Public Works Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Public Works Department - PWD Tender

Eprocure

Opening Date

6 Sep 2018

Closing Date

Cancelled

Tender Amount

₹ 5,56,21,248 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No 3:-Spreading hard murum for side width etc. complete

3000

-

-

... More
Item No 4:-Compact ing the hard murum side widths including laying in layers on each side wi th power roller including ar t i ficial water ing etc. complete.

20000

-

-

... More
Item No 5:-Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stPer onelayers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of bitumen VG-10 at the rate of 0.30 Kg Sqm.(on existing bitumen surface.)

63000

-

-

... More
Item No 6:-Providing and applying tack coat on the prepared sur face heat ing by fames in Boi ler and spraying bi tumen set footed in bi tumen boller on B.T. sur face 2.5 kg/ 10 sqm.VG-30 bulk bi tumen

126000

-

-

... More
Item No 7:-BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 2, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface ,finished to the required grade ,level, alignment, and rolling to achieve the desired density for 50/75 mm compacted thickness with -- Using drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27-2009 specified conditions and attachments such as electronic load sensor based belt conveyers, automatic synchronization of bitumen and aggregate fedder, built in dust controller system and PLC for Drum Mix plant, Sensor paver and Vibratory roller excluding prime/Tack coat etc.complete --Bitumen VG-30 grade 3.40%

3150

-

-

... More
Item No 8:-BITUMINOUS CONCRETE:--Providing and laying bituminous concrete using crushed aggregate of grading 2, premixed with bituminous binder @5.4% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade ,level, alignment, and rolling to achieve the desired density for 30/40 mm compacted thickness with drum mix plant with SCADA, Sensor paver and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen VG-30 grade with stPer onedust filler

1575

-

-

... More
Item No 9:-Excavation for foundation in earth, soils of all types, sand, gravel, soft murum , hard murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete.

972.32

-

-

... More
Item No 10:-Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand)

253.65

-

-

... More
Item No 11:-Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with Natural / VSI standard Artificial Sand, cement 4.05 bags/cumt)

2420.6

-

-

... More
Item No 12:-Providing and laying of filter media with granular materials/ stPer onecrushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition as per drawing and technical specifications etc. complete.

638.4

-

-

... More
Item No 13:-Providing weep holes in brick masonry /plain /reinforced concrete abutment, wing wall / return wall with 100mm diameter AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face as per drawings and technical specifications etc. complete.

342

-

-

... More
Item No 14:-Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete.

196.2

-

-

... More
Item No 15:-Providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and compacting etc. complete.

117.65

-

-

... More
Item No 16:-Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand)

29.42

-

-

... More
Item No 17:- Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.

150

-

-

... More
Item No 18:- Re-embercement of Royalty charges to the contractor after producing original transport challans.

5640.99

-

-

... More
Item No 19:- Carrying out following tests with a frequency in Government P.W.D. laboratory as per relevant standards and submitting test results and retesting if required including all taxes, overhead and any other allied charges etc. complete. A)BASIC TEST OF AGGREGATE. i)To carrying out W.A.,Sp. Gravity,Impact value on metal with a frequency in approved laboratory and submitting test results.

40

-

-

... More
ii)Job Mix Design with all Tests on aggregate ( Excluding bitumen ) for DBM/SDBC/Ac

1

-

-

... More
iii)To carrying out BASIC TEST OF AGGREGATE. 2 Water Absorption, Specific Gravity,lmpact Value ICrushing Value. 1 Test in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes, overhead and any other allied charges etc. complete.

10

-

-

... More
B)FINE AGGREGATES. i)To carrying out FINE AGGREGA TES.Fineness Modulus ( Sieve Analysis ),Silt & Clay Content in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes, overhead and any other allied charges etc. complete.

12

-

-

... More
ii)To carrying out Chloride & Sulphate Content. in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes, overhead and any other allied charges etc. complete.

20

-

-

... More
C)BITUMEN i)To Carrying out Bitumen penetration , softeing point, flash and fire point, specific gravity

29

-

-

... More
ii)Carrying out Viscosity on bitumen with a frequency in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes, overhead and any other allied charges etc. complete.

4

-

-

... More
iii)Carrying out Ducility I Elastic Recovery in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes, overhead and any other allied charges etc. complete.

11

-

-

... More
iv)To carrying out Extraction of bitumen mix with a frequency in Government P.W.D. laboratory and submitting test results and retesting if required including all taxes, overhead and any other allied charges etc. complete..

25

-

-

... More
v)To carrying out B. M. Job Mix Design with all Tests on 1 Mix aggregate (Excluding bitumen) in approved laboratory and submitting test results.

1

-

-

... More
D)BASIC TEST OF CEMENT. i)Basic Test of Cement To carrying out standard consistancy finneness specific gravity setting time ( initial and final) compressive strength soundness in approved laboratory and submitting test results

10

-

-

... More
E)CONCRETE i)To carrying out CONCRETE '-'20 Compressive Strength OF C.C. Cube M10 (Set of 3 cubes) in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes,

20

-

-

... More
ii)To carrying out CONCRETE ~'-'20 Compressive Strength OF C.C. Cube M 20 (Set of 3 cubes) in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes,

20

-

-

... More
iii)To carrying out Concrete Mix Design 1 Test t--- I(With all Tests on basic materials)* in Government P.W.D. laboratory and submitting test results. and retesting if required including all taxes,

2

-

-

... More
(Contractor should quote his rates without considering G.S.T.)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.