Power Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Power Development Department - PDD Tender

Civil And Construction
Eprocure

Opening Date

19 Feb 2020

Closing Date

28 Feb 2020

Tender Amount

Refer Documents 
Notes
Download

Costs

Summary

Creation Of Sub Station Under B2v.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage of S.T poles (Manual) 8 Mtr long 0 to 2 Km (Rural)

132

-

-

... More
Carriage of S.T poles (Manual) 9 Mtr long 0 to 500 Mtr (Urban)

12

-

-

... More
Carriage of S.T poles (Manual) 9 Mtr long 0 to 2 Km (Rural)

12

-

-

... More
Addl. Per Km

12

-

-

... More
Erection of poles complete with pit excavation in hard soil with 30-60% boulders, refilling the pit with soil and boulders, ramming including fixing of 1 No. Cross Arm, Tp pin clamp, Insulators and Braces

-

-

-

... More
8 Mtr long

132

-

-

... More
9 Mtr long

12

-

-

... More
Carriage of Line Material

-

-

-

... More
0 to 599 Mtr (Urban)

100

-

-

... More
0 to 2 Km (Rural)

100

-

-

... More
Laying & Stringing of Conductor

-

-

-

... More
Upto 50 Sq. mm Single Conductor Length

20

-

-

... More
Fixing of new fixtures

-

-

-

... More
M.S Cross Arms upto 3' long

40

-

-

... More
Above 3' upto and including 6' long

40

-

-

... More
Above 6' upto and including 10' long

96

-

-

... More
Fixing of Pin Insulator including Pin etc.

124

-

-

... More
Fixing of Shackle Insulator

324

-

-

... More
Erection of Top clamp for Pin insulator (HV)

124

-

-

... More
Fixing of U/D Clamps for LV Shackle Insulators

324

-

-

... More
Fixing of Danger Plates

144

-

-

... More
Fixing of anti climbing devices consisting of 12 turns of barbed wire equaly spaced over a length of 1 mtr of the pole from 2 mtr above ground level including clamping at both ends

144

-

-

... More
Painting of Steel Tubular Poles including cost of paint cross arms clamps, etc. with one base coat and two coats of Aluminium or other paint (Paint will be Provided by the Division)

-

-

-

... More
Upto 9 Mtr

144

-

-

... More
Painting of Sub Station Structure with ST Pole 2 No. including cost of Paint

6

-

-

... More
Concreting of ST Poles in CC 1:2 ratio including Cement

144

-

-

... More
Erection of Galvanized Stay Set complete with turn buckel/Stringing crew, Guy collar, Guy Insulator 2, Guy Wire with pit excavation & refilling & ramming etc

-

-

-

... More
LV using 16mm & G.I Rod and Anchor Plate

44

-

-

... More
Earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc. measurement of earth resistance

-

-

-

... More
Spiral Type with a spiral made of 115 turns of 8 SWG wire placed 1.5m below ground level including excavation of pit, refilling the same in hard soil

150

-

-

... More
Branch Cutting/route clearance

6.25

-

-

... More
Branch cutting

6.25

-

-

... More
Route clearance for a corridor of 5 mtrs.

6.25

-

-

... More
Laying, stringing, tensioniung and binding of conductor including pre-tensioning for removal of kinks, fixing of hardware fitings and jointing (where required for ACSR Conductor of sizes upto 50sqmm

20

-

-

... More
Unloading of Transformer

-

-

-

... More
Above 25 KVA upto and including 100 KVA

6

-

-

... More
Carriage of transformer

-

-

-

... More
0 to 500 Mtr for (Urban)

6

-

-

... More
Above 25 KVA upto and including 100 KVA

6

-

-

... More
0 to 2 Km for (Rural)

6

-

-

... More
Installation of G.O Set (Heavy Duty) with fuse unit/drop out fuse set including fixing of cross arms for mounting the set

6

-

-

... More
Installation of link set with fuse set

6

-

-

... More
Installation of D.O Set

6

-

-

... More
Installation of L.A Set (Station Type)

6

-

-

... More
Installation of Disc Insulator

42

-

-

... More
Fixing of Pre-fabricated brackets and cross arm bed for placement of transformer (for transformer upto including 250 KVA)

6

-

-

... More
Mounting of transformer on cross arm bed including HV and earth connections

-

-

-

... More
Upto and including 25 KVA

4

-

-

... More
Above 25 KVA upto and including 100 KVA

2

-

-

... More
Installation of LT circuit the job shall include laying of incoming cable from transformer upto switch gear. Installation of switchgear, laying of cable from switchgear to LT pole including thimbling of cable termination, marking end connections (rate for first circuit)

-

-

-

... More
Upto and including 25 KVA

4

-

-

... More
Above 25 KVA upto and including 100 KVA

2

-

-

... More
Where ever required, fixing of pre-fabricated bus bars of suitable sizes, including back-brace fuses and insulation painting of bus bar

-

-

-

... More
25mm2 upto including 70mm2

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.