Roads And Buildings Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Roads And Buildings Department Tender

Civil Works Roads

Opening Date

24 Mar 2021

Closing Date

8 Apr 2021

Tender Amount

₹ 6,23,67,369 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

9105

-

1041612

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

17035

-

143094

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Construction of Granular sub-base by providing HBT material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

2745

-

5188050

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.

5702

-

11900074

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge

32508

-

1066262.4

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

32508

-

406350

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

32508

-

338083.2

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blastedtrap crushed aggregates of Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .

1626

-

10344612

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and laying of 30 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blastedtrap crushed aggregates of Grading ? II as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

976

-

8255008

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately as directed by the Engineer-in-Charge and as per MoRTH specification 202-2.6 (5th revision)

352

-

498080

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBT crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement

423

-

1630665

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated cement concrete M 35 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

884

-

4961892

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2100 (5th revision) and as per I.S.1786 of 1985 for CC Pavement

0.4

-

21420.4

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing Uncoated Mild Steel bars ( Fe-250 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for CC Pavement

0.8

-

42815.2

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Supplying and laying of seperation membrane 125 micron and as per ISI standard specification duly fixing over DLCC including cost, conveyance of all materials etc., complete and as directed by the Engineer-in-Charge during execution of work.

4578

-

69814.5

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing 25.4 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.

21

-

17619

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)

46

-

32200

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge

1477

-

152278.7

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBT crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course.

117

-

484731

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for footings and Raft foundation .

185

-

886520

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure .

777

-

3938613

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 800/1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

50

-

445700

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing, laying Reinforced cement concrete Hume pipes of 800 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 800/1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.

37.5

-

197437.5

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Filling in between body walls with gravel including cost and conveyance of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 & 2907 (5th Revision) and as per Drawing and technical specifications for finished item of work.

167

-

111222

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (4th revision ) and as directed by the Engineer-in-Charge for Bed blocks & Backing walls (Sub-structure)

11

-

61490

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2300 (5th revision ) and as directed by the Engineer-in-Charge for Deck slab

48

-

292704

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

8

-

43792

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Back filling behind Abutments with gravel including cost ,conveyance of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

392

-

261072

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2300 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

19

-

1056837

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

1.15

-

62293.2

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)

201

-

71958

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

54

-

81594

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Providing 25.4 mm thick Mastic pads for Expansion joints etc., complete for finished item of work.

14

-

11746

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Cover slabs over side drains

72

-

380520

... More
(a) Widenining and Strengtheining of PRP Road to Mopuridevalalu raod from km 0/0 to 4/6 (b) Widening;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

70

-

5817



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.