Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Eprocure

Opening Date

13 Sep 2019

Closing Date

29 Oct 2019

Tender Amount

₹ 7,39,99,696 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ROAD C

223.67

2905

12.99

... More
ROAD E

1750

22732

12.99

... More
ROAD F

228.67

2970

12.99

... More
ROAD G

3500

45465

12.99

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Box Cutting for Widening Portion and as per MORTH No. 111, 112, 301, 302.

-

-

-

... More
ROAD A

1204.8

88070

73.1

... More
Providing and Laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
ROAD A

355.5

599518

1686.41

... More
Providing and Laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
ROAD A

355.5

568444

1599

... More
Providing and Laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

-

-

-

... More
ROAD A

2058.8

3638311

1767.2

... More
ROAD B

103.98

194899

1874.39

... More
ROAD C

100.67

191691

1904.16

... More
ROAD E

1237.5

2201153

1778.71

... More
ROAD F

102.9

197980

1924.01

... More
ROAD G

2250

4002097

1778.71

... More
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg / sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502, 900

-

-

-

... More
ROAD A

11060

675987

61.12

... More
ROAD B

693

42363

61.13

... More
ROAD C

671

41018

61.13

... More
ROAD E

5250

320880

61.12

... More
ROAD F

686

41928

61.12

... More
ROAD G

10500

641865

61.13

... More
Providing and applying Tack Coat over granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

-

-

-

... More
ROAD A

11060

131945

11.93

... More
ROAD B

693

8267

11.93

... More
ROAD C

671

8005

11.93

... More
ROAD E

5250

62632

11.93

... More
ROAD F

686

8183

11.93

... More
ROAD G

10500

125265

11.93

... More
Providing and applying Tack Coat over existing bituminous surfaces with Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of 0.20 kg per sqm on the prepared bituminous surface as directed by the Engineer as per MORTH No. 111, 112, 503, 900

-

-

-

... More
ROAD B

16907

283868

16.79

... More
ROAD C

15829

265768

16.79

... More
ROAD F

30814

517367

16.79

... More
ROAD G

159

2669

16.79

... More
Providing and laying Dense Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 Grade grade Bitumen confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for DBM (Grade-II ) as per MORTH No. 111, 112, 505, 900

-

-

-

... More
ROAD E

288.76

2225785

7708.08

... More
ROAD G

580.49

4472977

7705.52

... More
Providing and laying Bituminous Macadam which work shall consist of construction, using crushed aggregates, premixed with VG 30 Grade Bitumen at the rate of 3.40% by weight of the total mix confirming to the aggregates and binder as per table no.500-7 in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for BM (Grade-II) as per MORTH No. 111, 112, 504 900

-

-

-

... More
ROAD A

553

3602098

6513.74

... More
ROAD B

215.94

1431379

6628.6

... More
ROAD C

202.2

1362423

6738

... More
ROAD F

389.55

2600721

6676.22

... More
Providing and laying Bituminous Concrete which work shall consist of construction using coarse aggregates (Table 500-17) premixed with VG 30 Grade Bitumen confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for BC (Grade-II) as per MORTH No. 111, 112, 507, 900

-

-

-

... More
ROAD A

331.8

2752463

8295.55

... More
ROAD B

532.07

4473910

8408.5

... More
ROAD C

495

4242907

8571.53

... More
ROAD E

159.72

1326953

8308

... More
ROAD F

950.18

8030256

8451.3

... More
ROAD G

322.55

2678771

8304.98

... More
Providing and laying U.S gravel including cost and conveyance of U.S gravel from approved quarry to work site including spreading watering with all leads and consolidation by power roller and all other incidental charges etc., complete as per standard specification for Shoulders

-

-

-

... More
ROAD A

474

165549

349.26

... More
ROAD B

960

522518

544.29

... More
ROAD C

600

342930

571.55

... More
Providing and laying Carted Earth having minimum CBR of 8 with an additional lead of including conveyance, laying, watering and consolidation etc., complete as directed by the Engineer for forming the shoulders as per MORTH No.111, 112, 305, 900

-

-

-

... More
ROAD E (Lead 10km)

930

205539

221.01

... More
ROAD F (Lead 13km)

900

226215

251.35

... More
ROAD G (Lead 10km)

1760

388977

221.01

... More
Refilling the excavated earth from the available site earth including laying watering and consolidation etc., complete

-

-

-

... More
ROAD A

705

12612

17.89

... More
Providing and laying hot applied thermoplastic compound 2.50mm thick including reflectoring glass beeds @ 250gms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC : 35 the finished surface to be level uniform and free streaks & holes etc., complete as per MORT&H Specification No 111,112,803,900

-

-

-

... More
ROAD A

213.6

171948

805

... More
ROAD B

125.5

101027

805

... More
ROAD E

47

37835

805

... More
ROAD F

331.85

267139

805

... More
ROAD G

49.75

40048

805

... More
Providing R.C.C.M15 grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including and printing etc,. Complete. (as per MORTH & H specification No.804)

-

-

-

... More
ROAD A

2

1812

906

... More
ROAD B

4

3624

906

... More
ROAD F

4

3624

906

... More
Providing R.C.C.M15 grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position including and printing etc,. Complete. (as per MORTH & H specification No.804)

-

-

-

... More
ROAD A

6

1536

256

... More
ROAD B

12

3072

256

... More
ROAD F

18

4608

256

... More
Box culvert

-

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Plain Cement Concrete as per MORTH No.111,112,202

-

-

-

... More
ROAD D

52.6

15201

289

... More
Earth work excavation in all classes of soils except soft rock / disintegrated rock not requiring blasting and depositing on bank with all leads and lifts as per SS 20B including cost of all labour, equipments and all incidental charges trimming bottom of excavation, back filling and cleaning the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION. as per MORTH No. 111, 112, 304.

-

-

-

... More
ROAD D

523.74

76570

146.2

... More
Filling with M- sand from PWD approved M-Sand quarry including cost and conveyance to worksite including all labour charges for filling wateriang and consolidation etc.complete for foundation as per the drawing and std. specification as per MORTh No. 111,112, 900

-

-

-

... More
ROAD D

40.68

80654

1982.65

... More
Vibrated Cement Concrete of grade M15 (nominal mix) using40mm HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and employed etc., complete as per relevant standard specification for LEVELLING COURSE as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
ROAD D

22.32

119870

5370.54

... More
Vibrated Cement Concrete of grade M20 (nominal mix) using40mm HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and employed etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENT , WING WALLS (BELOW SILL LEVEL) as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
ROAD D

19.2

110389

5749.47

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and employed etc., complete as per relevant standard specification for SUB STRUCTURE OF WING WALL (Above sill level) as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200

-

-

-

... More
ROAD D

38.37

222909

5809.47

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and employed etc., complete as per relevant standard specifications as directed by the Engineer as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200 for BASE SLAB (Below sill)

-

-

-

... More
ROAD D

59.78

450117

7529.57

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and employed etc., complete as per relevant standard specifications as directed by the Engineer as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200 for Side wall & Deck Slab

-

-

-

... More
ROAD D

82.28

764901

9296.32

... More
Vibrated Reinforced Cement concrete M30 (Design mix) WEARING COAT 75mm thickness using IRC size HBG graded metal with M - Sand including cost and conveyance of all materials to site excluding cost for fabrication of steel but including cost of cement, premoulded expansion joints and fixing the same in position including formwork and centering labour charges for laying, compacting finishing curing including all other incidental charges etc.complete Over Deck Slab / Appraoch Slab as per MORTH No.111,112, 2702, 900

-

-

-

... More
ROAD D

100.11

53657

535.99

... More
Supply and fabrication of Fe 500 Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
ROAD D

9.54

666369

69850

... More
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete as per MORTH No. 309

-

-

-

... More
ROAD D

16.7

23606

1413.57

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings as per MORTH No. 111,112, 305, 900

-

-

-

... More
ROAD D

17.59

5757

327.3

... More
Providing and fixing 110mm dia PVC seepage pipes of required length for abutments and wings including cost and conveyance of all materials to work site, cost and labour semi spherical backfill arrangements with 100mm size granite stone at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification as per MORTH No.2706

-

-

-

... More
ROAD D

34.2

5909

172.8

... More
Providing and fixing of GI Drainage spout 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mmx 25mm flats for grating arrangements and 100mm dia drainage spout projecting beyond the bottom of deck slab as showing in the drawing including cost and conveyance of GI pipes and fixing them in position etc, complete

-

-

-

... More
ROAD D

2

4200

2100

... More
Approach road

-

-

-

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Box Cutting for Widening Portion and as per MORTH No. 111, 112, 301, 302.

-

-

-

... More
ROAD D

53

3874

73.1

... More
Providing and Laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
ROAD D

6.76

10884

1610.12

... More
Providing and Laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

-

-

-

... More
ROAD D

19.51

34702

1778.71

... More
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg / sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502, 900

-

-

-

... More
ROAD D

100

6112

61.12

... More
Providing and applying Tack Coat over granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

-

-

-

... More
ROAD D

100

1193

11.93

... More
Providing and applying Tack Coat over existing bituminous surfaces with Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of 0.20 kg per sqm on the prepared bituminous surface as directed by the Engineer as per MORTH No. 111, 112, 503, 900

-

-

-

... More
ROAD D

110

1846

16.79

... More
Providing and laying Bituminous Macadam which work shall consist of construction, using crushed aggregates, (Table 500-10) premixed with VG 30 grade Bitumen confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for BM (Grade-II ) as per MORTH No. 111, 112, 505, 900

-

-

-

... More
ROAD D

5.01

32697

6526.42

... More
Providing and laying Bituminous Concrete which work shall consist of construction using coarse aggregates (Table 500-17) premixed with VG 30 Grade Bitumen confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for BC (Grade-II) as per MORTH No. 111, 112, 507, 900

-

-

-

... More
ROAD D

4.66

38716

8308.25

... More
Providing and laying U.S gravel including cost and conveyance of U.S gravel from approved quarry to work site including spreading watering with all leads and consolidation by power roller and all other incidental charges etc., complete as per standard specification

-

-

-

... More
ROAD D

30

11139

371.33

... More
Diversion road

-

-

-

... More
Providing and laying Carted Earth having minimum CBR of 8 with an additional lead of 10 km including conveyance, laying, watering and consolidation etc., complete as directed by the Engineer for forming the shoulders as per MORTH No.111, 112, 305, 900

-

-

-

... More
ROAD D

206.25

45583

221.01

... More
Providing and Laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

-

-

-

... More
ROAD D

24.75

44023

1778.71

... More
Upkeeping

-

-

-

... More
Upkeeping the Earthen Drain by earthwork excavation in all classes of soil except soft rock not requiring blasting and depositing with all leads and lift as per SS 20B including cost of labour, equipment and all other incidental charges etc., complete as directed by the departmental officer as per MORT&H specification 111,112,301.

