trees etc., and as directed by the departmental officers.

1

-

-

... More
I st Year

30

-

700

... More
II nd Year

30

-

700

... More
III rd Year

30

-

700

... More
IV th Year

30

-

700

... More
V th Year

30

-

700

... More
Painting,Lettering of KM/HM Stones- Once a Year. Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

7.27

-

157.2

... More
II nd Year

7.27

-

157.2

... More
III rd Year

7.27

-

157.2

... More
IV th Year

7.27

-

157.2

... More
V th Year

7.27

-

157.2

... More
Lettering the existing KM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

64

-

7.28

... More
II nd Year

64

-

7.28

... More
III rd Year

64

-

7.28

... More
IV th Year

64

-

7.28

... More
V th Year

64

-

7.28

... More
Lettering the existing HM Stones as per IRC standard including the cost of labour charges and materials etc., complete (10 cm HM/Km stones)

1

-

-

... More
I st Year

4

-

12.13

... More
II nd Year

4

-

12.13

... More
III rd Year

4

-

12.13

... More
IV th Year

4

-

12.13

... More
V th Year

4

-

12.13

... More
White washing parapets of Culvert/Bridge,Protective walls , Kerb wall etc - Once a Year. White washing One coat using best freshly burnt shell lime including cost of lime and other materials complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

142.03

-

25

... More
II nd Year

142.03

-

25

... More
III rd Year

142.03

-

25

... More
IV th Year

142.03

-

25

... More
V th Year

142.03

-

25

... More
Tree Banding Once a Year.Painting One coats with best of approved quality enamel paint including the cost of Paint, brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.

1

-

-

... More
I st Year

104

-

90

... More
II nd Year

104

-

90

... More
III rd Year

104

-

90

... More
IV th Year

104

-

90

... More
V th Year

104

-

90

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces (Morth No. 111, 112, 501, 502, 900)

1

-

-

... More
Vith Year

182.21

-

21.16

... More
Vth Year

303.69

-

21.16

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with mini hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with manual labour to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)

1

-

-

... More
Vith Year

5.47

-

8511.09

... More
Vth Year

9.11

-

8511.09

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

1

-

-

... More
Basic cost of value put to tender as per estimate

1

-

48171609

... More
Add GST at 12%

1

-

5780593

... More
Total Value put to Tender

1

-

53952202

... More
Differnce Amount (Excess/less)

1

-

-

... More
Quoted Amount (Basic Rate Only)

1

-

-

... More
Add GST at 12% of Quoted Amount

1

-

-

... More
Total Value of Quoted Amount including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Quoted Amount Including 12% of GST )

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.