National Highways And Infrastructure Development Corporation Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Civil And Construction
Road Construction
Civil And Architectural Services
Eprocure
Opening Date7 Jan 2025
Closing Date20 Feb 2025
Tender Amount₹ 7,43,59,00,000 
Notes
Download

Costs

Summary

Rfp For Consultancy Services For Preparation Of Detailed Project Report And Providing Pre-construction Services In Respect To Up Gradation Of Existing 2l To 4l

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Senior Bridge Engineer/ Structural Engineer

6

-

-

... More
Highway Engineer cum Pavement Engineer

6

-

-

... More
Material-cum-Geo-technical Engineer -Geologist

7

-

-

... More
Senior Survey Engineer

9

-

-

... More
Traffic and Safety Expert

5

-

-

... More
Environmental Specialist

4

-

-

... More
Quantity Surveyor/ Documentation Expert

7

-

-

... More
Land Acquistion Expert

13

-

-

... More
Utility Expert

5

-

-

... More
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment out of which 3 nos. sub-professional having 3 years experience and 2 nos. sub-professional be a fresh graduate)

-

-

-

... More
Bridge Engineer

11

-

-

... More
Assistant Highway Cum Pavement Engineer

11

-

-

... More
Assistant Material-cum-Geotechnical Engineer-Geologist

11

-

-

... More
Survey Engineer

11

-

-

... More
Assistant Quantity Surveyor/Documentation Expert

11

-

-

... More
Support Staff (Fixed Rates)

-

-

-

... More
Office Manager (1 No.)

11

-

-

... More
Typist (1 No.)

11

-

-

... More
Office Boy (1 No.)

11

-

-

... More
Night Watchman (1 No.)

11

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 12 months each)

36

-

-

... More
Duty Travel to Site (Fixed Costs)

-

-

-

... More
All Trips

1

-

-

... More
Office Rent (Fixed Costs)

-

-

-

... More
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.

11

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication

11

-

-

... More
Office Furniture and Equipment (Fixed costs)

-

-

-

... More
Office Furniture and Equipment

1

-

-

... More
Reports and Document (Fixed costs)

-

-

-

... More
Monthly Report (03 sets)

36

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Final Environmental Assessment report & RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

6

-

-

... More
Final EMP

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Survey and Investigation

-

-

-

... More
A. Topographical Survey (Fixed Rate)

-

-

-

... More
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.

1

-

-

... More
B. Investigation (Fixed cost)

-

-

-

... More
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, any other investigation surveys etc.

1

-

-

... More
Net Work Survey and GPR

-

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Sub-soil Investigation & Other Works

-

-

-

... More
Sub-Soil Investigation

-

-

-

... More
a) Boring in all type of soils (other than hard rock)

1500

-

-

... More
b) Boring in hard rock

200

-

-

... More
Cost of supply and fixing Boundary Pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.

1

-

-

... More
Land Acquisition Team including support staff and logistics/transportation

-

-

-

... More
A. Land acquisition Team including support staff

-

-

-

... More
Ex-Land Revenue Inspector/Officer or equivalent

10

-

-

... More
Ex-Kanoongo/ Girdawar or equivalent

10

-

-

... More
Ex-Patwari or equivalent

10

-

-

... More
Typist

10

-

-

10

-

-

... More
B. Logistics for Land acquisition Team

-

-

-

... More
Computer including necessary peripherals (02 nos for 04 months each)

10

-

-

... More
Printers (02 nos for 04 months each)

10

-

-

... More
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (01 no)

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.