-

-

-

... More
1st year

-

-

-

... More
Road-A

180

13158

73.1

... More
Road-B

450

32895

73.1

... More
Road-C

495

36184

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

202.5

14802

73.1

... More
Road-F

427.5

31250

73.1

... More
Road-G

427.5

31250

73.1

... More
2nd year

-

-

-

... More
Road-A

180

13158

73.1

... More
Road-B

450

32895

73.1

... More
Road-C

495

36184

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

202.5

14802

73.1

... More
Road-F

427.5

31250

73.1

... More
Road-G

427.5

31250

73.1

... More
3rd year

-

-

-

... More
Road-A

180

13158

73.1

... More
Road-B

450

32895

73.1

... More
Road-C

495

36184

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

202.5

14802

73.1

... More
Road-F

427.5

31250

73.1

... More
Road-G

427.5

31250

73.1

... More
4th year

-

-

-

... More
Road-A

180

13158

73.1

... More
Road-B

450

32895

73.1

... More
Road-C

495

36184

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

202.5

14802

73.1

... More
Road-F

427.5

31250

73.1

... More
Road-G

427.5

31250

73.1

... More
5th year

-

-

-

... More
Road-A

180

13158

73.1

... More
Road-B

450

32895

73.1

... More
Road-C

495

36184

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

202.5

14802

73.1

... More
Road-F

427.5

31250

73.1

... More
Road-G

427.5

31250

73.1

... More
Making up of low berms by earthwork excavation in all classes of soil and depositing with all leads and lift as per SS 20B including cost of labour, equipment and all other incidental charges etc., complete as directed by the departmental officer as per MORT&H specification 111,112,305

-

-

-

... More
1st year

-

-

-

... More
Road-A

45

3289

73.1

... More
Road-B

405

29605

73.1

... More
Road-C

270

19737

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

37.5

2741

73.1

... More
Road-F

82.5

6030

73.1

... More
Road-G

82.5

6030

73.1

... More
2nd year

-

-

-

... More
Road-A

45

3289

73.1

... More
Road-B

405

29605

73.1

... More
Road-C

270

19737

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

37.5

2741

73.1

... More
Road-F

82.5

6030

73.1

... More
Road-G

82.5

6030

73.1

... More
3rd year

-

-

-

... More
Road-A

45

3289

73.1

... More
Road-B

405

29605

73.1

... More
Road-C

270

19737

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

37.5

2741

73.1

... More
Road-F

82.5

6030

73.1

... More
Road-G

82.5

6030

73.1

... More
4th year

-

-

-

... More
Road-A

45

3289

73.1

... More
Road-B

405

29605

73.1

... More
Road-C

270

19737

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

37.5

2741

73.1

... More
Road-F

82.5

6030

73.1

... More
Road-G

82.5

6030

73.1

... More
5th year

-

-

-

... More
Road-A

45

3289

73.1

... More
Road-B

405

29605

73.1

... More
Road-C

270

19737

73.1

... More
Road-D

11.25

822

73.1

... More
Road-E

37.5

2741

73.1

... More
Road-F

82.5

6030

73.1

... More
Road-G

82.5

6030

73.1

... More
Removing the high berms in builtup area by Earthwork Excavation in all classes of soil including labour charges for removing the earth and disposing the surplus earth to near by low lying area including cost of labour, equipment and all other incidental charges etc., complete as directed by the departmental officer as per MORT&H specification 111,112,305

-

-

-

... More
1st year

-

-

-

... More
Road-A

135

9868

73.1

... More
Road-B

180

13158

73.1

... More
Road-C

540

39474

73.1

... More
Road-E

270

19737

73.1

... More
Road-F

90

6579

73.1

... More
Road-G

495

36184

73.1

... More
2nd year

-

-

-

... More
Road-A

135

9868

73.1

... More
Road-B

180

13158

73.1

... More
Road-C

540

39474

73.1

... More
Road-E

270

19737

73.1

... More
Road-F

90

6579

73.1

... More
Road-G

495

36184

73.1

... More
3rd year

-

-

-

... More
Road-A

135

9868

73.1

... More
Road-B

180

13158

73.1

... More
Road-C

540

39474

73.1

... More
Road-E

270

19737

73.1

... More
Road-F

90

6579

73.1

... More
Road-G

495

36184

73.1

... More
4th year

-

-

-

... More
Road-A

135

9868

73.1

... More
Road-B

180

13158

73.1

... More
Road-C

540

39474

73.1

... More
Road-E

270

19737

73.1

... More
Road-F

90

6579

73.1

... More
Road-G

495

36184

73.1

... More
5th year

-

-

-

... More
Road-A

135

9868

73.1

... More
Road-B

180

13158

73.1

... More
Road-C

540

39474

73.1

... More
Road-E

270

19737

73.1

... More
Road-F

90

6579

73.1

... More
Road-G

495

36184

73.1

... More
Clearing the Light Jungle including all labour charges for clearing the site etc., complete as per standard specification as directed by the departmental officer as per MORT&H specification 201.

-

-

-

... More
1st year

-

-

-

... More
Road-A

2120

8268

3.9

... More
Road-B

4040

15756

3.9

... More
Road-C

3800

14820

3.9

... More
Road-D

340

1326

3.9

... More
Road-E

1680

6552

3.9

... More
Road-F

2720

10608

3.9

... More
Road-G

3360

13104

3.9

... More
2nd year

-

-

-

... More
Road-A

2120

8268

3.9

... More
Road-B

4040

15756

3.9

... More
Road-C

3800

14820

3.9

... More
Road-D

340

1326

3.9

... More
Road-E

1680

6552

3.9

... More
Road-F

2720

10608

3.9

... More
Road-G

3360

13104

3.9

... More
3rd year

-

-

-

... More
Road-A

2120

8268

3.9

... More
Road-B

4040

15756

3.9

... More
Road-C

3800

14820

3.9

... More
Road-D

340

1326

3.9

... More
Road-E

1680

6552

3.9

... More
Road-F

2720

10608

3.9

... More
Road-G

3360

13104

3.9

... More
4th year

-

-

-

... More
Road-A

2120

8268

3.9

... More
Road-B

4040

15756

3.9

... More
Road-C

3800

14820

3.9

... More
Road-D

340

1326

3.9

... More
Road-E

1680

6552

3.9

... More
Road-F

2720

10608

3.9

... More
Road-G

3360

13104

3.9

... More
5th year

-

-

-

... More
Road-A

2120

8268

3.9

... More
Road-B

4040

15756

3.9

... More
Road-C

3800

14820

3.9

... More
Road-D

340

1326

3.9

... More
Road-E

1680

6552

3.9

... More
Road-F

2720

10608

3.9

... More
Road-G

3360

13104

3.9

... More
Clearance of Vent ways for Bridges / Culverts / Causeways by engaging JCB including cost of labour, fuel charges etc., complete for free flow of water in the vent way portion without any obstruction during rainy season as directed by the departmental officer

-

-

-

... More
1st year

-

-

-

... More
Road-A

124

86800

700

... More
Road-B

106

74200

700

... More
Road-C

56

39200

700

... More
Road-D

11

7700

700

... More
Road-E

68

47600

700

... More
Road-F

111

77700

700

... More
Road-G

76

53200

700

... More
2nd year

-

-

-

... More
Road-A

124

86800

700

... More
Road-B

106

74200

700

... More
Road-C

56

39200

700

... More
Road-D

11

7700

700

... More
Road-E

68

47600

700

... More
Road-F

111

77700

700

... More
Road-G

76

53200

700

... More
3rd year

-

-

-

... More
Road-A

124

86800

700

... More
Road-B

106

74200

700

... More
Road-C

56

39200

700

... More
Road-D

11

7700

700

... More
Road-E

68

47600

700

... More
Road-F

111

77700

700

... More
Road-G

76

53200

700

... More
4th year

-

-

-

... More
Road-A

124

86800

700

... More
Road-B

110

77000

700

... More
Road-C

60

42000

700

... More
Road-D

11

7700

700

... More
Road-E

68

47600

700

... More
Road-F

111

77700

700

... More
Road-G

60

42000

700

... More
5th year

-

-

-

... More
Road-A

124

86800

700

... More
Road-B

106

74200

700

... More
Road-C

56

39200

700

... More
Road-D

11

7700

700

... More
Road-E

68

47600

700

... More
Road-F

111

77700

700

... More
Road-G

60

42000

700

... More
Painting two coats with approved first quality readymixed enamel paint of KM, HM stones, Guard / Boundary stones, Centre median & EB Post of old plasterd surface including cost of paint, labour charges, brush and all other incidental items including lettering etc., complete as directed by the departmental officer

