UT Administration Of Dadra And Nagar Haveli Tender
View complete overview of Dadra & Nagar Haveli UT Administration Of Dadra And Nagar Haveli Tender
UT Administration Of Dadra And Nagar Haveli Tender
Building Construction
Eprocure
Opening Date
6 Sep 2021Closing Date
27 Sep 2021Tender Amount
₹ 49,56,647Costs
EMD
₹ 90,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UTDNH_5570_1Bid Award Id
ViewTender No
E Tender Notice No 07 OF 2021-22 (T)Tender Authority
UT Administration Of Dadra And Nagar Haveli ViewPurchaser Address
-Website
http://dnhtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering.
1.86
-
-
Filling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete.
53.52
-
-
Providing material and labour for filling in foundation and plinth with RUBBLE under floors including filling gravel in gaps and consolidating deposited layers by ramming water etc. Complete.
66.66
-
-
Providing material & labour for laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth.
43.44
-
-
Providing and laying controlled cement concrete M.200 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete.
6.24
-
-
Providing and laying controlled cement concrete M.200 and curing complete including the cost of formwork but excluding reinforcement for reinforced concrete work in (C) Slabs,landing,shelves,Balconies, Lintels, Beams, Girders and Cantilever upto floor two level. FOR BEAM.
18.24
-
-
Providing material & labour TMT Bar 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level.
4116
-
-
Providing material & labour for Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand) UP to Plinth Lvl & curing complete.
16.14
-
-
Providing material & labour for 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand) etc. complete. UPTO TWO FLOOR LEVEL.
68.7
-
-
Providing material & labour for Marbo Grenite tiles 8 to 10 mm thick , in skrting risers of steps and dedo on 10mm thick cement plaster 1:3 (1-cement : 3-coarse sand) and jointed with white cement slurry.
27.96
-
-
Providing and fixing suspended false ceiling made
out of 6.0 mm (apprx.) thick Cement Sheet Plaster Boards made G.I standard section framework in the pattern and as per design directed by the Engineer in charge. The G.I. Section frame work shall be tied to the roof and walls with the anchor fastener screws/bolts of appropriate size recommended by the cement sheet. The boards shall be fixed to the frame work with the screws and the joints shall be flushed and finished with requisite jointing compounds paper tapes etc. Rates includes execution of works in different levels/offsets etc. The surface shall be finished evenly by applying putty,sand papering,applying primer evenly complete. Rate inclusive of materials transportation, loading/unloading labor, tools and tackles up to any lead and lift complete in all respects.
265.56
-
-
Providing material & labour for southern yellow pine (SYP) pine wood of size 300 x 3000 x 32mm for flooring as per design and specification with all necessary fixtures fittings etc. Complete.
8.43
-
-
Providing material & labour for fixing corrugated galvanised aluminium sheets of 0.63mm thick (24 B.W.G.) for roofing including MS framing and fastening with galvanised iron screws and bolts, lead and bitumen washers as per drawing etc. as directed by engineer in charge complete.
357.23
-
-
Providing material and labour for cast iron column work including cutting, hoisting, fixing in position and applying a two coat of anti corrosive epoxy paint. (A)In beams and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.having decorative design as per design detail drawing or as directed by engineer in charge complete.
146.4
-
-
Providing material and labour for cast iron eveboard work including cutting, hoisting, fixing in position and applying a two coat of anti corrosive epoxy paint. (A)In beams and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.having decorative design as per design detail drawing or as directed by engineer in charge complete.
180.22
-
-
Providing material and labour for cast iron rafter work including cutting, hoisting, fixing in position and applying a two coat of anti corrosive epoxy paint. (A)In beams and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.having decorative design as per design detail drawing or as directed by engineer in charge complete.
209.2
-
-
Providing material and labour for cast iron purlin work including cutting, hoisting, fixing in position and applying a two coat of anti corrosive epoxy paint. (A)In beams and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.having decorative design as per design detail drawing or as directed by engineer in charge complete.
612.41
-
-
Providing material and labour for cast iron railing work including cutting, hoisting, fixing in position and applying a two coat of anti corrosive epoxy paint. (A)In beams and joists, channels angles Tees, flats, with connecting plates or angle cleats as in main and cross beams. Hip and jack rafters, purlins conneted to common rafters and the like.having height of 0.90 meter from F.F.L. & decorative design as per design detail drawing or as directed by engineer in charge complete.
144.02
-
-