Municipal Bodies Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 8,025Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ORULB_57331_1Tender No
JM-06/2019-20Tender Authority
Municipal Bodies ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Back Clamp for V cross Arm
2
-
80
11kv Pin Insulator (Polymer)
12
-
200
11kv HW fitting (T&C) 45 KN
12
-
130
11 KV disc insulator (T&C) 45 KN Polymer
12
-
860
HT Stay set ( complete)
6
-
1050
HT stay insulator
6
-
50
HT stay clamp ( 1.95kg/pair)
6
-
125
7/10 SWG stay wire 10kg/stay
60
-
75
Earthing support ( Coil type)
5
-
166
11 KV 95 mm 2 insulated conductor
0.026
-
95000
11 KV, 1 C x 50MM2 XLPE Cable
198
-
176
Joining kit for 50 MM2X LPE Cable
6
-
6723
Anti climbilng Device made of GI barbed wire, Clamping arrangement extra ( 2kg per support)
10
-
80
11 KV AB switch 3 pole (400 Amp)
1
-
11850
No.6 GI wire
10
-
75
100 * 50*6mm MS channel
75
-
65
75x 40x6mm MS channel
40
-
65
50x 50x6mm MS Angle
30
-
65
GI nut , Bolt & washer of different size
15
-
78
Material cost for concreting of Stay (1.65mtr x 3 mtrs x 3mtr = 0.1485 cum-PCC 1:2:4)
6
-
834
Material cost for concreting of PSC Pole (1.65mtr x 3 mtrs x 3mtr = 0.1485 cum-PCC 1:2:4)
5
-
834
Sundries for survey, tree cutting, small size nut and bolt with washer, Allm, binding tape , Danger board etc.
0.06
-
3000
3% of item No 1 to 25 (stock, storage & insurance)
1
-
4556
3% of item No 1 to 26(contigency)
1
-
4796.45
2% of item No 1 to 26 (T&p)
1
-
3197.64
7.5% OF item No 1 to 26 (transportation)
1
-
11991.13
20% Of item no 1(Erection charges of PSC pole)
1
-
3090
10% of erection charges of other items( Erection charges of other items)
1
-
14443.18
300 kg 9 mtr long PSC pole
2
-
3000
Pressure channel 100* 50* 6mm MS channel each 2.8 mtr long (9.2 kg per mtr.) *2 Nos
52
-
65
Transformer mounting channel 100* 50*6 mm MS channel each 2. 8 mtr long ( 9.2 kg per mtr) *2 nos
52
-
65
AB switch & HG fuse, mouning channel 75*40*6 each 2.80 mtr long four nos ( 6.8 kg per mtr)
76
-
65
Transformer belting Angle 50*50* 6mm-2.8mtr Long 2 Nos (4.5 kg per mtr) with side angle (Total 7 mtr)
32
-
65
Angle for mouting LT Distribution Box 50*50*6mm MS Angle-2.5 mtr each long 2 nos (4.5 kg per mtr)
23
-
65
11 kv AB Switch 3 pole (200 Amp)
1
-
7350
11 kv HG fuse 3 pole (200 Amp)
1
-
6120
11kv LA 12kv-10KA
3
-
3550
HT stay set (complete)
2
-
1050
HT stay insulator
2
-
50
HT Stay clamp
2
-
125
7 / 10 SWG Stay wire
20
-
75
GI Pipe Earthing 40 Dia medium gage 3 mtrs. Long
10
-
1050
No. 6 GI wire
20
-
75
25x5mm GI flat for neutral earthing
20
-
75
55mm2 AAAC
0.04
-
30000
Red Oxide Paint
3
-
150
All paint
4
-
200
Black paint
0.05
-
220
MS Nut, Bolt & washer
30
-
78
63 KVA, 11/0.4 KV (AL) BIS Energy Level-II
1
-
86500
LT Distribution box including Kit kat fuse with MCCB for 63KVA S/S
1
-
18322
3 & 1/2*185 mm2PVC Cable
15
-
635
Aluminium Cable shocket Different size
32
-
30
Material cost for concreting of stay (1.65mtrx.3mtrx.3mtr=0.1485cum--PCC 1:2:4)
2
-
834
Material cost for concreting of PSC pole (1.65mtrx.3mtrx.3mtr= 0.1485cum-PCC1:2:4)
2
-
834
Earthing Materials
5
-
1890
Boundary wall with Grill Gate, metal & sand
1
-
50000
Sundries for survey, PVC tape, Ampire Tape, Danger Board, small size nut & bolt preparation of drawimh cable socket etc.
1
-
2000
3% of item No 32 to 60 (Stock, storage & insurance)
1
-
7432.17
3% of item No 32 to 61 (Contigency)
1
-
7655.14
2% of item No 32 to 61 (T & P)
1
-
5103.42
7.5% of item No 32 to 61 (Transportation)
1
-
19137.84
20% Erection charges of PSC pole
1
-
1236
Erection charges of DTRs
1
-
4454.75
10% Erection charges of other items
1
-
15989.62
300 KG 9mtr long PSC pole
2
-
3000
LT stay set complete
2
-
520
7/12 SWG Stay wire
20
-
75
LT stay clamp (1.4kg/ pair)
2
-
110
LT stay Insulator
2
-
30
Pole clamp for eye hook
2
-
200
Suspension clamp
2
-
340
Nuts & bolts
1
-
78
Earthing coil each pole to Earth
1
-
166
AB Cable (3x50+1x35+1x16) mm2
0.055
-
140
Material cost for concreting of stay (1.65mtrx.3mtrx.3mtr=0.1485cum--PCC 1:2:4)
2
-
834
Material cost for concreting of PSC Pole (1.65mtrx.3mtrx.3mtr=0.1485cum-PCC1:2:4)
2
-
834
Sundries for survey, tree cutting,insulated tape, Mceal compound etc.
0.05
-
2000
3% of item No 69 to 83 ( Stock, storage & insurance)
1
-
407.63
3% of item No 69 to 84 (Contigency)
1
-
419.86
2% of item No 69 to 84( T & P)
1
-
279.91
7.5% of item No 69 to 84 (Transportation)
1
-
1049.65
20% Erection charges of PSC pole
1
-
1236
10% Erection charges of other items
1
-
781.53
10 Core 2.5mm2 Cu Control Cable ( Un-armoured)
10
-
330
11 KV LA. 12 KV-10 KA
3
-
3550
GI Pipe Earthing 40 Dia medium gage 3 mtrs. Long
3
-
1050
No.6 GI wire
20
-
75
Earthing with Materials
3
-
1890
Sundries
1
-
2000
3% from item No 92 to 95( Stock, storage & insurance)
1
-
788.1
3% from item No 92 to 95 (Contigency )
1
-
811.74
3% from item No 92 to 95 (T & P )
1
-
541.16
3% from item No 92 to 95 (Transporation)
1
-
2029.36
Erection charges of other items
1
-
2705.81
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements