Rural Development Department Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

Rural Development Department - RDD Tender

Works
Eprocure
Opening Date16 Nov 2024
Closing Soon22 Nov 2024
Tender Amount₹ 19,29,564 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Decoration of inside of theme/policy pavilion with ply wood, cloth, flex (colour and design of flex will be as per direction of authority) on wooden and bamboo frame incl. fitting fixing complete on hire basis. (Only cloth area/flex area will be measured for payment) (New cloth must be used)

2050

-

-

... More
Hiring charges of M.S collapsible gate including fitting fixing in position with locking position including necessary accessories and carrying loading unloading complete for mela period as per direction of engineer-in-charge.

56

-

-

... More
Hiring Charges of plastic Table with cover for whole mela period including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

400

-

-

... More
Hiring Charges of plastic chair including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

11800

-

-

... More
Hiring Charges of carpet including the cost of laying and in position as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-inCharge.

33360

-

-

... More
Hiring Charges of Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-inCharge.

1260

-

-

... More
Hiring Charges of Glass Top Centre Table including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

180

-

-

... More
Hiring Charges of par light for whole mela period with necessary wiring and fitting fixing in position complete as directed by the Engg-in-Charge.

600

-

-

... More
Decoration of Audience shed with new cloth on wooden and bamboo frame including fitting fixing of screen and jhalor around the ceiling etc. complete on hire basis as per direction of Engg-in- Charge. (Only floor area/plinth area will be measured for payment) (New cloth must be used)

1800

-

-

... More
Decoration of main entrance gate with wooden structure of required size of curved and straight shape including front side will be cladding with 6mm ply and all the four side will be covered by new cloth on wooden frame including fitting fixing of screen/flex in position and decoration with handloom & handicraft materials as per approved design and drawing complete as per direction of the Engg-in-Charge. (Only front area of gate will be measured for payment)

708.84

-

-

... More
Decoration of side screen/view curter for all blocks with new cloth of white colour on wooden frame over bamboo structure including fitting fixing of screen etc. complete on hire basis as per direction of Engg-in-Charge.

5979

-

-

... More
Hiring Charges of flower tub with blooming flower including carrying loading, unloading, watering daily for the whole mela period and placing in position as per direction of the Engg-in-Charge.

150

-

-

... More
Hiring Charges of ornamental plant tub with blooming & fresh leaf including carrying loading, unloading, watering daily for the whole mela period and placing in position as per direction of the Engg-in-Charge.

150

-

-

... More
Hiring Charges of providing and fitting of LED Tuni Light typically half an inch (10-12mm) up to 16 feet (5 meters) or more properly connected by 1.50 mm² with proper tapping to prevent leakage etc. complete for the whole mela period and placing in position as per direction of the Engg-in-Charge.

500

-

-

... More
Hiring Charges for Glowsign Display board made of matel frame box is generally 4 – 8 inches deep and the width and the height of the frame are as per requirement with fluorescent tubes light fitted inside the box for glowing of GSB, including providing necessary design & write up as per direction of authority and erection in position including properly connected by 1.50 mm² with proper tapping to prevent leakage etc. complete as per direction of the Engg-in-Charge.

80

-

-

... More
Hiring Charges of Executive class Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.

10

-

-

... More
Shuttering Carpenter-system--Hacksaw Frame With Blade

10

-

-

... More
Shuttering Carpenter-system--Triangle File

10

-

-

... More
Shuttering Carpenter-system--1/2 Round File

1

-

-

... More
Shuttering Carpenter-system--Drill Bit

5

-

-

... More
Shuttering Carpenter-system--Ring Spanner

5

-

-

... More
Shuttering Carpenter-system--Double End Spanner

5

-

-

... More
Shuttering Carpenter-system--Flat File

2

-

-

... More
Shuttering Carpenter-system--Material For Temporary Scaffolding Up to 3.6 Mtrs

1

-

-

... More
Shuttering Carpenter-system--Base Plate

4

-

-

... More
Shuttering Carpenter-system--Joint Pin

4

-

-

... More
Shuttering Carpenter-system--Vertical

4

-

-

... More
Shuttering Carpenter-system--Ledger

4

-

-

... More
Shuttering Carpenter-system--Cuplocks

4

-

-

... More
Shuttering Carpenter-system--Walkway Challi

1

-

-

... More
Shuttering Carpenter-system--Hand Held Zig Saw

1

-

-

... More
Shuttering Carpenter-system--Hand Drill Machine

1

-

-

... More
Shuttering Carpenter-system--Table Mounted Saw

1

-

-

... More
Shuttering Carpenter-system--Power Drilling Machine

1

-

-

... More
Shuttering Carpenter-system--Planing Machine

1

-

-

... More
Shuttering Carpenter-system--Steel Walkways

5

-

-

... More
Shuttering Carpenter-system--GI Ladder (7 step)

5

-

-

... More
Shuttering Carpenter-system--Plumb Bob

10

-

-

... More
Shuttering Carpenter-system--Water Level Tube

10

-

-

... More
Shuttering Carpenter-system--Masons Line

5

-

-

... More
Shuttering Carpenter-system--Hammer

5

-

-

... More
Shuttering Carpenter-system--Spanner

5

-

-

... More
Shuttering Carpenter-system--Wrench

5

-

-

... More
Shuttering Carpenter-system--Pulley

5

-

-

... More
Shuttering Carpenter-system--Rope

5

-

-

... More
Shuttering Carpenter-system--Nut And Bolts (Various Size)

1

-

-

... More
Shuttering Carpenter-system--Safety Net

1

-

-

... More
Shuttering Carpenter-system--Safety Shoes

30

-

-

... More
Shuttering Carpenter-system--Safety Gogles

30

-

-

... More
Shuttering Carpenter-system--Safety Helmets

30

-

-

... More
Shuttering Carpenter-system--Cotton Hand Gloves

30

-

-

... More
Shuttering Carpenter-system--Tools Bag

1

-

-

... More
Shuttering Carpenter-system--Safety Belt

5

-

-

... More
Shuttering Carpenter-system--Safety Harness

5

-

-

... More
Shuttering Carpenter-system--Face Mask

30

-

-

... More
Shuttering Carpenter-system--Leather Apron

30

-

-

... More
5H)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Belbari RD Block area

350

-

-

... More
5I)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----MohanpurRD Block area

350

-

-

... More
5J)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Bamutia RD Block area

350

-

-

... More
5K)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Dukli RD Block area

350

-

-

... More
5L)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Hezamara RD Block area

350

-

-

... More
5M)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Lefunga RD Block area

350

-

-

... More
6A)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----AMC area

2500

-

-

... More
6B)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MMC area

2500

-

-

... More
6C)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania NP area

2500

-

-

... More
6D)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Ranirbazar MC area

2500

-

-

... More
6E)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania RD Block area

2500

-

-

... More
6F)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Mandwi RD Block area

2500

-

-

... More
6G)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Old Agartala RD Block area

2500

-

-

... More
6H)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Belbari RD Block area

2500

-

-

... More
6I)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MohanpurRD Block area

2500

-

-

... More
6J)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Bamutia RD Block area

2500

-

-

... More
6K)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Dukli RD Block area

2500

-

-

... More
6L)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Hezamara RD Block area

2500

-

-

... More
6M)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Lefunga RD Block area

2500

-

-

... More
7A)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----AMC area

100

-

-

... More
7B)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MMC area

100

-

-

... More
7C)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania NP area

100

-

-

... More
7D)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Ranirbazar MC area

100

-

-

... More
7E)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania RD Block area

100

-

-

... More
7F)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Mandwi RD Block area

100

-

-

... More
7G)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Old Agartala RD Block area

100

-

-

... More
7H)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Belbari RD Block area

100

-

-

... More
7I)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MohanpurRD Block area

100

-

-

... More
7J)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Bamutia RD Block area

100

-

-

... More
7K)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Dukli RD Block area

100

-

-

... More
7L)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Hezamara RD Block area

100

-

-

... More
7M)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Lefunga RD Block area

100

-

-

... More
8A)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----AMC area

150

-

-

... More
8B)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MMC area

150

-

-

... More
8C)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania NP area

150

-

-

... More
8D)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Ranirbazar MC area

150

-

-

... More
8E)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania RD Block area

150

-

-

... More
8F)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Mandwi RD Block area

150

-

-

... More
8G)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Old Agartala RD Block area

150

-

-

... More
8H)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Belbari RD Block area

150

-

-

... More
8I)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MohanpurRD Block area

150

-

-

... More
8J)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Bamutia RD Block area

150

-

-

... More
8K)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Dukli RD Block area

150

-

-

... More
8L)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Hezamara RD Block area

150

-

-

... More
8M)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Lefunga RD Block area

150

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-

... More
Sand

50

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.