Command Area Development Authority Tender
... More
The CADA has issued a formal invitation for competitive bids for the Command Area Development Authority project, for Construction Of Road From (i)shintri Farm Field To Manjunath Bandakkanavar Farm Field In Badli Village Of Savadathi Taluk (ii) Basappa Bangi Farm Field To Sachin Enagi Farm Field In Koravikoppa Village Of Bailhongal Taluk in Gadag, Karnataka, with an estimated contract value of Rs. 32,25,000. The bid opening date for this tender is 27-10-2026 and the last date for bid submission is 11-11-2026. Interested bidders for Command Area Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Command Area Development Authority - CADA Tender - Karnataka Tender
Opening Date27 Oct 2026
Closing Date11 Nov 2026
Tender Amount₹ 32,25,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 64,500Document Cost
Refer DocumentsTender Fee
₹ 1,610
Summary
Construction Of Road From (i)shintri Farm Field To Manjunath Bandakkanavar Farm Field In Badli Village Of Savadathi Taluk (ii) Basappa Bangi Farm Field To Sachin Enagi Farm Field In Koravikoppa Village Of Bailhongal Taluk
Description
Construction Of Road From (i)shintri Farm Field To Manjunath Bandakkanavar Farm Field In Badli Village Of Savadathi Taluk (ii) Basappa Bangi Farm Field To Sachin Enagi Farm Field In Koravikoppa Village Of Bailhongal Taluk.
Corrigendums and Tender Updates
Contact
Tender Id
MGCADA/2026-27/RD/WORK_INDENT167Tender No
MGCADA/2026-27/RD/WORK_INDENT167Tender Authority
Command Area Development Authority ViewPurchaser Address
-Website
http://cadaharyana.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Instructions to Tenderers
BOQ Items
... More
2023-24 Volume - 3 , It. No. 16.17, Page No. 147 - Laying Cement Concrete Pipe NP3 (burried conduits) of 500mm dia on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets
10
2721
27216
... More
2023-24 Volume -2 , It. No. 5.1.1 , Page No. 9 - Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) etc as directed by the Engineer incharge of work
12
5891
70698.6
... More
2023-24 Volume - 1 , It. No. 1.14.1 , Page No. 8 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
18
107
1927.8
... More
2023-24 Volume - 1 It. No. 2.1.3 , Page No. 15 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates
3
6511
19533.15
... More
PWD SR 2023-24 Volume3Pg. No.17Item No.3.7 - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
3099
110
341664.75
... More
2023-24 Volume - 3 , It. No. 16.15 , Page No. 145 - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. etc as directed by the Engineer incharge of work 1000 mm dia
20
8355
167118

