State Urban Development Agency Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
State Urban Development Agency - SUDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date
22 Oct 2021Closing Date
27 Oct 2021Tender Amount
₹ 7,94,660Costs
EMD
₹ 79,466Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SUDA_632223_81Bid Award Id
ViewTender No
1116/VIKSH NIDHI/NIVIDA/DUDA/2020-21 Date 12-10-21Tender Authority
State Urban Development Agency ViewPurchaser Address
-Website
http://http://sudaup.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work.
As Per S.I. No.- 584
53
-
150
Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
As Per S.I. No.-279 (a)
2.51
-
5280
Consolidation of GSB by well Graded Material including supply of all materials, labour, Tools & plants etc.
50.63
-
1808
Construction of un-reinforced, construction joint only, plain cement concrete pavement, thickness Less than 20 cm , over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, including Cost of Polythene Sheet and also including complete shifting of matrials & Concrete etc.(M-20)
Thikness of CC is less then 20 cm. (without dowel Bar)
As Per N.I. No.-9(i) Ch.-20
75.94
-
6300
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 for slabs excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
As Per S.I. No.-284 (a)
1.13
-
6840
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. As Per A.R.
1.11
-
7418
Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work
1
-
4300
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements