Housing And Urban Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Housing And Urban Development Department - HAUDD Tender
Civil Works Others
Eprocure
Opening Date
3 Sep 2019Closing Date
12 Sep 2019Tender Amount
₹ 4,00,000Costs
EMD
₹ 8,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HAUDD_81130_1Bid Award Id
ViewTender No
86-LBJ(II) of 2019-20 dated 03/09/2019Tender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://http://jkhudd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Reinforcement of RCC work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars.
1525
-
71
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
14.86
-
179.25
Centring and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
20.07
-
342.8
Centring and shuttering including strutting, propping etc. and removal of form for Literls, beams, plinth beams, girders, bressumers and cantilevers.
8.78
-
305.7
Centring and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.
11.57
-
372.4
Centring and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls. Under 20 cms wide.
37.8
-
176.55
Brick work with common burnt clay F.P.S (non-modualar) bricks of class designation 75 in foundation and plinth in cement mortar 1:6( 1 cement:6 fine sand)
5.89
-
4540.6
Extra for brick work in superstructure above plinth level upto floor V level (by manual means).
5.89
-
706.5
12 mm thick cement sand plaster of mix 1:4 (1 cement : 4 coarse sand)
85.33
-
158
Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade. New work (two or more coats) applied @3.84 Kg/ 10 sqm.
85.33
-
56.9
Providing and applying white cement based putty of average thickness 2 mm of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth complete.
85.33
-
121.5
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete. On concrete work.
85.33
-
128.95
Providing and fixing of floodlight 150 watt including fitting and wiring complete
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements