Rural Development Department Tender

... More
The RDD has issued a formal invitation for competitive bids for the Rural Development Department project, for L038-middle Ambotey To Lower Ambotey Gaon And 2 Other Works As Per Nit in South Sikkim, Sikkim, with an estimated contract value of Rs. 15,62,08,000. The bid opening date for this tender is 15-06-2026 and the last date for bid submission is 20-07-2026. Interested bidders for Rural Development Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Development Department - RDD Tender - Sikkim Tender

Opening Date15 Jun 2026
Closing Date20 Jul 2026
Tender Amount₹ 15,62,08,000 
Notes
Download

Costs

Description

L038-middle Ambotey To Lower Ambotey Gaon And 2 Other Works As Per Nit

AI Insights

Unlock AI Insights for this Tender

Sign in to request AI-powered insights, eligibility criteria and automated analysis for this tender.

Corrigendums and Tender Updates

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means

1.17

41168

48167.33

... More
Filling Quantity

5973.42

86

515267.21

... More
Earthwork in Hill Road

-

-

-

... More
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1

8713.29

140

1226221.3

... More
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

2178.32

233

509029.82

... More
Embankment/Sub-Grade

-

-

-

... More
Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

2840.03

71

202636.14

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

-

-

-

... More
Sub-Grade

1420.01

245

348669.26

... More
Earthen Shoulder

458.39

245

112553.08

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

913.86

2098

1917981.95

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

784.74

2230

1750001.59

... More
BITUMINOUS WORKS

-

-

-

... More
Prime Coat

-

-

-

... More
Low porosity

-

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

7847.4375

56

442203.1

... More
Tack Coat

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

7847.4375

15

119751.9

... More
Surface Course

-

-

-

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

7847.4375

237

1865414.37

... More
Haulage

-

-

-

... More
Carriage for Stock & Non Stock Material

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

3343.01

4

13873.49

... More
Carriage on Un Surface road

96.11

4

479.59

... More
Loading & Unloading

27.86

314

8761.41

... More
b) Stone Chips For MSS

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

53672.74

4

222741.87

... More
Carriage on Un Surface road

7406.84

4

36960.13

... More
Loading & Unloading

1148.08

162

185988.96

... More
c) Stone Chips For GSB Vide Item 4a

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
53 mm to 9.5 mm @ 50 per cent

63161.63

4

262120.76

... More
9.5 mm to 2.36 mm @ 20 per cent

8716.31

4

43494.39

... More
2.36 mm below @ 30 per cent

1351.05

162

218870.1

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

1740.25

4

7222.04

... More
Carriage on Un Surface road

300.19

4

1497.95

... More
Loading & Unloading

87.01

296

25777.58

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTB

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

9905.43

4

41107.53

... More
Carriage on Un Surface road

1366.95

4

6821.08

... More
Loading & Unloading

211.88

162

34324.56

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

1621.26

4

6728.23

... More
Carriage on Un Surface road

279.67

4

1395.55

... More
Loading & Unloading

81.06

296

24014.84

... More
Throwing Of spoils obtained from the earthwork with 1km distance

-

-

-

... More
Vide item no 2b

-

-

-

... More
Carriage on Un Surface road

6012.17

4

30000.73

... More
Loading & Unloading

3267.48

85

279304.19

... More
ROAD SIGNAGE

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm.The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

12991

12991.39

... More
Fixing of citizen board

2

12991

25982.78

... More
Maintenance Information board

1

12991

12991.39

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

8

7734

61872.88

... More
ii) 600mm Circular

3

4845

14536.29

... More
Ordinary Kilometer Stone (Precast)

3

2432

7298.94

... More
200 m stone (precast)

8

722

5779.2

... More
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting,2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

4

17388

69553.48

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface,including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

406.1

249

101435.66

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)

-

-

-

300

4457

1337217

... More
Slip Clearance

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side (to be paid on actual)

12627.25

39

501806.92

... More
Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

1794

1021

1833234.78

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

1158.92

4

4809.52

... More
Carriage on Un Surface road

199.91

4

997.55

... More
Loading & Unloading

57.95

296

17168.27

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

3878.63

4

16096.31

... More
Carriage on Un Surface road

535.25

4

2670.9

... More
Loading & Unloading

84.32

85

7207.67

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

7883.73

4

32717.48

... More
Carriage on Un Surface road

1087.96

4

5428.92

... More
Loading & Unloading

168.64

162

27319.68

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

13320.45

4

55279.87

... More
Carriage on Un Surface road

1838.22

4

9172.72

... More
Loading & Unloading

242.19

162

39234.78

... More
Breast Wall

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

751.19

469

352503.42

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

38.46

1076

41383.73

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

38.46

5039

193808.4

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

627.02

4608

2889477.46

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 Sandy Material

77.04

1280

98613.51

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

192.6

1287

247997.54

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

212

337

71528.8

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

2088

4

8665.2

... More
Carriage on Un Surface road

156.6

4

781.43

... More
Loading & Unloading

104.4

296

30929.54

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

13102.44

4

54375.13

... More
Carriage on Un Surface road

786.15

4

3922.89

... More
Loading & Unloading

284.84

85

24348.12

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

9343.76

4

38776.6

... More
Carriage on Un Surface road

560.63

4

2797.54

... More
Loading & Unloading

199.87

162

32378.94

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

26150.04

4

108522.67

... More
Carriage on Un Surface road

1569

4

7829.31

... More
Loading & Unloading

475.46

162

77024.52

... More
Retaining Wall(3M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

257.4

469

120787.52

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

36.72

1076

39511.45

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

36.72

5039

185040.16

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

437.4

4608

2015657.3

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

238.5

1356

323525.25

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

190.8

1287

245679.8

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

238

337

80301.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1500

4

6225

... More
Carriage on Un Surface road

258.75

4

1291.16

... More
Loading & Unloading

75

296

22219.5

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

7252.53

4

30098

... More
Carriage on Un Surface road

1000.85

4

4994.24

... More
Loading & Unloading

157.66

85

13476.78

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

18672.97

4

77492.83

... More
Carriage on Un Surface road

2576.87

4

12858.58

... More
Loading & Unloading

399.42

162

64706.04

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

18758.52

4

77847.86

... More
Carriage on Un Surface road

1125.51

4

5616.29

... More
Loading & Unloading

341.06

162

55251.72

... More
Retaining Wall(4M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

74.88

469

35138.19

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

13.39

1076

14407.91

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

13.39

5039

67475.16

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

195.2

4608

899534.3

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

43.8

1356

59414.7

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

70.08

1287

90237.11

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

62

337

20918.8

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

656

4

2722.4

... More
Carriage on Un Surface road

113.16

4

564.67

... More
Loading & Unloading

32.8

296

9717.33

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

3171.86

4

13163.22

... More
Carriage on Un Surface road

437.72

4

2184.22

... More
Loading & Unloading

68.95

85

5893.85

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Carriage on Surface road

-

-

-

... More
Carriage on Un Surface road

5113.82

4

21222.35

... More
Loading & Unloading

705.71

4

3521.49

... More
Carriage of Non- stock materials by mechanical means(Stone):

109.39

162

17721.18

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

8214.93

4

34091.96

... More
Carriage on Un Surface road

492.9

4

2459.57

... More
Loading & Unloading

149.36

162

24196.32

... More
RCC SLAB CULVERT(1MX1M)

-

-

-

... More
At RD-0/395,0/806,0/980,1/230,1/345,1/600,1/890, , ,

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth

561.89

469

263672.5

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

12.78

1076

13751.54

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.05

5039

161507

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

360.43

5051

1820798.65

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:3) Coursed Rubble masonry 1st sort)

285.3

4871

1389861.77

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

107.11

4062

435123.66

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

23.52

7223

169905.19

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

2.72

91002

247526.23

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

112

337

37788.8

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

84

260

21892.08

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

60.48

1356

82041.12

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

3811.22

4

15816.56

... More
Carriage on Un Surface road

657.44

4

3280.63

... More
Loading & Unloading

190.56

296

56455.31

-

-

-

... More
Carriage on Surface road

54.46

4

226.01

... More
Carriage on Un Surface road

9.39

4

46.86

... More
Loading & Unloading

2.72

331

900.92

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

16820.55

4

69805.28

... More
Carriage on Un Surface road

2321.24

4

11582.99

... More
Loading & Unloading

365.66

85

31256.62

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

18661.46

4

77445.06

... More
Carriage on Un Surface road

2575.28

4

12850.65

... More
Loading & Unloading

399.18

162

64667.16

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

15775.47

4

65468.2

... More
Carriage on Un Surface road

2177.01

4

10863.28

... More
Loading & Unloading

286.83

162

46466.46

... More
MRL26-link road from deorali dara to lower gom primary school

-

-

-

... More
Pavement Works

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.

2.06

41168

84807.44

... More
Filling Quantity

4448.8

86

383753.49

... More
Earthwork in Hill Road

-

-

-

... More
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1

55760.94

140

7847237.09

... More
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

13940.24

233

3257555.28

... More
Embankment/Sub-Grade

-

-

-

... More
Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

4872.08

71

347622.91

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

-

-

-

... More
Sub-Grade

2436.04

245

598145.26

... More
Earthen Shoulder

786.37

245

193085.29

... More
SUB-BASE

-

-

-

-

-

-

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

-

-

-

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

1567.73

2098

3290304.69

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

1346.23

2230

3002146.75

... More
BITUMINOUS WORKS

-

-

-

... More
Prime Coat

-

-

-

... More
Low porosity

-

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

13462.3125

56

758601.31

... More
Tack Coat

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

13462.3125

15

205434.89

... More
Surface Course

-

-

-

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
By Manual Means (II) Bitumen (S-65)

13462.3125

237

3200126.3

... More
Haulage

-

-

-

... More
Carriage for Stock & Non Stock Material

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

5185.35

4

21519.2

... More
Carriage on Un Surface road

71.69

4

357.73

... More
Loading & Unloading

47.79

314

15029

... More
b) Stone Chips For MSS

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

15973.24

4

66288.95

... More
Carriage on Un Surface road

1019.57

4

5087.65

... More
Loading & Unloading

363.48

162

58883.76

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

4254.2

4

17654.93

... More
Carriage on Un Surface road

223.91

4

1117.31

... More
Loading & Unloading

149.27

296

44222.73

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTB

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

86551.27

4

359187.77

... More
Carriage on Un Surface road

5524.55

4

27567.5

... More
Loading & Unloading

1969.54

162

319065.48

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

3963.32

4

16447.78

... More
Carriage on Un Surface road

208.6

4

1040.91

... More
Loading & Unloading

139.06

296

41197.92

... More
b) Stone Chips For CTSB

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

101852.81

4

422689.16

... More
Carriage on Un Surface road

6501.24

4

32441.19

... More
Loading & Unloading

2317.73

162

375472.26

... More
Throwing Of spoils obtained from the earthwork with 1km distance

-

-

-

... More
Vide item no 2b

-

-

-

... More
Carriage on Un Surface road

30780.04

4

153592.4

... More
Loading & Unloading

16728.28

85

1429933.37

... More
ROAD SIGNAGE

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm.The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

12991

12991.39

... More
Fixing of citizen board

2

12991

25982.78

... More
Maintenance Information board

1

12991

12991.39

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

14

7734

108277.54

... More
ii) 600mm Circular

5

4845

24227.15

... More
Ordinary Kilometer Stone (Precast)

5

2432

12164.9

... More
200 m stone (precast)

14

722

10113.6

... More
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting,2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

7

17388

121718.59

... More
Edge line marking

-

-

-

... More
Stop line marking

-

-

-

691.3

249

172672.91

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)

-

-

-

300

4457

1337217

... More
Slip Clearance

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side (to be paid on actual)

12938.35

39

514170.03

... More
Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

3077.1

1021

3144396.18

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

2832.62

4

11755.37

... More
Carriage on Un Surface road

149.09

4

743.96

... More
Loading & Unloading

99.39

296

29445.28

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

6253.53

4

25952.15

... More
Carriage on Un Surface road

399.16

4

1991.81

... More
Loading & Unloading

144.62

85

12362.12

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

10535.84

4

43723.74

... More
Carriage on Un Surface road

672.5

4

3355.78

... More
Loading & Unloading

289.25

162

46858.5

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

21476.62

4

89127.97

... More
Carriage on Un Surface road

1370.85

4

6840.54

... More
Loading & Unloading

415.41

162

67296.42

... More
BREAST WALL 2M

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

761.3

469

357247.64

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

48.95

1076

52671.18

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

48.95

5039

246669.82

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

646.08

4608

2977311.08

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 Sandy Material

104.64

1280

133942.34

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

192

1287

247224.96

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

159

337

53646.6

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

3124.15

4

12965.22

... More
Carriage on Un Surface road

164.43

4

820.51

... More
Loading & Unloading

109.62

296

32476.02

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

13808.37

4

57304.74

... More
Carriage on Un Surface road

881.39

4

4398.14

... More
Loading & Unloading

319.34

85

27297.18

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

9193.89

4

38154.64

... More
Carriage on Un Surface road

586.84

4

2928.33

... More
Loading & Unloading

209.21

162

33892.02

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

25785.84

4

107011.24

... More
Carriage on Un Surface road

1645.9

4

8213.04

... More
Loading & Unloading

498.76

162

80799.12

... More
BREAST WALL 3M

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

1123.28

469

527110.37

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

57.52

1076

61892.67

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

57.52

5039

289855.93

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

937.6

4608

4320713.95

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 Sandy Material

115.2

1280

147459.46

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

288

1287

370837.44

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

318

337

107293.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

4448.85

4

18462.73

... More
Carriage on Un Surface road

234.15

4

1168.41

... More
Loading & Unloading

156.1

296

46246.19

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

18416.89

4

76430.09

... More
Carriage on Un Surface road

1175.55

4

5865.99

... More
Loading & Unloading

425.92

85

36407.64

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

13133.66

4

54504.69

... More
Carriage on Surface road

838.32

4

4183.22

... More
Carriage on Un Surface road

298.87

162

48416.94

... More
Loading & Unloading

-

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

36756.69

4

152540.26

... More
Carriage on Surface road

2346.17

4

11707.39

... More
Carriage on Un Surface road

710.96

162

115175.52

... More
Loading & Unloading

-

-

-

... More
Plum Wall

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

37.56

469

17625.41

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

12.96

1076

13945.22

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete

204.9

4062

832385.76

... More
Carriage of Stock Materials

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

554.77

4

2302.3

... More
Carriage on Un Surface road

29.2

4

145.71

... More
Loading & Unloading

19.47

296

5768.18

... More
Carriage of Non- stock materials by mechanical means(Sand):

-

-

-

... More
Taking density of wet sand:1840kg/m3

-

-

-

... More
Carriage on Surface road

1169.51

4

4853.47

... More
Carriage on Un Surface road

74.65

4

372.5

... More
Loading & Unloading

27.05

85

2312.23

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

8051.8

4

33414.97

... More
Carriage on Un Surface road

513.94

4

2564.56

... More
Loading & Unloading

155.74

162

25229.88

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

2377.16

4

9865.21

... More
Carriage on Un Surface road

151.73

4

757.13

... More
Loading & Unloading

54.09

162

8762.58

... More
Retaining Wall(2M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

187.2

469

87845.47

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

34.32

1076

36929.01

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

34.32

5039

172946.03

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

275.2

4608

1268195.9

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

316.8

1356

429739.2

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

158.4

1287

203960.59

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

159

337

53646.6

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1416.45

4

5878.27

... More
Carriage on Un Surface road

74.55

4

372

... More
Loading & Unloading

49.7

296

14724.12

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

4517.27

4

18746.67

... More
Carriage on Un Surface road

288.34

4

1438.82

... More
Loading & Unloading

104.47

85

8930.1

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

19167.97

4

79547.08

... More
Carriage on Un Surface road

1223.49

4

6105.22

... More
Loading & Unloading

436.18

162

70661.16

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

11645.11

4

48327.21

... More
Carriage on Un Surface road

743.31

4

3709.12

... More
Loading & Unloading

225.24

162

36488.88

... More
Retaining WALL (3M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

321.75

469

150984.4

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

45.9

1076

49389.32

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

45.9

5039

231300.2

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

546.75

4608

2519571.62

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

298.125

1356

404406.56

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

238.5

1287

307099.76

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

298

337

100545.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

2673.3

4

11094.2

... More
Carriage on Un Surface road

140.7

4

702.09

... More
Loading & Unloading

93.8

296

27789.19

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

8521.73

4

35365.18

... More
Carriage on Surface road

543.94

4

2714.26

... More
Carriage on Un Surface road

197.08

85

16846.4

... More
Loading & Unloading

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

21940.74

4

91054.07

... More
Carriage on Un Surface road

1400.47

4

6988.35

... More
Loading & Unloading

499.28

162

80883.36

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

22041.26

4

91471.23

... More
Carriage on Un Surface road

1406.89

4

7020.38

... More
Loading & Unloading

426.33

162

69065.46

... More
RCC SLAB CULVERT(1MX1M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth

722.43

469

339007.5

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

16.43

1076

17679.01

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

41.2

5039

207615.86

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

463.41

5051

2341026.83

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:3) Coursed Rubble masonry 1st sort)

366.81

4871

1786944.26

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

137.72

4062

559473.73

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

30.24

7223

218449.53

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

3.5

91002

318508.01

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

144

337

48585.6

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

108

260

28146.96

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

77.76

1356

105481.44

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

6982.7

4

28978.21

... More
Carriage on Un Surface road

367.51

4

1833.87

... More
Loading & Unloading

245.01

296

72586.66

-

-

-

... More
Carriage on Surface road

99.78

4

414.09

... More
Carriage on Un Surface road

5.25

4

26.2

... More
Loading & Unloading

3.5

331

1159.27

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

20328.84

4

84364.69

... More
Carriage on Un Surface road

1297.59

4

6474.97

... More
Loading & Unloading

470.14

85

40187.57

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

22553.71

4

93597.9

... More
Carriage on Un Surface road

1439.6

4

7183.6

... More
Loading & Unloading

513.23

162

83143.26

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

19065.78

4

79122.99

... More
Carriage on Un Surface road

1216.96

4

6072.63

... More
Loading & Unloading

368.78

162

59742.36

... More
RCC SLAB CULVERT(2MX2M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth

85.26

469

40009.11

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

3.15

1076

3389.46

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

7.9

5039

39809.84

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

67.38

5051

340386.24

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:3) Coursed Rubble masonry 1st sort)

51.31

4871

249960.77

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

15.3

4062

62154.72

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

4.62

7223

33374.23

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

0.54

91002

49141.24

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

16

337

5398.4

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

12

260

3127.44

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

8.64

1356

11720.16

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1009.53

4

4189.55

... More
Carriage on Un Surface road

53.13

4

265.12

... More
Loading & Unloading

35.42

296

10493.53

-

-

-

... More
Carriage on Surface road

15.3

4

63.5

... More
Carriage on Un Surface road

0.81

4

4.04

... More
Loading & Unloading

0.54

331

178.86

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

2357.08

4

9781.88

... More
Carriage on Surface road

150.45

4

750.75

... More
Carriage on Un Surface road

54.51

85

4659.51

... More
Loading & Unloading

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

3767.36

4

15634.54

... More
Carriage on Un Surface road

240.47

4

1199.95

... More
Loading & Unloading

85.73

162

13888.26

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

2565.61

4

10647.28

... More
Carriage on Un Surface road

163.76

4

817.16

... More
Loading & Unloading

49.63

162

8040.06

... More
3. T10-SIKKIP TO MANGBA BUSTY.

-

-

-

... More
Pavement Works

-

-

-

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.

