Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Eprocure
Opening Date
11 Jan 2022Closing Date
20 Jan 2022Tender Amount
Refer DocumentsCosts
EMD
₹ 35,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_219376_1Bid Award Id
ViewTender No
GOBARDHAN-SBM(G) - Pudukkottai DistrictTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cement concrete 1:3:6 mix using using 40 mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
20.95
-
-
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
9
-
-
Supply and febrication and placing inposition mild steel or ribbed for steel and all rainfoced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, complete compltying with standard specification.
20
-
-
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the requiredheight for RCC items using MS Sheets or suitable size of BG 10 stiffened with welded
MS angles of size 25mm x 25mm x 3mm of boarding etc., complete
217.75
-
-
R.C.C. 1:1½:3 MIX USING 20MM HBG METAL including cost and conveyance of all materials to work site and all labour charges etc.complete
38.71
-
-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
50.79
-
-
Ceiling Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
193.96
-
-
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
357.11
-
-
Supplying and painting the walls with two coats of oil bound distember over one coat of water based cement primer including cost for distember, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushed, scaffolding arrangements, labour charges etc., as per standard specification. (The colour and shade of the distember shall be got approved by the Executive Engineer before use of work).
59.51
-
-
Painting two coats of newly Plastered wall surface with ready mixed plasticemulsion paint of first quality and of approved colour over a priming coat including thorough scapping, clean removal of dirt and including necessary plaster of paris putty, wherever required etc., complete
136.65
-
-
Paving the floor with Kotta Stone of size 610x 610 x 20mm cm 1:3, 20mm thick including all cost and conveyance of all materials to worksite and all labour charges etc., complete
16.28
-
-
Weathering course with brick jelly lime concrete using 20mm brick jelly with of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
1.28
-
-
Pressed Tiles with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and TERRACE FLOORING with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
16
-
-
Provision for Electrification
-
-
-
Fans
2
-
-
Exaust Fan
2
-
-
Light Point
2
-
-
CFL Light
2
-
-
Fan Point
4
-
-
Setting up of 1 MT per day Bio Methanation Plant Installation
-
-
-
Mixer with a capacity 1 MT / Hour fitted with 1 HP motor with one Stainless steel Table (6' x 1.5' x Variable Height from 3' to 2' towards mixer end)
1
-
-
Compressor (1 HP) (1 No)
1
-
-
Water Pump 1 HP ( 1 No)
1
-
-
Solar water Heater 100 L / Day capacity with suitable water storege tank and hot water tank to be mounted for giving Maximum efficiency in an aesthetic manner.
1
-
-
Slurry Pump 1 HP (1 No)
1
-
-
A gas holder fabricated in MS (5mm sheet) with suitable reinforced structure and coated with fiber paint on outside and epoxy painting on inside will be placed in water seal before commissioning of the project.
1
-
-
Electrical panel with 15 ampere (3 no) 5 ampere (6 no) soakets and 5 switches for tubelights, fans etc., mixers
1
-
-
Gas Meter Actaris make 16m3 / hour (1 No) to be connected on line
1
-
-
Gas pipe line from Digester to Balloon and Blloon to Generator
1
-
-
Weighting scale for 1-100 kg + standard ISI Mark scale
1
-
-
Neoprenen gas balloon of capacity 30 cubic meter
1
-
-
Wall Mounted fans 2 no (for Processing room)
1
-
-
Exhaust fans 2 No (for processing room)
1
-
-
Methane recycling grid to be provided on main degester as per drawing using 0.75" GI Pipes entering the main
1
-
-
Tool kid will include screw drivers, spanners for mixer, compressore, pumps etc.,
1
-
-
2 Name boards of successful binder and nisargruna write up
1
-
-
Installation and commissioning - installation of electrical and mechanical systems, culture seeding in main digster and stabilization uo to 1 moth from commissioning
1
-
-
15 KVA Bis gas generator 1 No Taxes, Transportation, Loading, Unloading Packing and forwarding - the Pre-installed equipment shall be send to the
1
-
-
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements