Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
South East Central Railway - SECR Tender
Ireps
Opening Date
10 Jul 2019Closing Date
31 Jul 2019Tender Amount
₹ 3,70,68,351Costs
EMD
₹ 3,35,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Provision Of 3.00 Meter Wide Foot Over Bridge At Jatkanhar Station.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2848584Tender No
E-21-NGP-2019-20Tender Authority
South East Central Railway ViewPurchaser Address
-Website
http://www.secr.indianrailways.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying in position M 20 Grade concrete for reinforced concrete structural 4 elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge All work upto plinth level, including raft foundation of washable aprons, HS tank, pile cap, footings of FOB, and Platform shelter etc.
562.63
1974
1177692.96
Providing and laying in position M 20 Grade concrete for reinforced concrete structural 5 elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge All work in buildings above plinth level upto floor two level.
433.88
2185
1005079.64
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, raft foundation of washable aprons, Pile caps, Footings of FOB etc. 042016 1743.75 Sqm 229.40 400016.25 6.00 424017.23
2120.13
120
271253.67
Providing, hoisting and fixing in position upto floor two level M20 Grade precast RCC work including setting in cement mortar 1:3 (1 cement : 3 coarse sand) and finishing smooth with 6mm thick cement 8 plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete including cost of centering, shuttering, finishing, Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability, excluding cost of cement and steel reinforcement, as per approved plan & direction of Engineer incharge. In slabs for drain covers, manhole covers, flue tops etc.
73.75
2485
194333.67
Providing corrugated G.S. sheet roofing, including vertical/curved surface, fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpet 9 washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 0.80mm thick with zinc coating not less than 275gm/ sqm
1468.13
680
1059519.77
Providing ridges or hips of width 60cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8mm dia. G.I. limpet and bitumen washers complete 0.80mm thick with zinc coating not less than 275gm/ sqm
267.13
427
121055.63
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50mm +/- 5% 11 total coated thickness (TCT) thick Zinc coating 120 gsm as per IS:277 in 240mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws or with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers complete : Gutter (600mm over all girth)
20.25
570
12239.13
Precast Chequered factory made terrazzo tiles 22mm thick/ with graded marble chips size 12 upto 6mm in floors jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing of cement slurry complete on 20mm thick bed of cement mortar 1:4 (1cement : 4Coarse sand) With ordinary cement with pigment
2322.5
534
1316621.99
Brick work with non-modular (FPS) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 fine sand) 111012 61.88 Sqm 60.32 3732.60 6.00 3956.56
5.75
2083
12700.09
12 mm cement plaster of mix - 1:6 (1cement: 6fine sand)
61.88
60
3956.56
Providing and fixing 110mm dia PVC soil, waste and vent pipes including jointing and cost of spun yarn and sand etc. complete
26.88
238
6800.95
Painting with aluminium paint of approved brand and manufacture to give an even shade Two or more coats on new work
8105
40
349751.82
Supply and using cement at worksite : OPC 53 grade
160
6173
958080.64
Supplying Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars
21287.5
52
1195369.76
Providing and fixing M.S. round holding down bolts with nuts and washer plates complete
2075
75
164337.61
Structural steel work welded in built up sections, trusses and framed work, girders, stagings, racks, etc including cutting, bending, straightening, hoisting, fixing in position, including applying a priming coat of approved steel primer, complete - upto 6m height above GL In RSJ, tees, angles and channels
92100
81
7935506.39
Structural steel work welded in built up sections, trusses and framed work, girders, stagings, racks, etc including cutting, bending, straightening, hoisting, fixing in position, including applying a priming coat of approved steel primer, complete - upto 6m height above GL In flats, plates , round or square bars
175695
79
14680371.42
Steel work in built up tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete Hot finished welded type tubes 081370 675.00 Kg 88.62 59818.50 5.50 63108.52
28962.5
81
2474990.44
Providing and fixing bolts including nuts and washers complete
675
88
63108.52
Providing and fixing expanded metal 20X60mm strands 3.25mm wide and 1.6mm thick on angle iron flat iron frames including all incidental work complete. Cost of frames to be paid separately under relevant item
90
393
37358.08
Delaunching/Launching of FOB girder by road crance with appropriate crane capacity. The 1 rate includes all type machinery, equipments, lbours, lead, lift, taxes etc. complete. Work will be done as per instruction of Engineer-in-charge. Work will be done as per availability of traffic block. Railway will not e responsible for idling of men and machinery. Work has to be done in short notice of 7 days in advance.
68.25
20000
1365000
Metalizing of steel work of girder with grit/sand blasting as per IRS B1-2001 following by one coat of each primer (a per IS-5666) one coat of zinc chrome primer as per IS:104) and two coats of aluminum paint (as per IS:2339) with all labour, T&P and materials as a complete job.
2875
640
1842587.5