Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Indian Oil Corporation Limited - IOCL Tender

Works
Eprocure

Opening Date

22 Oct 2019

Closing Date

19 Nov 2019

Tender Amount

₹ 17,28,64,283 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Techno Commercial Volume of Tender Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
30" dia

4796

-

6696.67

... More
LAYING PIPELINE IN WATERLOGGED AREA

-

-

-

... More
Laying pre-coated pipes in Marshy areas without concrete sheathing including providing all equipment, works,labour, inputs and materials/consumable necessary to perform and complete the work in all respects, submission of construction procedure for Owner's approval, arranging the required additional land for construction purpose, preparation of site including dewatering, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydrotesting testing and replacement of pipes/ defects, excavation of the trench to required depth in all kinds of soil and conditions including rock trenching and maintenance of trench in all kinds of soil including rocky strata, if any, and laying of the pipeline in approved trench, backfilling and final clean-up, stabilisation of the excavated banks, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things necessary to complete the work in all respects according to the contract.

-

-

-

... More
30" dia

528

-

10177.47

... More
PIPELINE MARKERS

-

-

-

... More
Supply of all materials necessary for fabrication and installation of kilometre posts, direction markers and warning signs at the locations as per specifications, excavating & grouting in cement concrete 1:3:6, and all other works necessary for fabrication & installation of the markers including cleaning, priming & applying two coats of coal tar based epoxy paint on underground portions, supply and application of one coat of primer and two coats of epoxy paint of approved colour and quality on overground portion, stencil letter cutting for number, direction, chainage etc. and restoration of site to original condition and all other acts, deeds, matters and things and work, labour, inputs and materials/ consumables necessary to perform and complete the work in all respects as per approved drawing & specifications and as per direction of Site Engineer / Engineer-in-Charge.

-

-

-

... More
KILOMETER POST

8

-

7115.208952614094

... More
DIRECTION MARKER

24

-

6895.474558489247

... More
WARNING SIGN

8

-

8245.27155097045

... More
BOUNDARY PILLAR

-

-

-

... More
Providing and installing RCC (1:1.5:3) boundary pillars as per drawings on both edges of the ROW at 250 metres interval and at every turning point and/or as directed, including supply of all materials necessary for the fabrication of the pillars, casting and inscribing the pillars, excavation of earth, fixing the pillars & backfilling, applying two coats of oil paint over one coat of cement based primer on exposed surface and work, labour, inputs & materials/ consumables necessary to perform and complete the work in all respect under the contract and as per directions of Site Engineer.

64

-

1569.53138660605

... More
AIR DRYING (OPTIONAL)

-

-

-

... More
Carrying out air drying of the pipeline system as per specification and direction of Engineer-in-Charge including supply of all labour, materials, equipments, instruments, pigs, barrels etc. complete in all respects.

8

-

174134.27557265258

... More
NITROGEN PURGING & OIL EVACUATION (OPTIONAL)

-

-

-

... More
Fixing of temporary header / facility at both ends of the old/new pipeline section, inserting the bi-di pig and carrying out product evacuation by nitrogen purging, as per specification and direction of Engineer-in-Charge including supply of all labour, materials, equipments, instruments, pigs, barrels etc. Complete in all respects.

8000

-

1343.5

... More
ELECTRONIC GEOMETRY PIGGING (EGP) / CALLIPER SURVEY (INCLUDING MAGNETIC PIGGING)

-

-

-

... More
Mobilisation/ demobilisation of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, pig tracking device, preparation and cleaning of the complete mainline / Mainline sections including HDD sections under this tender (but excluding HDD crossings not included under the scope of this tender and to be executed by separate agency) by running series of pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, including pig tracking at 5 to 10 km interval, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, including rectification of defects observed from calliper survey, including supply of all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete for ascertaining the geometry of the pipeline.

8

-

63806.68

... More
PRESERVATION OF PIPELINE WITH INHIBITED WATER (OTIONAL)

-

-

-

... More
Preservation of entire pipeline / pipeline sections (including HDD sections) by using inhibited water with uniform inhibitor concentration adequate for 6 (six) months preservation period as per manufacturer's recommendation including arranging water, testing of water, supply of inhibitor, all equipment, manpower, consumables etc. complete as per specifications and direction of Site Engineer / Engineer-in-Charge.

8

-

21973.44

... More
TIEING-IN AND HOOK-UP WITH HDD SECTIONS (OPTIONAL)

-

-

-

... More
Carrying out tieing-in and hook-up with the HDD sections/ existing mainline section of pipeline on either side of the HDD pipe section, including excavation/ trenching in all kinds of soil including rock, cutting of pipe, making field bends out of pre-tested pipes to match the site requirement, welding, carrying out 100% radiography, field joint coating, holiday detection, repair of damaged coating, backfilling and making through the pipeline etc. complete in all respects

2

-

554232.9232383284

... More
FABRICATION OF HOT PULL INDUCTION BENDS

-

-

-

... More
Taking delivery and transportation of bare pipes from owner's stockpile, transportation, unloading the pipes at manufacturer's works and fabrication of Long Radius (R=6D) Hot pulled induction bends having tangent length of approximately 1000m at both ends as per specification and delivery of hot pulled bends to site including visual examination, manual U.T. on the entire weld seam, bevelling of ends as per API 5L, supply of all materials, consumables, labour etc. as per specifications and direction of Site Engineer / Engineer-in-Charge.

20

-

338390.9669522644

... More
PIPE RETRIEVAL

-

-

-

... More
Retrieval of cross country mild steel pipeline section by excavation up to bottom level of pipe which is normally at 1.5 to 2.5 m depth, by cutting at every 10 to 12 meters by suitable safe method as approved by EIC / Site Engineer (pipe to be cut near to old girth weld of pipe and at some places cutting may be required at lesser length as per site requirement), removal of pipes from trench, loading, unloading and transportation to owner's installation with all labours, vehicles, tools and tackles, equipment as directed by EIC / Site Engineer including backfilling of excavated trench with excavated earth along with additional appropriate quantity of soil (to be arranged by the contractor at his own cost) after removal of pipe, compacting the backfilled earth and restoring to original level and condition. This is inclusive of required de-watering, shuttering, blindinf at some area with owner supplied plates, welding of the same, transportation of the owner supplied to material, etc.

3000

-

1978.8

... More
SUPPLY & FILLING OF EARTH (OPTIONAL)

-

-

-

... More
Supplying & filling selected earth/ moorum (excluding black cotton soil) from Contractor's own borrow areas including royalty, with all leads and lifts at various location at all depths including watering, compacting in layers not exceeding 20cm thickness, complete in all respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specifications and direction of the Engineer-in-Charge.

8400

-

434.88

... More
SUPPLY & INSTALLATION OF RISER PIPE

-

-

-

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval including the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer including cost of all labour, tools, materials complete in all respects.

50

-

1229.25

... More
SUPPLY & INSTALLATION OF TYPE-A TLP

-

-

-

... More
Supply and installation of vandal proof test lead point (TLPs) at location or as per direction of site engineer including supply of proper size of lug, washer & brass nut bolt, Bakelite insulation plate, 2 inch dia GI pipe (B class, lSI marked) of 1.5 mtr length threaded at one end tofit the vandal proof TLP Box & other end with bend pipe connection witha piece of GI pipe taking out from foundation for cable entries.Necessary 6 Sq.mm multi strand PVC insulated flexible single core copperconductor cable for lead wires and all other materials required forerecting the test lead point over concrete foundation (TLP grouting)with cement concrete mixture 1:2:4 (Cement:Sand: Grit of 20mm nominalsize), making cable connection to the pipe with necessary excavation,removing I"" x 1"" size of existing coating material on pipe surface,cleaning with wire brush and making the surface free of dust, surfacepreparation by acid wiping, soldering 1"" length of Cui Al strands onexposed pipe surface, filling the exposed pipe and cable portion withliquid araldite (mixed with hardner), & terminating the cable on Bakelite insulating bolt with copper lugs, brass nuts /bolts, washer lugsinside the test lead box enrooting the cable through inside of the TLPbox pipe , including removal of coat & wrap of dimension 75mm X 75mm , repairing the damaged to coat & wrap etc. and painting with one coat ofRed Oxide zinc chromate primer and two coats of approved brand ofsynthetic enamel paint on the test lead box and GI pipe, complete inevery respect as per drawing, specifications and instructions of SiteEngineer inclusive of the cost of all labour, materials etc.

9

-

13184.743293692556

... More
SUPPLY & INSTALLATION OF MAGNESIUM ANODE

-

-

-

... More
Magnesium Anode : Supply, Installation , testing and commisioning of Magnesium anode (minimum 7.6 Kg each) including its tail cable of size of 1c x 6 sq.mm. XLPE/ PVC insulated stranded copper cable of total length 10 meter including PVC cap, special back-fill material ( filled in cotton sack) with sealing compound complete in all respect including its excavations, back filling etc. as per specifications and drawings. The work complete in all respect shall include supply of all labour , tools etc. and shall be carried out as per the directions of the EIC/ Site Engineer and as per AFC drawings.

28

-

9746

... More
LAYING PIPELINE IN MARSHY AREA

-

-

-

... More
Laying pre-coated pipes in Marshy areas with concrete sheathing including providing all equipment, works,labour, inputs and materials/consumable necessary to perform and complete the work in all respects, submission of construction procedure for Owner's approval, arranging the required additional land for construction purpose, preparation of site including dewatering, aligning, bending, lining up and welding the pipe, 100% radiographic inspection of weld joints, coating of field weld joints, holiday detection and repair of coating, hydrotesting testing and replacement of pipes/ defects, excavation of the trench to required depth in all kinds of soil and conditions including rock trenching and maintenance of trench in all kinds of soil including rocky strata, if any, and laying of the pipeline in approved trench, backfilling and final clean-up, stabilisation of the excavated banks, disposal of waste and surplus in accordance with the contract, and supply of materials (other than those specifically undertaken to be supplied by the Owner under the contract) necessary for or in the performance of the work or for temporary or permanent incorporation in the works and all other acts, matters and things necessary to complete the work in all respects according to the contract.

106

-

23668.533310019237

... More
CONCRETE SHEATHING

-

-

-

... More
Providing & Laying Concrete sheathing on the carrier pipe i.e., continuous concrete coating (mix 1:1.5:3) of 50 mm thick using specified (approved) wire mesh reinforcement as per approved drawing and technical specifications, including supply of cement, steel wire mesh, aggregate, sand, shuttering and all other materials, consumables, inputs, equipment for concrete sheathing required to complete the job, testing of concrete coated pipes etc. and as per direction of Engineer-in-Charge.

106

-

8015.07361426823

... More
REMOVAL & APPLICATION OF COATING FOR 30" PIPELINE

-

-

-

... More
Excavation up to bottom level of pipe which is normally at 1.5 to 3 m depth for lengths upto 30m, removing the coating, creating access for carrying out hot-tapping operation, applying the coating again after completion of Hot-Tapping Works and backfilling the excavated trench with excavated earth along with additional appropriate quantity of soil (to be arranged by the contractor), compacting the backfilled earth and restoring to original level and condition with all labours,materials, tools and tackles, equipments etc. as directed by EIC / Site Engineer. Coating as per the direction of EiC to be provided by the contractor.

2

-

587912.9473461

... More
REMOVAL OF OIL FROM PITS

-

-

-

... More
Collecting Oil/Oil-Water Mix: Collecting any oil and/or oil water mix accumulated in the pit after evacuation of product from the old pipeline section & transporting the same in oil tankers to the nearest IOCL installation Paradip/Balasore without any spillage, complete in all respect & as per the directions of EIC / Site Engineer.

2

-

187465.598799465

... More
COATING OF UNDERGROUND PIPING

-

-

-

... More
Coating of under ground piping: Removal of coating/paint (if required), cleaning exposed steel surfaces of piping, equipment and valves etc. by sand blasting or with power wire brush (wherever sand blast cleaning is not possible) free of dust, grease, mill scales etc. and applying single layer polyurethane coating(PU) using 100% solvent free elastomeric plyurethane or 100% solvent free epoxy paint similar to R-95 with approved materials, labour, equipment etc. and completing the job in all respects as per specification and instructions of the Site Engineer / EIC.

100

-

1871.4

... More
DAC TLP

-

-

-

... More
The job at each TLP of type DAC/DMV for protection from AC interference or for protection at Valve locations shall include supply, installation, testing and commissioning of the following; A. TLP type DAC/ DMV fabricated of MS Sheet (Thickness : 3 mm top/side/rear/front & 5 mm : Bottom plates) with hinged front door, Heavy Gauge MS pipe 100 mm nominal diameter, Phenolic laminated terminal plate, brass terminal stud bolts, neoprene gasket for front door, vandal proof concealed lock, etc as per latest revision of 9200-99900-404-601-02 (STD-481) and Standard AFC drawing 9200-99900-404-603-00 : (STD-483). The work includes excavation and providing requisite concrete foundation of 600 mm x 600 mm x 800 mm at site, including MS hard pipe for cable entry through foundation, erection of the TLP over concrete foundation, termination of cables to the brass terminal stud bolts inside TLP box, jointing the cables to pipe (using cad welding/ pin brazing technique), repairing the damage to pipe coating (with coating repair etc.), backfilling the cable trenches, clearing and cleaning the site, applying epoxy paint / powder coating etc. The work also includes supply, installation, laying & termination of all XLPE, Cu cable required for the job (as per site conditions) and including lugs etc. The work includes supply and fixing of a non-corrosive name plate containing the details like KM location, identification, TLP No., direction of flow, connection scheme, type etc., on the front side of the TLP box, etc. The name plate shall also include the details of corrosion coupon wherever installed, all as per the direction and specification detailed in the document complete with tools, tackles & other necessary requirement. DAC/DMV type TLP shall house solid state decoupling device and Zinc anodes shall be used for grounding as detailed below. B. Zinc anodes (minimum 10 Kg each) including its tail cable of size of 1c x 25 sq.mm. XLPE/ PVC insulated stranded copper cable of total length 10 meter for each anode including PVC cap, special back-fill material ( filled in cotton sack) with sealing compound complete in all respect including its excavations, back filling etc. as per specifications and drawings. Number of zinc anodes shall be such that earth resistance value of up to 5 Ohm is obtained. Zinc anodes shall be connected to the TLP through weather proof junction box/ boxes. C. Solid State Diode Decoupling Device of approved make including required length of cable as per specifications for protection of MOVs and at HT line crossing locations of voltage level 66 KV or above including terminating the cables in the TLP box with cable lugs, sealing material, laying of cable, etc. The job shall be complete in all respects including all required materials, tools, consumables, labour as per work specifications, engineering document & direction of the Site Engineer/Engineer-In-Charge. Connection scheme for the above mentioned item shall be as per latest revision of standard drawing (drawing shall be provided during work execution).

2

-

109838.18392556981

... More
HDD (Carrier Pipe with OFC conduit)

-

-

-

... More
Design, detailed engineering & installation of pipeline / pipeline & OFC conduit across rivers, NH, SH, Expressways, Railways, etc by HDD method. -Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. -Interpretation of data of hydrological / carrying out fresh topographic survey & geo-technical survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. -Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. -Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. -Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling. -Pre-construction surveys and collection of all necessary data.

-

-

-

... More
String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc. -Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. -Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. "-Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC. HDPE pipe shall be supplied by contractor. (wherever OFC has to be laid along with the carrier pipeline)." "-Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline)." -Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. -Installation of the pipeline / pipeline and OFC conduit as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. -Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). -Carrying out post-installation coating survey as per approved procedure. -Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. -Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner. -Preparation of as-built drawings and other records etc. -Laying of the 40 mm OD HDPE conduit inside 89 mm OD steel conduit. All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works.

-

-

-

... More
HDD of 30" Pipe across railway lines

363

-

51657.187224741465

... More
HDD of 30" Pipe across main road of Paradip Refinery

561

-

64571.48403092683

... More
ELECTRONIC GEOMETRY PIGGING (EGP) / CALLIPER SURVEY

-

-

-

... More
Carrying out Calliper survey for ascertaining the internal geometry of the installed pipeline sections including mobilization/ demobilization of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, preparation and cleaning of the pipeline sections by running series of foam pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, rectification of defects observed from calliper survey (if HDD is executed by the same contractor), including supply of all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete as per specifications and directions of Site Engineer / Engineer-in-Charge.

