Orissa State Seeds Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Orissa State Seeds Corporation Limited - OSSCL Tender

Civil And Construction
Civil Works Others
Eprocure

Opening Date

19 Feb 2022

Closing Date

28 Feb 2022

Tender Amount

₹ 37,83,450 
Notes
Download

Costs

Summary

Construction Of Godown At Dhenkanal

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC work with M25 Grade concrete with 20mm and down graded crusher broken chips having a minimum crushing strength in work test (150 kg/ sqcm) in 15 cm cubes after 28 days curing after mixing and test conducted in accordance with IS-456 and IS-516 including hoisting, lowering, laying concrete, compacting by using vibrators, centring and shuttering and finishing the exposed surface smooth, providing proves and beads wherever necessary with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

-

-

-

... More
In column footing

13.01

-

5768.14

... More
In column

15.49

-

5768.14

... More
In plinth beam

11.32

-

5768.14

... More
In tie beam

5.34

-

5768.14

... More
In slant of Gabble wall

1.17

-

5768.14

... More
Cutting, straightening, coiled or bend up MS rod or Tor steel, bending binding, cranking, hooking, welding or jointing if necessary and tying the grills and placing in position for RCC work in all floors and for proving fan hooks, hoisting lowering, laying for concrete with cost of reinforcement, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (payment will be made on weigh of steel only basing on the coefficient of MS or Tor steel bar approved by competent authority and no separate payment will be made for cost of binding wires)

48.75

-

8039.62

... More
Fly Ash Brick masonary in (1.6) cm in foundation and plinth in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in foundation and plinth)

29.89

-

4791.32

... More
Fly Ash masonary in (1.6) cm in superstructure in ncluding scaffolding, watering, curing etc required for the work with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge. (in super strucure)

92.71

-

4824.32

... More
16mm thick cement plaster (1:6) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

374.79

-

200.7

... More
12mm thick cement plaster (1:4) in all floors finishing smooth to brick walls after racking out joints etc, including watering, with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

467.82

-

159.94

... More
Supply of all materials, fabricating NS GRILLS as per direction & Fixing the same in position after cutting of brick work as required fixing the grills with concrete and making the suface good after fixing of MS grills

470.4

-

99.03

... More
Supply of all materials for fabrication of MS windows with doube openble leafs made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

312

-

99.03

... More
Supply of all materials for fabrication of ventilators with louvered leafs made out of GI sheet and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

352

-

99.03

... More
Cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

842.61

-

14.77

... More
Painting wall with two coats of cement paint with approved shade over a coat of cement wash including watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

467.82

-

36.17

... More
Painting of primer coats on new surfaces including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge

374.79

-

59.06

... More
Wall painting 2 coats with Weathercoat paint of approved shade on new work to give an even shade including cost of paint and T&P and cost of all other materials such as scafolding, ropes etc and completing the work as per direction of engineer in charge

374.79

-

73.42

... More
Supplying and on site assembling and erecting trusses of approved design for main godown and cantilever trusses in platform side only. This includes erection of trusses, purlins, BTR and false rafters, sleeves and placing of wind bracing etc with nuts and bolts with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

7.65

-

108592

... More
Supply and fixing of Colour Coated Profile sheet 0.50 TCT in roof incuding fixisng of ridges and windties excluding cost wind-ties but including the cost of J hooks with cost, conveyance, taxes & royalties of all material and cost of all labour T&P required for the work etc., complete as directed by Engineer in charge

426.61

-

910.74

... More
Supply and fixing of windties after drilling of holes as required and as directed by engineer in charge including all labour, material for hoisting and tying and completing the work in all respect

2.43

-

5227

... More
Supply of all materials for fabrication of Rolling Shutters made out of iron member and iron sheets of required specifications as directed and fixing the same to required place as directed including executing all items of works for fixing the same and completing the work as per direction of engineer-in-charge .

14.87

-

4000

... More
Supply of all material and labour for the work Centring and shuttering for RCC Works and finishing the work in all respect as per direction of engineer-in-charge

-

-

-

... More
Column footing

34.83

-

110.81

... More
Column

152.1

-

729.23

... More
Plinth beam

81.29

-

110.81

... More
Lintel

45.63

-

275.09

... More
In slant of Gabble wall

9.29

-

275.09

... More
Painting of two coats with approved quality eanamel paint over iron work including cost of scafolding etc and completing the work in all respect as per direction of engineer in charge

362.83

-

139.53

... More
CC (1:2:4) in flooring using 12mm size hard crusher broken granite chips including hoisting, lowering, laying concrete, providing and watering with cost, conveyance, taxes & royalties of all material and cost of all labour T & P required for the work etc., complete as directed by Engineer in charge.

33.56

-

6380.42

... More
Providing and laying of water proof hessian based bitumeenous felt after application of one layer of bitumen 60/70over surface and then applying one layer of bitumen 60/70 as flushing layer and completing the work in all respect

55.76

-

382.61



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.