National Highways And Infrastructure Development Corporation Limited Tender

BidAssist is a very user-friendly website that lets us explore new opportunities which further helps in the growth of the business. We can get any information regarding any e-tender the Tripura government has posted on its website in a very hassle-free manner. BidAssist is designed in such a manner so as to provide information on all government tenders at one place without any inconvenience.

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date20 Feb 2024
Closing Date19 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Nhidcl/tripura/ Nh-08/ch-kh/ae/2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer 1 No.

30

-

-

... More
Senior Pavement Specialist 1 No.

24

-

-

... More
Senior Quality Cum Material Expert 1 No.

24

-

-

... More
Road Safety Expert 1 No.

12

-

-

... More
Sub-Professional Staff

-

-

-

... More
Survey Engineer, 1 Nos.

27

-

-

... More
Assistant Highway Engineer, 1 Nos.

84

-

-

... More
Environmental Engineer, 1 No.

4

-

-

... More
Assistant Bridge Engineer, 1 Nos.

24

-

-

... More
Assistant Quality cum Material Engineer, 1 Nos.

24

-

-

... More
Electrical Engineer, 1 No.

9

-

-

... More
Quantity Surveyor, 1 Nos.

27

-

-

... More
Support Staff (inclusive of per diem allowance)

-

-

-

... More
Office Manager (1 No)

84

-

-

... More
Accountant Cum Cashier (1 No)

84

-

-

... More
Steno cum Computer operator (1 No)

84

-

-

... More
Office Boy (1 No)

84

-

-

... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run

-

-

-

... More
Scorpio or equivalent vehicle (not more than 3 years old) (1 nos during Construction Period .)

24

-

-

... More
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)

108

-

-

... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 30 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)

1

-

-

... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.

-

-

-

... More
One Office of Minimum 300 sqm area shall be rented at one location in midway of project during Construction Period

84

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.

-

-

-

... More
During Construction Period

24

-

-

... More
During Maintenance Period

60

-

-

... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.

-

-

-

... More
During Construction Period

24

-

-

... More
During Maintenance Period

60

-

-

... More
Reports and Document Printing

-

-

-

... More
Monthly reports

252

-

-

... More
Half yearly Reports

42

-

-

... More
Various other reports as provided in the Concession Agreement such as Completion Report

12

-

-

... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle (19.110 kms x 8 times)

152.88

-

-

... More
Pavement strength measurement using FWD (19.110 kms x 4 times)

76.44

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit (19.110 kms x 8 times)

152.88

-

-

... More
Road signs inspection using Retro Reflectometer (19.110 kms x 8 times)

152.88

-

-

... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.