Kerala State Electricity Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala State Electricity Board - KSEB Tender

Works
Eprocure

Opening Date

22 Mar 2019

Closing Date

8 Apr 2019

Tender Amount

₹ 10,05,787 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Providing Marconite electrode earthing to earth mat at 66 KV Sub Station, Triveni
Providing Marconite Electrode earthing to earth mat at 66 KV Sub Station, Triveni
Providing Marconite electrode earthing to earth mat at 66 KV Sub Station, Triveni
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation by mechanical / manual means infoundations, trenches or drains ( not ding 1.5 m in width or 10 sqm on plan) including getting out, disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by departmental staff at site (Hard rock -where blasting prohibited)

2.25

-

946.44

... More
Earthwork excavation by mechanical / manual means over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan including getting out, disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by departmental staff at site

7.5

-

181.52

... More
Filling available excavated earth ( excluding rock) in trenches in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering , lead upto 50 m and lift upto 1.5 m

10.5

-

181.23

... More
Cutting 32mm MS rod in required length etc complete as per the direction of the departmental officers.

50

-

65.27

... More
Bending 32mm MS rod for crossing cable trench/foundations/risers etc.

76

-

96.01

... More
Laying of earth mat of required size as specified using 40/32/25mm MS rod including levelling lowering and placing in trenches, complete as per the direction of departmental officers.

20

-

561.23

... More
Drilling bore holes of sizes 100mm or nearest in all classes of soil including hire charges of plant and machinery, cost of oil, fuel, tool etc. and taking all necessary precautions for safety to the substation equipments etc. as per the direction of departmental officers at site.

266

-

350

... More
Welding the ground electrode to main mat in the trenches to a length of 150mm after cleaning the surface neatly. Charges includes cost of low hydrogen DC electrodes (No. E7018), hire charges of DC welding set and tools and plants required, current charges, labour charges for holding MS rod in position and applying two coats of anti corrosive paints at the welded joints etc. complete as per the directions of departmental officers.

76

-

199.42

... More
Providing, laying and filling bore holes with conductive concrete using marconite and cement in the ratio2:1 ( 2 Marconite :1 Cement in weight with 1Ltr of water per 4 kG of total mix)) ramming suitably to remove air pockets thoroughly as directed by departmental staff at site.

2.5

-

369365.13

... More
Centering and shuttering including strutting, Proping etc. and removal of form for columns, pillars etc

14

-

653.37

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

-

8957.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.