Border Roads Organisation Tender
... More
The BRO has issued a formal invitation for competitive bids for the Border Roads Organisation project, for Consultancy Services For Carrying Out Feasibility Study And Preparation Of Dpr For Construction/improvement From Cl-9 To Nhdl Specifications On Epc Mode From Km 10.00 To Km 32.70 On Singtham-dikchu Road And From Km 0 To Km 7.360 On Dikchu-rangrang in East Sikkim, Sikkim, with an estimated contract value of Rs. 1,95,86,112. The bid opening date for this tender is 04-10-2018 and the last date for bid submission is 20-10-2018. Interested bidders for Border Roads Organisation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 5,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Consultancy Services For Carrying Out Feasibility Study And Preparation Of Dpr For Construction/improvement From Cl-9 To Nhdl Specifications On Epc Mode From Km 10.00 To Km 32.70 On Singtham-dikchu Road And From Km 0 To Km 7.360 On Dikchu-rangrang
Contact
Tender Id
2018_BRO_391089_1Bid Award Id
ViewTender No
80444R/E8Tender Authority
Border Roads Organisation ViewPurchaser Address
-Website
http://www.bro.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT FROM CL-9 TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0 TO KM 7.360 ON DIKCHU-RANGRANG
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT FROM CL-9 TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0 TO KM 7.360 ON DIKCHU-RANGRANG
CONSULTANCY SERVICES FOR CARRYING OUT FEASIBILITY STUDY AND PREPARATION OF DPR FOR CONSTRUCTION/IMPROVEMENT FROM CL-9 TO NHDL SPECIFICATIONS ON EPC MODE FROM KM 10.00 TO KM 32.70 ON SINGTHAM-DIKCHU ROAD AND FROM KM 0 TO KM 7.360 ON DIKCHU-RANGRANG
BOQ Items
... More
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
-
-
-
... More
Full Name and Position
1
-
-
... More
Road and Bridge Inventory
1
-
-
... More
LA & Clearances II Report
6
-
-
... More
Strip Plan with L.A. Reports
6
-
-
... More
Fill Name and Position
1
-
-
... More
Final LA and Clearances I Report
4
-
-
... More
GST
1
-
-
... More
Senior Bridge Engineer
3
-
-
... More
Office Furniture and Equipment
1
-
-
... More
Full Name and Position
1
-
-
... More
Position
1
-
-
... More
Fill Name and Position
1
-
-
... More
(Total cost Excluding GST)
-
-
-
... More
Traffic and Safety Expert
3
-
-
... More
Topographic Survey including hire
charges for equipment and supply of
survey teams comprising of project
survey filed staff etc. inclusive of cost
of materials, labour
30.06
-
-
... More
Survey and Investigation
Topographical Survey (Fixed Rate)
-
-
-
... More
Boring in hard rock
200
-
-
... More
Material-cum-Geotechnical
Engineer- Geologist
3.5
-
-
... More
Environmental Specialist
2
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
6
-
-
... More
Roughness Survey
1
-
-
... More
Reports and Document Printing
-
-
-
... More
Material Survey and Investigation
1
-
-
... More
Fill Name and Position
1
-
-
... More
Office Manager
1
-
-
... More
BBD Test and Pavement Evaluation
1
-
-
... More
Position
1
-
-
... More
Position
1
-
-
... More
Office Furniture and Equipment (Rental)
-
-
-
... More
Team Leader cum Senior
Highway Engineer
5.5
-
-
... More
Transportation (Fixed costs)
-
-
-
... More
Sub-Professional Staff (To be assessed by Consultant as per requirement of assignment)
-
-
-
... More
Draft Feasibility Report
4
-
-
... More
Remuneration of Expatriate Staff including per diem allowances
-
-
-
... More
Full Name and Position
1
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Boring in all type of soils (other than hard rock)
1500
-
-
... More
Sub-grade Investigation
1
-
-
... More
Any other investigations/surveys
1
-
-
... More
Fill Name and Position
1
-
-
... More
Remuneration for Local Staff (including per diem allowance)
-
-
-
... More
Draft LA and Clearances I Report
4
-
-
... More
Monthly Report (3 copies per month)
18
-
-
... More
Taxes and Duties
-
-
-
... More
The vehicles provided by the
Consultants shall include the cost for
rental, drivers, operation,
maintenance, repairs, insurance, etc.
6
-
-
... More
Land Acquisition Studies
1
-
-
... More
Fill Name and Position
1
-
-
... More
Support Staff (To be assessed by Consultant as per requirement of assignment)
-
-
-
... More
Final Environmental Assessment
report & RAP
6
-
-
... More
Full Name and Position
1
-
-
... More
Import duties
1
-
-
... More
Draft Environmental Assessment
report & RAP
4
-
-
... More
Mobilization and Demobilization, Inland Travel in Home Country (Fixed Costs)
1
-
-
... More
Senior Survey Engineer
4
-
-
... More
Office Supplies Drafting
6
-
-
... More
Environment and Social Impact
Screening Report
4
-
-
... More
Estimate of Costs for Expatriate Consultants (in Indian Rupees) (Name and position to be filled in below columns by the bidder)
-
-
-
... More
Domestic and International
Communication
6
-
-
... More
Draft Detailed Design Report &
Drawings etc. Draft EMP
4
-
-
... More
Supplies Computer
6
-
-
... More
Office Boy
1
-
-
... More
Traffic Survey
1
-
-
... More
Position
1
-
-
... More
Income Tax (Expatriate)
1
-
-
... More
Highway cum Pavement
Engineer
3
-
-
... More
Mobilization and Demobilization, International Airfares (Fixed costs) (To be filled by bidders in below columns)
-
-
-
... More
Detailed topographic surveys using
mobile/ aerial LiDAR or equivalent
technology
30.06
-
-
... More
Full Name and Position
1
-
-
... More
Draft Bidding Documents
4
-
-
... More
Full Name and Position
1
-
-
... More
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
1
-
-
... More
Socio-economic & Census
Survey/Studies
1
-
-
... More
Quantity Surveyor/
Documentation Expert
3.5
-
-
... More
Final Bidding Documents
6
-
-
... More
Typist
1
-
-
... More
Land Acquisition Expert
6
-
-
... More
Final Feasibility Report
6
-
-
... More
Position
1
-
-
... More
Position
1
-
-
... More
Night Watchman
1
-
-
... More
Running Costs
6
-
-
... More
Draft 3(a) ,3(A) and 3(D)
notification for land acquisition
( 3 copies each)
9
-
-
... More
Trips
6
-
-
... More
Duty Travel to Site (Fixed Costs)
-
-
-
... More
Office Rent
6
-
-
... More
Inception Report & QAP
3
-
-
... More
Value added tax
1
-
-
... More
Sub-Soil Investigation (Boring)
-
-
-