3.66

41168

150677.3

... More
Filling Quantity

5944.53

86

512775.16

... More
Earthwork in Hill Road

-

-

-

... More
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1

65600.36

140

9231938.66

... More
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

16400.09

233

3832373.03

... More
Embankment/Sub-Grade

-

-

-

... More
Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

5775.53

71

412084.07

... More
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1

-

-

-

... More
Sub-Grade

2887.76

245

709060.59

... More
Earthen Shoulder

932.19

245

228889.93

... More
SUB-BASE

-

-

-

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

1858.44

2098

3900438.12

... More
BASE LAYER

-

-

-

-

-

-

... More
Cement Treated Crushed Rock or combination as per clause 403 and Table in Sub-base/base, Providing, Laying and spreading Material on a prepared sub-base,adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with motor grade and compactig with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base (With Referance with Section 400 Clause 401.2.2 Table 400-4 cement, Clause 401.2.2 Table 400-1, Grading

1595.87

2230

3558853.93

... More
BITUMINOUS WORKS

-

-

-

... More
Prime Coat

-

-

-

... More
Low porosity

-

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

15958.6875

56

899272.04

... More
Tack Coat

-

-

-

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per TechnicalSpecification Clause 503.

15958.6875

15

243529.57

... More
Surface Course

-

-

-

-

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

-

-

-

... More
By Manual Means (II) Bitumen (S-65)

15958.6875

237

3793539.61

... More
Haulage

-

-

-

... More
Carriage for Stock & Non Stock Material

-

-

-

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Bitumen/Emulsion)

-

-

-

... More
Carriage on Surface road

6515.13

4

27037.79

... More
Carriage on Un Surface road

163.16

4

814.17

... More
Loading & Unloading

56.65

314

17815.29

... More
b) Stone Chips For MSS

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

16115.08

4

66877.58

... More
Carriage on Un Surface road

2320.57

4

11579.64

... More
Loading & Unloading

430.88

162

69802.56

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (5% of Cement in CTB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

2831.2

4

11749.48

... More
Carriage on Un Surface road

509.62

4

2543

... More
Loading & Unloading

176.95

296

52423.21

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading.

-

-

-

... More
a) Stone Chips For CTB

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

76397.43

4

317049.33

... More
Carriage on Un Surface road

11001.23

4

54896.14

... More
Loading & Unloading

2042.71

162

330919.02

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement) (4% of Cement in CTSB)

-

-

-

... More
Taking the density of cement=1440kg/m3

-

-

-

... More
Carriage on Surface road

2637.62

4

10946.12

... More
Carriage on Un Surface road

474.77

4

2369.1

... More
Loading & Unloading

164.85

296

48838.46

... More
b) Stone Chips For CTSB

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

88967.35

4

369214.5

... More
Carriage on Un Surface road

12811.3

4

63928.39

... More
Loading & Unloading

2378.81

162

385367.22

... More
ROAD SIGNAGE

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm.The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

12991

12991.39

... More
Fixing of citizen board

1

12991

12991.39

... More
Maintenance Information board

1

12991

12991.39

... More
Fixing of road cautionary Sign

-

-

-

... More
i) 900mm equilateral triangle

16

7734

123745.76

... More
ii) 600mm Circular

5

4845

24227.15

... More
Ordinary Kilometer Stone (Precast)

5

2432

12164.9

... More
200 m stone (precast)

16

722

11558.4

... More
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting,2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

8

17388

139106.96

... More
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface,including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702

-

-

-

... More
Edge line marking

-

-

-

... More
Stop line marking

-

-

-

818.1

249

204345.02

... More
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)

-

-

-

345

4457

1537799.55

... More
Slip Clearance

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side (to be paid on actual)

16400

39

651736

... More
Drain

-

-

-

... More
Providing and laying standard 'V' shaped drain with cement concrete base in 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 20mm and down) mix of 100mm thick over clean hard selected stones soling of 150mm thick and 1:2:4 (1 cement, 2 clean coarse sand, 4 stone chips 40mm and down) mix plum vertical side of thickness 150mm and depth 450mm including curing, compacting, as per the direction of Engineer - in - Charge.

3647.7

1021

3727475.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading

-

-

-

... More
Carriage on Surface road

1885.13

4

7823.29

... More
Carriage on Un Surface road

339.32

4

1693.21

... More
Loading & Unloading

117.82

296

34905.35

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

6309.06

4

26182.6

... More
Carriage on Un Surface road

908.5

4

4533.41

... More
Loading & Unloading

171.44

85

14654.69

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

12823.85

4

53218.98

... More
Carriage on Un Surface road

1846.63

4

9214.68

... More
Loading & Unloading

342.88

162

55546.56

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

21667.34

4

89919.46

... More
Carriage on Un Surface road

3120.1

4

15569.3

... More
Loading & Unloading

492.44

162

79775.28

... More
BREAST WALL 2M

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

428.23

469

200951.21

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

27.53

1076

29622.83

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

27.53

5039

138729.73

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

363.42

4608

1674737.48

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 Sandy Material

58.86

1280

75342.57

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

108

1287

139064.04

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

89

337

30028.6

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

986.57

4

4094.27

... More
Carriage on Un Surface road

177.58

4

886.12

... More
Loading & Unloading

61.66

296

18267.39

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

6610.39

4

27433.12

... More
Carriage on Un Surface road

951.9

4

4749.98

... More
Loading & Unloading

179.63

85

15354.77

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

-

-

-

... More
Carriage on Surface road

4401.33

4

18265.52

... More
Carriage on Un Surface road

633.79

4

3162.61

... More
Loading & Unloading

117.68

162

19064.16

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

-

-

-

... More
Carriage on Surface road

12344.29

4

51228.8

... More
Carriage on Un Surface road

1777.58

4

8870.12

... More
Loading & Unloading

280.55

162

45449.1

... More
BREAST WALL 3M

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

1614.715

469

757721.16

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

82.68

1076

88965.33

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

82.68

5039

416642.71

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

1347.8

4608

6211026.31

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 Sandy Material

165.6

1280

211972.97

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

414

1287

533078.82

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

458

337

154529.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

3590.4

4

14900.16

... More
Carriage on Un Surface road

646.27

4

3224.89

... More
Loading & Unloading

224.4

296

66480.74

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the avarage density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

22531.3

4

93504.9

... More
Carriage on Un Surface road

3244.51

4

16190.1

... More
Loading & Unloading

612.26

85

52335.98

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone Chips

-

-

-

... More
Taking the density of stone chips=1870kg/m3

16067.78

4

66681.29

... More
Carriage on Surface road

2313.76

4

11545.66

... More
Carriage on Un Surface road

429.62

162

69598.44

... More
Loading & Unloading

-

-

-

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading Of Stone

-

-

-

... More
Taking the avarage density of Stone=2200kg/m3

44968.29

4

186618.4

... More
Carriage on Surface road

6475.43

4

32312.4

... More
Carriage on Un Surface road

1022.01

162

165565.62

... More
Retaining Wall(3M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

257.4

469

120787.52

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

36.72

1076

39511.45

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

36.72

5039

185040.16

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

437.4

4608

2015657.3

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

238.5

1356

323525.25

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

190.8

1287

245679.8

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

238

337

80301.2

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1200

4

4980

... More
Carriage on Un Surface road

216

4

1077.84

... More
Loading & Unloading

75

296

22219.5

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

5802.03

4

24078.42

... More
Carriage on Un Surface road

835.49

4

4169.1

... More
Loading & Unloading

157.66

85

13476.78

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

14938.38

4

61994.28

... More
Carriage on Un Surface road

2151.13

4

10734.14

... More
Loading & Unloading

399.42

162

64706.04

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

15006.82

4

62278.3

... More
Carriage on Un Surface road

2160.98

4

10783.29

... More
Loading & Unloading

341.06

162

55251.72

... More
Retaining WALL (4M)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material

372.06

469

174592.88

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

66.54

1076

71598.37

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)

66.54

5039

335309.7

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:3)

969.9

4608

4469561.07

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

217.63125

1356

295216.79

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

348.21

1287

448365.64

... More
Providing weepholes in brick masonry/stone masonry, plain /reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

316

337

106618.4

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

2608

4

10823.2

... More
Carriage on Un Surface road

469.44

4

2342.51

... More
Loading & Unloading

163

296

48290.38

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

12608.14

4

52323.78

... More
Carriage on Surface road

1815.57

4

9059.69

... More
Carriage on Un Surface road

342.61

85

29286.3

... More
Loading & Unloading

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

20327.43

4

84358.83

... More
Carriage on Un Surface road

2927.15

4

14606.48

... More
Loading & Unloading

543.51

162

88048.62

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

32654.35

4

135515.55

... More
Carriage on Un Surface road

4702.23

4

23464.13

... More
Loading & Unloading

742.14

162

120226.68

... More
RCC SLAB CULVERTS-(1 x 1 x 1)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth

1043.51

469

489677.5

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

23.73

1076

25533.95

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

59.51

5039

299883.98

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

669.37

5051

3381483.2

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:3) Coursed Rubble masonry 1st sort)

529.84

4871

2581157.95

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

198.92

4062

808092.61

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

43.68

7223

315538.2

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

5.06

91002

460471.59

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

208

337

70179.2

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

156

260

40656.72

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

112.32

1356

152362.08

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

5665.57

4

23512.12

... More
Carriage on Un Surface road

1019.8

4

5088.8

... More
Loading & Unloading

354.1

296

104905.67

-

-

-

... More
Carriage on Surface road

80.91

4

335.78

... More
Carriage on Un Surface road

14.56

4

72.65

... More
Loading & Unloading

5.06

331

1675.97

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

-

-

-

... More
Carriage on Surface road

25012.49

4

103801.83

... More
Carriage on Un Surface road

3601.8

4

17972.98

... More
Loading & Unloading

679.69

85

58099.9

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

27747.92

4

115153.87

... More
Carriage on Un Surface road

3995.7

4

19938.54

... More
Loading & Unloading

741.92

162

120191.04

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

23437.84

4

97267.04

... More
Carriage on Un Surface road

3375.05

4

16841.5

... More
Loading & Unloading

532.68

162

86294.16

... More
RCC SLAB CULVERTS (1 x 2 x2)

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth

170.52

469

80018.22

... More
Providing and laying hand packed stone soling in buildings works with clean hard selected stones all complete. Details for 10cum. (manual means)

6.31

1076

6789.69

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

15.8

5039

79619.68

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

134.76

5051

680772.48

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:3) Coursed Rubble masonry 1st sort)

102.62

4871

499921.54

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

30.6

4062

124309.44

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

9.24

7223

66748.47

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

1.07

91002

97372.45

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

32

337

10796.8

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

24

260

6254.88

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause Granular material

17.28

1356

23440.32

... More
Cost of Haulage for Stock materials Excluding Loading and Unloading(Cement)

-

-

-

... More
Carriage on Surface road

1134

4

4706.1

... More
Carriage on Un Surface road

204.12

4

1018.56

... More
Loading & Unloading

70.88

296

20998.91

-

-

-

... More
Carriage on Surface road

17.18

4

71.3

... More
Carriage on Un Surface road

3.09

4

15.42

... More
Loading & Unloading

1.07

331

354.41

... More
Cost of Haulage for Non-Stock materials Excluding Loading and Unloading (Sand)

-

-

-

... More
Taking the density of sand=1840kg/m3

4015.43

4

16664.03

... More
Carriage on Surface road

578.22

4

2885.32

... More
Carriage on Un Surface road

109.11

85

9326.72

... More
Loading & Unloading

-

-

-

... More
Carriage of Non- stock materials by mechanical means(Stone chips):

-

-

-

... More
Taking the average density of stone chips = 1870kg/cum

-

-

-

... More
Carriage on Surface road

6415.95

4

26626.19

... More
Carriage on Un Surface road

923.9

4

4610.26

... More
Loading & Unloading

171.55

162

27791.1

... More
Carriage of Non- stock materials by mechanical means(Stone):

-

-

-

... More
Taking density of Stone :2200kg/m3

-

-

-

... More
Carriage on Surface road

4367

4

18123.05

... More
Carriage on Un Surface road

628.85

4

3137.96

... More
Loading & Unloading

99.25

162

16078.5



Evaluation Notes How It Works ?

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.