-

-

-

... More
1st year

-

-

-

... More
Road-A

29

4553

157

... More
Road-B

43

6751

157

... More
Road-C

43

6751

157

... More
Road-D

15.6

2449

157

... More
Road-E

22.5

3532

157

... More
Road-F

33.5

5259

157

... More
Road-G

16

2512

157

... More
2nd year

-

-

-

... More
Road-A

29

4553

157

... More
Road-B

43

6751

157

... More
Road-C

43

6751

157

... More
Road-D

15.6

2449

157

... More
Road-E

22.5

3532

157

... More
Road-F

33.5

5259

157

... More
Road-G

16

2512

157

... More
3rd year

-

-

-

... More
Road-A

29

4553

157

... More
Road-B

43

6751

157

... More
Road-C

43

6751

157

... More
Road-D

15.6

2449

157

... More
Road-E

22.5

3532

157

... More
Road-F

33.5

5259

157

... More
Road-G

16

2512

157

... More
4th year

-

-

-

... More
Road-A

29

4553

157

... More
Road-B

8.55

1342

157

... More
Road-C

8.55

1342

157

... More
Road-D

15.6

2449

157

... More
Road-E

22.5

3532

157

... More
Road-F

33.5

5259

157

... More
Road-G

20.8

3265

157

... More
5th year

-

-

-

... More
Road-A

29

4553

157

... More
Road-B

11.6

1821

157

... More
Road-C

11.6

1821

157

... More
Road-D

15.6

2449

157

... More
Road-E

22.5

3532

157

... More
Road-F

33.5

5259

157

... More
Road-G

16

2512

157

... More
Providing Tree banding White & Black band of approved first quality readymixed enamel paint including cost of paint, labour charges, brush and all other incidental items including numbering etc., complete as directed by the departmental officer

-

-

-

... More
1st year

-

-

-

... More
Road-A

61

4575

75

... More
Road-B

95.88

7191

75

... More
Road-C

94.75

7106

75

... More
Road-E

85.5

6412

75

... More
Road-F

54

4050

75

... More
Road-G

87.75

6581

75

... More
2nd year

-

-

-

... More
Road-A

61

4575

75

... More
Road-B

95.88

7191

75

... More
Road-C

94.75

7106

75

... More
Road-E

85.5

6412

75

... More
Road-F

54

4050

75

... More
Road-G

87.75

6581

75

... More
3rd year

-

-

-

... More
Road-A

61

4575

75

... More
Road-B

95.88

7191

75

... More
Road-C

94.75

7106

75

... More
Road-E

85.5

6412

75

... More
Road-F

54

4050

75

... More
Road-G

87.75

6581

75

... More
4th year

-

-

-

... More
Road-A

61

4575

75

... More
Road-B

95.88

7191

75

... More
Road-C

94.75

7106

75

... More
Road-E

85.5

6412

75

... More
Road-F

54

4050

75

... More
Road-G

101.25

7593

75

... More
5th year

-

-

-

... More
Road-A

61

4575

75

... More
Road-B

95.88

7191

75

... More
Road-C

94.75

7106

75

... More
Road-E

85.5

6412

75

... More
Road-F

54

4050

75

... More
Road-G

101.25

7593

75

... More
Replacement R.C.C. M15 grade precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc., complete. (as per MORT&H specification No.804)

-

-

-

... More
1st year

-

-

-

... More
Road-A

1

256

256

... More
Road-B

2

512

256

... More
Road-C

2

512

256

... More
2nd year

-

-

-

... More
Road-A

1

256

256

... More
Road-B

2

512

256

... More
Road-C

2

512

256

... More
3rd year

-

-

-

... More
Road-B

1

256

256

... More
Road-C

2

512

256

... More
Road-E

2

512

256

... More
4th year

-

-

-

... More
Road-A

1

256

256

... More
Road-B

2

512

256

... More
Road-C

2

512

256

... More
5th year

-

-

-

... More
Road-A

1

256

256

... More
Road-B

2

512

256

... More
Road-C

2

512

256

... More
Painting two coats with approved first quality readymixed enamel paint of parapet of Culvert and Bridge of old plasterd surface including cost of paint, labour charges, brush and all other incidental items including lettering etc., complete as directed by the departmental officer

-

-

-

... More
1st year

-

-

-

... More
Road-A

120

18840

157

... More
Road-B

30

4710

157

... More
Road-C

30

4710

157

... More
Road-E

18

2826

157

... More
Road-F

63.36

9947

157

... More
Road-G

14.4

2260

157

... More
2nd year

-

-

-

... More
Road-A

120

18840

157

... More
Road-B

30

4710

157

... More
Road-C

30

4710

157

... More
Road-E

18

2826

157

... More
Road-F

63.36

9947

157

... More
Road-G

14.4

2260

157

... More
3rd year

-

-

-

... More
Road-A

120

18840

157

... More
Road-B

30

4710

157

... More
Road-C

30

4710

157

... More
Road-E

18

2826

157

... More
Road-F

63.36

9947

157

... More
Road-G

14.4

2260

157

... More
4th year

-

-

-

... More
Road-A

120

18840

157

... More
Road-B

14.34

2251

157

... More
Road-C

14.34

2251

157

... More
Road-E

18

2826

157

... More
Road-F

63.36

9947

157

... More
Road-G

14.4

2260

157

... More
5th year

-

-

-

... More
Road-A

120

18840

157

... More
Road-B

14.34

2251

157

... More
Road-C

14.34

2251

157

... More
Road-E

18

2826

157

... More
Road-F

63.36

9947

157

... More
Road-G

14.4

2260

157

... More
Providing and applying Tack Coat over existing bituminous surfaces with Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of 0.20 kg per sqm on the prepared bituminous surface as directed by the Engineer as per MORTH No. 111, 112, 503, 900 (4th and 5th Year only)

-

-

-

... More
4th year

-

-

-

... More
Road-A

336

5644

16.8

... More
Road-B

528

8865

16.79

... More
Road-C

495

8311

16.79

... More
Road-E

157.5

2644

16.79

... More
Road-F

945

15866

16.79

... More
Road-G

315

5288

16.79

... More
5th year

-

-

-

... More
Road-A

560

9408

16.8

... More
Road-B

880

14775

16.79

... More
Road-C

825

13851

16.79

... More
Road-E

262.5

4407

16.79

... More
Road-F

1575

26444

16.79

... More
Road-G

525

8814

16.79

... More
Providing and laying Bituminous Concrete which work shall consist of construction using coarse aggregates (Table 500-17) premixed with VG 30 Grade Bitumen confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporting the mix to the worksite, laying with paver finisher and compaction with smooth wheeled and vibratory roller in accordance with the requirements of the specification and in conformity with the drawing as directed by the Engineer for BC (Grade-II) as per MORTH No. 111, 112, 507, 900 for upkeeping (4th and 5th Year only)

-

-

-

... More
4th year

-

-

-

... More
Road-A

10.08

83619

8295.55

... More
Road-B

15.84

133190

8408.5

... More
Road-C

14.85

127287

8571.53

... More
Road-E

4.73

39296

8308

... More
Road-F

28.35

239594

8451.3

... More
Road-G

9.45

78482

8304.98

... More
5th year

-

-

-

... More
Road-A

16.8

139365

8295.55

... More
Road-B

26.4

221984

8408.5

... More
Road-C

24.75

212145

8571.53

... More
Road-E

7.88

65467

8308

... More
Road-F

47.25

399323

8451.3

... More
Road-G

15.75

130803

8304.98

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

66071157

... More
Add GST at 12%

1

-

7928539

... More
Total Value put to Tender

1

-

73999696

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

66071157

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.