To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Acharya NG Ranga Agricultural University - ANGRAU Tender
Building Construction
Opening Date
7 Jun 2019Closing Date
21 Jun 2019Tender Amount
₹ 28,35,605Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
280697Bid Award Id
ViewTender No
ANU/Engg. Sec./UE/ DEE/RUSA/Various Civil Works/2019-20, dated: 31.05.2019Tender Authority
Acharya NG Ranga Agricultural University ViewPurchaser Address
-Website
http://www.nagarjunauniversity.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Painting, Priming One Coat of Red Oxide and Two coats of Synthetic enamel paint on New Iron Work As per AP Revised Std Data Index Codes : BLD-CSTN-10.7 & BLD-CSTN-10.12
419.24
-
151
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
19.37
-
1398
Renovation of Laboratories to the Dept. of Zoology & Aquaculture in A. N. U. Campus at an ECV of Rs3.4,93,000.00
-
-
-
Manpower supply for removing unrepairable
10
-
350
Dis-mentling of floor work s i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
3.47
-
154
Dismentling/Demolition brick work including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead as AP Revised Std Data Index Code : BLD-CSTN-12-2
4.38
-
1615
Brick masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd class including cost and conveyance of all materials such as bricks, cement, sand, water, etc. to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as mixing mortar, laying bricks, finishing, curing, etc., complete as directed by the Engineer-in-charge
2.07
-
5156
Providing weld mesh with 20mm thick (1:1:2) C.C planks for cupboards arrangements for finished to even & smooth surfaces i/c. cost, conveynace of all materials, all leads, lifts, curing, labour charges etc., complete.
51.23
-
1073
Plastering with CM in 2 coats, 20mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work as per AP Revised Std Data Index Code : BLD-CSTN-6.9
13.78
-
306
Supply & fixing of Teak wood cupboard frame of size 2.8M x 1.5M with intermediate verticles of best indian first class T.W all round frame in thickness of 0.125 x0.038M and Shutter of Toughened Plain Glass 8mm thick fixed in 31.5x19.00mm 3mm thick of two track sliding alluminum track alognwith rollers, pusher i/c.cost, conveynace of all materials, taxes, labour charges etc., complete.
9.55
-
5395
Painting two coats with plastic emulsion of first qualitgy of approved brand and colour over a primary coat(Three coats in total) including cost and conveyance of all operational, incidental charges, labour charges, etc. complete for finfished item of work as directed by the Engineer-in-charge
1066.7
-
166
Supply and fixing Supply and fixing of Stainless steel Fly proof mesh fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as per AP Revised Std Data Index No : BLD-CSTN-11-30
18.9
-
3486
Supplying and fixing of porceline white Lab Sinks of ISI mark with connection I/c cost conveyance of all materials taxes, labour charages etc complete.
21
-
4782
S&F 12.7 mm heavy duty NP sink cock Seiko / Senior / Nice or equivalent
15
-
1142
Renovation of Class Room and Seminar Hall to the Dept. of Zoology & Aquaculture in A. N. U. Campus at an ECV of Rs.4,92,858.00
-
-
-
Dis-mentling Reinforced of doors and windows I/c removal of frame, hinges and fastening i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
10.2
-
117
Dis-mentling of floor work s i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
5.76
-
154
Brick masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd class including cost and conveyance of all materials such as bricks, cement, sand, water, etc. to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as mixing mortar, laying bricks, finishing, curing, etc., complete as directed by the Engineer-in-charge
7.31
-
5156
Supplying, fabrication, fixing of MS Guard bars and approved design with M.S. Flats/Square bars i/c cost, conveyance of all materials, taxes, labor charges etc, complete
720
-
102
Plastering with CM in 2 coats, 20mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work as per AP Revised Std Data Index Code : BLD-CSTN-6.9
29.4
-
295
Supplying and fixing Gyp Board suspended regular single layer false ceiling (GS-MFSC-4.1 as per IndiaGypsum) using 12.5 mm thick Gyp Board confoming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size of 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ pertition at 610 mm c/c and suspending the frame work using intermediate channels (45 mm x 15 mm x 15 mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI cleat and steel expansion fasterners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & joining and finishing using joint compound and paper tape to have a flush lock including filling the tapered & square edges with joining compound, two coats of drywall topcoat compete for finished item of work as per India Gysum Ltd. specification for:- F1 Gyp Board Suspended regular false ceiling F.1
211.97
-
1025
Providing plaster of paris ornamental boarder of approved design as approved by the departmental officers-in-charge of the work including cost and conveyance of all meterials to site and all labour charges for fixing in position etc., complete for finished item of work.
82.7
-
208
Providing smooth finish to the existing plastered surface Birla Wall Care putty in 2 coats compound 1.50 Kgs/Sqm over base coat and top coat of 1 Kg/ Sqm totally 2.50 Kgs/ Sqm of approved materials I/c Two coats of Emulsion over one coat of Cement primer(total 3 coats) I/C cost conveyance of all materials, taxes, labour charges etc complete
281.88
-
309
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
5.76
-
1398
Painting, Priming One Coat of Red Oxide and Two coats of Synthetic enamel paint on New Iron Work As per AP Revised Std Data Index Codes : BLD-CSTN-10.7 & BLD-CSTN-10.12
132.1
-
151
Supply & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250
3
-
4782
Providing and fixing IS:3564 marked Aluminium Extruted section body tubular type universal hydrulic Door Closure with double speed adjustment,Harwyn make (Gazel) with necessary accessories and srews etc., complete.
4
-
1193
S&F 12.7 mm heavy duty NP sink cock Seiko / Senior / Nice or equivalent
2
-
1142
Providing S.S.Fly proof Meshes and to arrest water leakages in to the slab to the N.S.S.Bhavan in ANU Campus at an ECV of Rs.3,86,356.00
-
-
-
Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 1 Kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, including all operational, incidental and labor charges for mixing mortar, laying, rendering smooth and thread lining, curing, round off junctions of wall and slab, etc. completed for finished item of work as directed by the Engineer-in-charge
278.22
-
351
Supply and fixing Supply and fixing of Stainless steel Fly proof mesh fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as per AP Revised Std Data Index No : BLD-CSTN-11-30
38.24
-
3486
Supply and fixing of two track sliding aluminimum windows with 5.00 mm thick plain black / coloured glass including cost and conveyance of all materials labour charges for manufacturing fixing in position using wooden blocks and sheet metal screw etc. to complete.
38.24
-
3778.37
Dis-mentling Reinforced of doors and windows I/c removal of frame, hinges and fastening i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
38.24
-
70
Plastering with CM in 2 coats, 12mm thick, base coat in CM (1:5), 8mm thick and top coat in CM(1:3), 4mm thick with sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work
26.91
-
306
Renovation of Class Room and Laboratories of the Department of Bio-Chemistry in ANU Campus at an ECV of Rs.4,28,971.00
-
-
-
Dis-mentling Reinforced of doors and windows I/c removal of frame, hinges and fastening i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
30.69
-
117
Brick masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd class including cost and conveyance of all materials such as bricks, cement, sand, water, etc. to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as mixing mortar, laying bricks, finishing, curing, etc., complete as directed by the Engineer-in-charge
0.61
-
5156
Supplying, fabrication, fixing of MS Guard bars and approved design with M.S. Flats/Square bars i/c cost, conveyance of all materials, taxes, labor charges etc, complete
1200
-
102
Plastering with CM in 2 coats, 20mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work as per AP Revised Std Data Index Code : BLD-CSTN-6.9
88.48
-
306
Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x 29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work
44.55
-
3153
Supply and fixing Supply and fixing of Stainless steel Fly proof mesh fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work as per AP Revised Std Data Index No : BLD-CSTN-11-30
37.95
-
3486
Renovation of Faculty Rooms of the Department of Bio-Chemistry in ANU Campus at an ECV of Rs.4,81,873.00
-
-
-
Manpower supply for removing unrepairable thermacoal ceailing,
3
-
350
Dis-mentling Reinforced of doors and windows I/c removal of frame, hinges and fastening i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
16.28
-
117
Dis-mentling of floor work s i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
17.64
-
154
Brick masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd class including cost and conveyance of all materials such as bricks, cement, sand, water, etc. to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as mixing mortar, laying bricks, finishing, curing, etc., complete as directed by the Engineer-in-charge
2.45
-
5205
Providing weld mesh with 20mm thick (1:1:2) C.C planks for cupboards arrangements for finished to even & smooth surfaces i/c. cost, conveynace of all materials, all leads, lifts, curing, labour charges etc., complete.
30.48
-
1073
Plastering with CM in 2 coats, 20mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finish including cost and conveyance of all materials such as cement, sand, seigniorage charges, all operational, incidental and labour charges such as mixing mortar, application, curing, etc. complete for finished item of work as per AP Revised Std Data Index Code : BLD-CSTN-6.9
55.87
-
306
Supplying and fixing of false ceiling using Plaster of Paris Boards 12mm thick with standard GI ceiling angles, sections perimeter channels including cost and conveyance of all materials and labour charges, taxes, etc, complete
52.92
-
441.09
Providing plaster of paris ornamental boarder of approved design as approved by the departmental officers-in-charge of the work including cost and conveyance of all meterials to site and all labour charges for fixing in position etc., complete for finished item of work.
51
-
208
Supply & fixing of Teak wood frame all- round with thick cup-boards of various sizes best indian Ist class alround frame size: 1.60mx 2.30m and shutters with Railway sun Glass 6mm '100mm' long butt hinges, 125mmhandles, T.W design beeding, magnetic cashes, i/c.cost, conveynace of all materials, taxes, labour charges etc., complete
21.85
-
5395
Providing smooth finish to the existing plastered surface Birla Wall Care putty in 2 coats compound 1.50 Kgs/Sqm over base coat and top coat of 1 Kg/ Sqm totally 2.50 Kgs/ Sqm of approved materials I/c Two coats of Emulsion over one coat of Cement primer(total 3 coats) I/C cost conveyance of all materials, taxes, labour charges etc complete
52.92
-
3086
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
20.19
-
1398
Painting two coats with plastic emulsion of first qualitgy of approved brand and colour over a primary coat(Three coats in total) including cost and conveyance of all operational, incidental charges, labour charges, etc. complete for finfished item of work as directed by the Engineer-in-charge
347.35
-
166
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labor charges etc. complete for finished item of work
5
-
2524
Providing Gypsum Ceiling and Birla Wall Care painting to the two class rooms of Dept. of Tourism and Hospitality Management in A.N.U. Campus at an ECV of Rs.3,53,686.00
-
-
-
Manpower supply for removing unrepairable thermacoal ceailing and Doors repair
10
-
350
Supplying and fixing Gyp Board suspended regular single layer false ceiling (GS-MFSC-4.1 as per IndiaGypsum) using 12.5 mm thick Gyp Board confoming to IS 2095 - 1982 fixing to Gyp steel GI perimeter channels of size of 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ pertition at 610 mm c/c and suspending the frame work using intermediate channels (45 mm x 15 mm x 15 mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI cleat and steel expansion fasterners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & joining and finishing using joint compound and paper tape to have a flush lock including filling the tapered & square edges with joining compound, two coats of drywall topcoat compete for finished item of work as per India Gysum Ltd. specification for:- F1 Gyp Board Suspended regular false ceiling F.1
100
-
1025
Providing plaster of paris ornamental boarder of approved design as approved by the departmental officers-in-charge of the work including cost and conveyance of all meterials to site and all labour charges for fixing in position etc., complete for finished item of work.
78
-
207.9
Providing smooth finish to the existing plastered surface Birla Wall Care putty in 2 coats compound 1.50 Kgs/Sqm over base coat and top coat of 1 Kg/ Sqm totally 2.50 Kgs/ Sqm of approved materials I/c Two coats of Emulsion over one coat of Cement primer(total 3 coats) I/C cost conveyance of all materials, taxes, labour charges etc complete
500
-
309
Painting two coats with plastic emulsion of first qualitgy of approved brand and colour over a primary coat(Three coats in total) including cost and conveyance of all operational, incidental charges, labour charges, etc. complete for finfished item of work as directed by the Engineer-in-charge
400
-
166
Painting, Priming One Coat of Red Oxide and Two coats of Synthetic enamel paint on New Iron Work As per AP Revised Std Data Index Codes : BLD-CSTN-10.7 & BLD-CSTN-10.12
70
-
151
Providing Ceramic Tiles of Ground Floor and First Floor Corridors to the International Students Cell in ANU Campus at an ECV of Rs.4,16,931.00
-
-
-
Dismantling/Demolition of floor including stacking of serviceable materials and disposal of unserviceable materials within 100 meters lead including cost and conveyance, labour charges etc., complete for finished item of work.
35.31
-
154
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,
277.8
-
951
Painting two coats with plastic emulsion of first quality of approved brand and colour over old paint coat (Two coats in total) including cost and conveyance of all operational, incidental charges, labor charges, etc. complete for finished item of work
259.49
-
115
Supply and application of Two coats of Syntheetic enamel paint on Iron/Wood Work including cost and conveyance of all materials and labour charges etc, for finished item of work
46.61
-
104
Supply and fixing of two track sliding aluminimum windows with 5.00 mm thick plain black / coloured glass including cost and conveyance of all materials labour charges for manufacturing fixing in position using wooden blocks and sheet metal screw etc. to complete.
27
-
4171