2

-

847344.5065735818

... More
SERVICES

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable straps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers, end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspection of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after laying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engineer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-charge/ Site Engineer.

7

-

18089.401237906095

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (ROW), pre laying testing of each cable drum for each fibre and taking the OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer, blowing of OFC through contractor laid HDPE, jointing / splicing of OFC, post installation testing of OFC for each fibre for each drum laid & taking OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

7

-

29786.311497282353

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer.

8

-

9828.378806039489

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Electronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

8

-

735.2363987524305

... More
Installation of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer.

8

-

1219.1340592177687

... More
Installation of OFC Joint pit markers at every joint location as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer.

8

-

1140.5125338607845

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer.

8

-

2788.2881017371287

... More
Installation of Transition Pits at building entry points as per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer.

1

-

7448.97767350626

... More
Installation of wall mounted Fibre Termination Box (FMS) as per tender specifications and directions of Engineer-in-charge/ Site Engineer.

1

-

6917.146131223056

... More
Conducting " Coating-Resistance Survey" for calculation of effective coating resistance of the pipeline in ohms-sq.m. along the entire pipeline and plotting on SEMILOG or X-Y GRAPH & submitting the report in graphical form as well as soft copy as per Specification / approved procedure and directions of Site Engineer / Engineer-in-Charge.

7

-

1592.2630175438594

... More
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.

7

-

3930.164070175438

... More
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation & repair of the same by required coating material. All service & material in scope of contractor.

7

-

4569.48196491228

... More
TCP System Engineering Document : Prepare & Submit Engineering Document including detail engineering & drawings for TCP system and other documentations as mentioned in the specification and as per direction of Site Engineer / Engineer-in-Charge. The work includes submission of final document afterapproval in requisite sets.

1

-

115015.041122807

... More
Taking delivery from Owner's Store, loading, transportation and unloading of Owner supplied 1 drum (4 KM) unarmoured Optical fibre cable (OFC) to respective HDD crossing locations, pre laying testing of the cable drum for each fibre and maintaining the OTDR traces.

2

-

22545.631080139374

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer.

924

-

71.1605574912892

... More
Installation of RCC Transition pit/ Joint pit at HDD crossings as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer.

4

-

6116.857142857143

... More
Installation of pit marker at RCC Transition pit/ Joint pit location as per drawings, specifications and direction of Engineer-in-charge/ Site Engineer.

4

-

3603.302857142857

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable straps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers, end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspection of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after laying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engineer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-charge/ Site Engineer.

0.3

-

18089.401237906095

... More
SUPPLY

-

-

-

... More
Supply of 40 mm OD HDPE pipe as per tender specifications.

7

-

56947.87499408461

... More
Supply of OFC Jointing kits as per tender specifications

8

-

7191.828924743709

... More
Supply of Electronic Marker Locator cum Cable/ Pipe Locator, Fault Locator as per tender specifications.

1

-

237826.88612068963

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications.

8

-

1841.3002145486244

... More
Supply of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications.

8

-

2207.369181422452

... More
Supply of Joint pit markers for OFC joint locations as per tender specifications.

8

-

2909.908757210915

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications.

8

-

10395.986701185731

... More
Supply of RCC Transition pits for building entry points as per tender specifications.

1

-

10617.042956896552

... More
Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications.

1

-

12441.402589129162

... More
Supply of 40 mm OD HDPE pipe as per tender specifications (Optional)

924

-

84.22254310344826

... More
Supply of RCC Transition Pit with lid as per tender specifications and drawings.

4

-

13107.461896551724

... More
Supply of 89 mm OD, Schedule 80, API 5L Grade-B/ ASTM A106 Gr.B MS pipe for Optical Fibre Cable conduit as per tender specifications. (Optional)

924

-

1463.1742241379309

... More
Supply of pit markers at RCC Transition pit/ Joint pit location as per tender specifications /drawings.

4

-

4692.11



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.