Forest Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Forest Department Tender

Agriculture or Forestry Works

Opening Date

13 Nov 2018

Closing Date

NA

Tender Amount

₹ 42,20,535 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Raising of 4"x6" seedlings (Transplanting seedlings)

1000

-

-

... More
Transplanting of 4"x6" or5"x8" size bagged seedlings in to 14"x20" size bags after removal of the seedlings along with the trimmed ball of earth.

1000

198

198.04

... More
Watering to the Polythene bagged seedlings twice a day from 01-06-2018 to 31.03.2019 for 304 days excluding rainy days

1000

19908

65.49

... More
Weeding in polythene bags

1000

529

132.47

... More
Shifting and grading the polythene bagged seedlings

1000

1782

594.21

... More
Cost of collection of 8-10 ft. long stakes of 'Chewa' or split dowga bamboos from departmental forest / plantation for providing vertical support to each plant including delivery at nursery site

1000

5502

5502.58

... More
Tying of plant to the vertical stake and de-buding the plants till it attains height of 6 feet and keeping them straight all the time : No de-buding after plant attains height of 6 feet and allow the formation of crown( for tall seedlings)

1000

340

340.62

... More
Cost of DAP

15

375

25

... More
Application of DAP or NPK to the seedling in polythene bags @ 5 gm or so (only for tall seedlings for roadside/GUA planting)

1000

862

287.6

... More
Pruning of Taller seedlings as seedling grows

1000

283

283.85

... More
Cost of application of pesticides / Fungicides biofertilisers, diesel bill, repairs to pump set electricity bills, nursery dev. Charges.

1

600

566.45

... More
Miscellaneous, Unforeseen & rounding off

-

-

-

... More
Particulars of work

-

-

-

... More
Watering to the Polythene bagged seedlings twice a day from 1st April 2018 for 120 days

1000

7858

65.49

... More
Weeding the Polythene bagged seedlings

1000

264

132.47

... More
Shifting & grading the Polythene bagged seedlings

1000

1782

594.21

... More
Electricity charges, diesel charges, maintenance charges of nursery, etc.

1000

342

342.3

... More
Miscellaneous, Unforeseen & rounding off

-

1

-

... More
Particulars of the Work

-

-

-

... More
Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design)

200

56

283.85

... More
Excavation of pits of size 1 Mtr. x 1 Mtr. x 1Mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil outside the pits (1/3rd top soil to be deposited on the upper side & 2/3rd on the lower side):

200

31784

158.92

... More
Cost of Raising Seedlings in 14" x 20" PBs, including 10% Casuality Replacement

200

12316

61.58

... More
Miscellaneous, Unforeseen & rounding off

-

3

-

... More
Particulars of work

-

-

-

... More
Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil, duly breaking the clods & formation of saucer shaped mound on the lower side of the pit

150

2551

17.01

... More
Loading & Unloading of polythene bagged seedlings:

220

1540

7001.25

... More
Loading of polythene-bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site (including casuality replacement upto 10%)

-

-

-

... More
Seedlings raised in 14" x 20" size bags

-

-

-

... More
Transportation: Transportation of polythene-bagged seedlings in hired truck from the nursery site to planting site (including casuality replacement upto 10%)

-

-

-

... More
(iii) Seedlings raised in 14"x20" size bags: Distance from 21 to 30 Kms.

220

1758

7991.51

... More
Watering by dipping: Watering polythene bagged seedlings at planting site in water, including carrying of water (including casuality replacement upto 10%) (14"x20")

220

149

681.19

... More
Conveyance of tall seedlings raised in HDPE bags of size 14"x20" from the dumping point to the planting site near each pit on head load, fixing the supporting stake firmly in the pit, planting the tall seedling in the pit tying the seedling to the supporting stake at 3 points (excluding cost of supporting stake) (14"x20" planting )

220

8327

37.85

... More
Purchase of DAP (100+100=200 gms per plant) 2 times

40

1000

25

... More
Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. *

200

121

302.71

... More
Saucer Bharav: Scraping out of grass and weeds to a radius of 50 cms around the plant, earthening up of plants in the form of a semi-circular slanting saucer shape slope, loosening of boulders if any with soil with the help of pickaxe and arranging the loosened bouldes and soil in semi-circular fashion at the lower side of the (Dimension 80 cms diameter and 25 cms depth at deepest point)

200

1665

8325.79

... More
Procurement, Transportation & fixing of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet.

200

7426

37.13

... More
Scraping of grass and other growth around the plant to a radius of 1 m. (Oct - Nov)

200

1304

6520.56

... More
Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only). (Oct - Nov)

200

756

3784.47

... More
Watering to plants wherever it is feasible and possible 6 times (One watering if planted in May, 5 watering in Jan, Feb & March)

200

26940

22.45

... More
Watch & Ward of plantations from July-2018 to March -2019 for every 3 Kms. - 274 days

274

29249

320.25

... More
Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (10 branches per tall plant)

200

4534

22.67

... More
Conveyance of P.J. branches to individual pit, tying P.J.branches around the supporting stake properly covering the tall plant with P.J.thorny branches to a height of more than 2m and tying the P.J.branches with G.I.wire at 3 places (10 P.J.branches to be used for tying the fall seedling). Alternately phoenix leaves could be used depending on availability.

200

5294

26.47

... More
Providing & fixing quality plantation board

-

500

-

... More
Maintenance of 14"x20 seedlings.

220

2255

10.25

... More
Raising of 14"x20" pb seedlings. (casuality replacement upto 10%)

20

1231

61.58

... More
Miscellaneous, Unforeseen & rounding off

-

5

-

... More
Particulars of work

-

-

-

... More
Re-opening of pits of size 0.75x0.75x0.75 for replacement of causalities

8.44

383

45.42

... More
Refilling of pits of size 0.75x0.75x0.75 for repalcement of causalities

20

151

7.57

... More
Loading & unloading of Pbs of size seedlings raised in 14"x20" size pabs

20

140

7001.25

... More
Transportation: Transportation of polythene-bagged seedlings in hired truck from the nursery site to planting site. Seedlings raised in 14" x 20" size bags : Distance from 21 to 30 Kms.

20

159

7991.51

... More
Watering by dipping: Watering polythene bagged seedlings at planting site by dipping in water, including carrying of water Seedlings raised in 14" x 20" size bags

20

13

681.19

... More
Conveyance of tall seedlings raised in HDPE bags of size 14"x20" from the dumping point to the planting site near each pit on head load, fixing the supporting stake firmly in the pit, planting the tall seedling in the pit tying the seedling to the support

20

757

37.85

... More
Purchase of DAP (100+100=200 gms per plant) 2 times

40

1000

25

... More
Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. *

200

60

302.71

... More
Scraping of grass and other growth around the tall plant to a radius of 60 cm (Pits)

200

469

2346.35

... More
Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only).

200

756

3784.47

... More
Watering to the seedlings along road side @ 50 ltrs per plant - 2. times

200

8980

22.45

... More
Watch & Ward of plantations from April-2018 to March -2019 for every 3 Kms. - 365 days

3

38963

320.25

... More
Procurement & transportation of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden/ Eucalyptus Stakes. Each of the Bamboo / wooden sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet

20

848

42.44

... More
Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (8-10 branches per plant)

20

453

22.67

... More
Conveyance of P.J. branches to individual pit, tying P.J.branches around the supporting stake properly covering the tall plant with P.J.thorny branches to a height of more than 2m and tying the P.J.branches with G.I.wire at 3 places (10 P.J.branches to be used for tying the tall seedlings)

20

529

26.47

... More
Maintenance of 14"x20 seedlings.

20

205

10.25

... More
Miscellaneous, Unforeseen & rounding off

-

2

-

... More
Particulars of work

-

-

-

... More
Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only).

200

756

3784.47

... More
Watch & Ward of plantations from April-2018 to March -2019 for every 3 Kms. - 365 days

3

38963

320.25

... More
Misc & documentation

-

4

-

... More
Particulars of work

-

-

-

... More
Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only).

200

681

3406

... More
Watch & Ward of plantations from April-2018 to March -2019 for every 3 Kms. - 365 days

3

38963

320.25

... More
Misc & documentation

-

5

-

... More
Particulars of work

-

-

-

... More
Cutting & collection of P. J. branches loading the same into the lorry & unloading at the planting site (8-10 branches per plant)

200

4534

22.67

... More
Conveyance of P. J. branches to individual pit, tying P. J. branches around the supporting stake properly covering the tall plant with P. J. thorny branches to a height of more than 2m. and tying the P. J. branches with G. I. wire at 3 places (10 P. J. branches to be used for tying the tall seedling)

200

5294

26.47

... More
Misc & documentation

-

2

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.