Kerala State Electricity Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala State Electricity Board - KSEB Tender
Eprocure
Opening Date
22 Mar 2019Closing Date
8 Apr 2019Tender Amount
₹ 10,05,787Costs
EMD
₹ 27,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_KSEB_275319_1Bid Award Id
ViewTender No
AEE/TSD-MZR/13/18-19/20.03.19Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Providing Marconite electrode earthing to earth mat at 66 KV Sub Station, Triveni
Providing Marconite Electrode earthing to earth mat at 66 KV Sub Station, Triveni
Providing Marconite electrode earthing to earth mat at 66 KV Sub Station, Triveni
BOQ Items
Earthwork excavation by mechanical / manual means infoundations, trenches or drains ( not ding 1.5 m in width or 10 sqm on plan) including getting out, disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by departmental staff at site (Hard rock -where blasting prohibited)
2.25
-
946.44
Earthwork excavation by mechanical / manual means over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan including getting out, disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by departmental staff at site
7.5
-
181.52
Filling available excavated earth ( excluding rock) in trenches in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering , lead upto 50 m and lift upto 1.5 m
10.5
-
181.23
Cutting 32mm MS rod in required length etc complete as per the direction of the departmental officers.
50
-
65.27
Bending 32mm MS rod for crossing cable trench/foundations/risers etc.
76
-
96.01
Laying of earth mat of required size as specified using 40/32/25mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.
20
-
561.23
Drilling bore holes of sizes 100mm or nearest in all classes of soil including hire charges of plant and machinery, cost of oil, fuel, tool etc. and taking all necessary precautions for safety to the substation equipments etc. as per the direction of departmental officers at site.
266
-
350
Welding the ground electrode to main mat in the trenches to a length of 150mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.
76
-
199.42
Providing, laying and filling bore holes with conductive concrete using marconite and cement in the ratio2:1 ( 2 Marconite :1 Cement in weight with 1Ltr of water per 4 kG of total mix)) ramming suitably to remove air pockets thoroughly as directed by departmental staff at site.
2.5
-
369365.13
Centering and shuttering including strutting, Proping etc. and removal of form for columns, pillars etc
14
-
653.37
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
1
-
8957.56