Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Coronavirus COVID 19
Eprocure
Opening Date
18 Apr 2020Closing Date
3 Jun 2020Tender Amount
₹ 4,52,000Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_RDTN_162511_1Bid Award Id
ViewTender No
RCSIDS - 2019-2020-S.No.28 - KUNNANDARKOIL BLOCKTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Sand filling with filling sand including cost and conveyance to work site including all labour charges for filling etc complete
4.48
-
-
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all labour charges for filling etc complete
4.5
-
-
RCC 1: 1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all materials to sire including all labour charges for filling etc complete
10.88
-
-
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc., complete
74.8
-
-
Brick work in Cement mortor 1:5 mix using country bricksincluding cost and conveyance of all materials of all materials to site and labour charges etc., complete
14.67
-
-
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc., complete
920
-
-
Ceiling Plastering with cement mortor 1:3 mix tgo 10mm thickness including cost and conveyance of all materials to site and all labour charges etc., complete
23.12
-
-
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete
129.68
-
-
Weathering course with best quality broken brick jelly of size 20mm brickjnelly in pure slaked lime (no sand to be added) over the RCC roof slab in the propostition being brickjelly to lime 32:12:1/2 by volume and laid tinto a single layuer and consolidate to required finished thickness beating the misture with wooden beates keeping the surface constantly wetted by sprinking lime jeggery water including all other labour charges etc., complete and one layer of pressed tiles set in c.m 1:3 etc., complete
1.45
-
-
Pressed Tiles over the RCC roof slab in the proposition and consolidate to required finished thickness beating the mixture with wooden beaters keeping the surface constantly wetted by sprinking lime jaggery water including all other labour charges etc., complete and one layer of pressed tiles set in c.m. 1:3 etc., complete
18.1
-
-
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete
5.94
-
-
Paving the floor tiles of Scratch proof ceramic tiles of sized 305 x 305 x 6mm including all cost and conveyance and pointing with the same colour mortor with white cemtn including all other charges etc., complete
16.09
-
-
Supply and fixing of Glazed Tiled including cost and conveyance of all materials to site and all labour charges etc., complete
13.19
-
-
White Washing Two coats with shell limeincluding cost and conveyance of all materials to work site and all labour charges etc., complete
16.14
-
-
Distembering two coats incluidng cost of lime blue poweder, fevicol type gums,. Brushes, scaffolding charges etc., complete with standard specification
63.11
-
-
Emulsion painting incluidng cost of lime blue poweder, fevicol type gums,. Brushes, scaffolding charges etc., complete with standard specification
67.96
-
-
Supply and fixing of STEEL DOOR including cost and conveyance of all materials and all labour charges etc., Complete
2
-
-
Supply and fixing of STEEL WINDOWs including cost and conveyance of all materials and all labour charges etc., complete
4
-
-
Supply and fixing of STEEL Ventilator including cost and conveyance of all materials and all labour charges etc., complete
1
-
-
Painting Two Coats using ready mixed enamel paint including all cost and conveyance of all materials and all labour charges etc., complete
17.01
-
-
Wiring with 2x1.5 Sq.mm PVC insulated SC unsheathed copper conductor cable of 1100v grade in suitable PVC rigit pipe concealed in wall and ceiling with PVC accessories inflush wall with 3mm thick Hylum sheet cover with TW box and 5 A FT swich with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC Plug point SD 36
4
-
-
Supply and fixing of CFL bulf 11 W including cost and conveyance of all materials and all labour charges etc., Complete
4
-
-
Supply of 3 pin plug point including all labour charges etc., Complete
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements