Military Engineer Services Tender
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Military Engineer Services - MES Tender
Eprocure
Opening Date6 May 2024
Closing Date1 Jun 2024
Tender Amount₹ 8,95,30,000
Costs
EMD
₹ 7,72,650Document Cost
₹ 3,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_636830_2Bid Award Id
ViewTender No
958447/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Lump sum price worked out by the contractor for Internal Water Supply as listed in Sch ‘A’ Part II.
1
-
8373.89
Sch A Part III (INTERNAL ELECTRIFICATION)
-
-
-
Lump sum price worked out by the contractor for Internal Electrification as listed in Sch ‘A’ Part III .
1
-
99806.95
Sch A Part IV (EXTERNAL WATER SUPPLY)
-
-
-
Lump sum price worked out by the contractor for External Water Supply as listed in Sch ‘A’ Part IV .
1
-
447774.98
Sch A Part V (EXTERNAL ELECTRIFICATION)
-
-
-
Lump sum price worked out by the contractor for External Electrification as listed in Sch ‘A’ Part V.
1
-
4388209.27
Sch A Part VI (SEWAGE DISPOSAL)
-
-
-
Lump sum price worked out by the contractor for Sewage Disposal as listed in Sch ‘A’ Part VI.
1
-
64364.09
Sch A Part VII (AREA DRAINAGE)
-
-
-
Lump sum price worked out by the contractor for Area Drainage as listed in Sch ‘A’ Part VII
1
-
379645.03
Sch A Part VIII (ROAD/PATH AND CULVERT)
-
-
-
Lump sum price worked out by the contractor for Road/Path & Culvert as listed in Sch ‘A’ Part VIII
1
-
478270.56
Sch A Part IX (FENCING AND GATE)
-
-
-
Lump sum price worked out by the contractor for Fencing and gate as listed in Sch ‘A’ Part IX.
1
-
2462249.35
Sch A Part X (AIR CONDITIONING AND WATER COOLER)
-
-
-
Lump sum price worked out by the contractor for Air conditioning and water cooler as listed in Sch ‘A’ Part X
1
-
233436.34
Sch A Part XI (LIGHTENING PROTECTION)
-
-
-
Lump sum price worked out by the contractor for lightening protection as listed in Sch ‘A’ Part XI.
1
-
34739.23
Sch A Part XII (CABLE DUCT)
-
-
-
Lump sum price worked out by the contractor for cable duct as listed in Sch ‘A’ Part XII
1
-
427752.86
Sch A Part XIII (EARTHWORK)
-
-
-
Lump sum price worked out by the contractor for Earthwork as listed in Sch ‘A’ Part XIII
1
-
1825707.84
Sch A Part XIV (Miscellaneous Items of B/R and E/M and Solar power plant)
-
-
-
Design, Supply, install, testing and commissioning of ground based solar power generating system without battery of capacity 1.0 MW AC output peak grid tied solar photo voltaic system complete with the components specified below:- (a) Solar Mono C Si PERC Module of minimum rating 545 Wp with minimum 144 cells with DCR norms shall be certified as per IEC 61215-Edition-II, IEC 61646 and IEC 61730-1&2 complete all as specified. Qty of solar PV module shall be tentatively 2300 Nos for 1.0 MW AC output peak.
Note: -
(i) Design shall be done as per latest IS code, latest MNRE guidelines and specifications mentioned in tender from MNRE approved channel partner of rating as specified in NIT. Final design and drawing has to be vetted by any of the approved agency as mentioned in the tender (ii) Solar Modules and solar cells therein should be of Made in India and complying DCR norms(Domestic content requirement). The contractor will have to submit company declaration in the format, to be provided by GE at the time of request for approval of sample/Make for modules. Each PV module used in this work shall have RF Identification tag.
(iii) Solar PV Modules shall be warranted for a minimum period of 25 years. PV modules shall be warranted for their output peak watt capacity, which shall not be less than 90% at the end of 10 years and 80% at the end of 25 years. PV modules shall be warranted for any manufacturing defect or bad workmanship for a period of 25 years from the date of completion of Phase-I of the work. The contractor shall submit necessary warranty certificate for 25 years to GE. The condition 46 of IAFW 2249 shall be amended to the extent as mentioned above.
1
-
-
(iv) Modules should be of Make as approved by MNRE. If no make has been approved, modules confirming to IEC standards mentioned above or latest specification issued by MNRE will be used in SPV system. (v) An amount equal to Rs 5,00,000 (Rupees Five Lakh Only) shall be retained from the contractor's bill against the warranty as performance guarantee for a period of 25 years from date of completion of job. Alternatively, the contractor may give a separate interest bearing security deposit/BGB in favour of GE valid for 25 years. This amount shall be refunded to him by GE after a period of 25 years under the conditions provided from by the contract and arising solely from faulty materials or workmanship provided such defective parts are not repairable at site. (vi) During the period of warranty of modules, the contractor shall remain liable to replace any defective parts that become defective in the plant. (b) Hot dip galvanized MS angle module mounting structure for solar panels of combined capacity 1.0 MW, AC output with double pole static structure of suitable size along with concrete grouting alongwith necessary foundation for required rigid support as required at site capable to with stand maximum wind load of 170 Km/hrs as designed for angle of modules all as required as per site.
-
-
-
(c) Central Inverter/PCU, DC to AC (indoor type) of capacity 2x500 KW AC or next higher side capacity suitable for 1.0 MW AC , with minimum DC inputs 4(+/-) each with SCADA capabilities as specified housed in OEM provided complete.
Note: - (i) Power conditioning Units (PCU) PCUs small be warranted for minimum period provided by the manufacturer but not less than 5 years PCUs shall be warranted for any manufacturing dived or bad workmanship for a minimum period of 05 years from the date of completion of Phase-I of the work. The condition 46 of IAFW 2249 shall be amended to the extent as mentioned above. (ii) During the period of Warranty the contractor shall remain liable to replace any defective parts that become defective in the plant under the conditions provided for by the contract and arising solely from faulty materials of workmanship, provided such defective parts are not repairable at site. After replacement the defective parts shall be returned to the contractor. (d) String monitoring/combiner box of type with 10 Amp MCB/fuse on positive side, 200 Amp manual DC disconnect or switch & 22 Channel monitoring as required at site complete. (e) Copper DC String cables of different sizes of suitable size as required at site of Solar grade, including suitable lugs/male, female connectors etc. UV resistant 1.0 KV DC Cables confirming to IEC 62930:217/BSEN50618 temperature range -50 to +900 C, complete.
-
-
-
(f) Data monitoring system communication cable RS 485 [screen twisted] as required at site complete. (g) Inverter communication Shielded CAT-5 cables as required at site complete. (h) Supply, install, testing and commissioning of Solar Observatory system of Weather Station complete all as specified and directed consisting of following:-
(i) Pyranometers: 1
(ii) Rain Guage: 1
(iii) Module Temp Sensor:4
(iv) Ultrasonic Anemometer:1
(v) Temp & relative Humidity Meter: 1
(vi) Solar Panel (35 W) + Battery Bank: 1
(vii) Data Logger: 1
Note:- All data shall be recorded chronologically date wise. The data file shall be MS Excess compatible. The data logger shall have internal reliable battery backup to record all sorts old data simultaneously round the clock. All data shall be stored in a common work sheet chronologically Representation of monitored data shall be in graphics mode and/or in tabulation form. All instantaneous data can be shown in the Computer Screen. with Remote Performance Monitoring System complete all as specified and directed by the Engineer-in-Charge and shall have following:-
(i) Inverter Data Monitoring
(ii) Energy Meter Data Monitoring
(iii) Weather Station Monitoring
-
-
-
(j) Lightening protection system of Early Streamer Emission type Lightening Spike with 107 m protection at level 3 for Protection (duly supported by tech literature) against lightning strikes with GI mast of 8.5 Mrs long
(i) Qty of lightening arrester shall not be less than 3 qty including suitable size of copper earthing plate with strip from pit to LA. Foundation of system should be as advised by OEM / NISE
(ii) Earthing shall be provided for string monitoring/combiner box, Inverter, Solar PV module, mounting structure, panels, LA complete with suitable size of Copper earthing and copper Cable / strip as earthing lead as per design including termination accessories as required at site & confirming to latest IS/IEC all as specified and directed. Earthing for isolation transformer and equipments thereafter downstream will be through GI strip earthing with GI earthing lead. (iii) Main distribution board, Floor Mounted DC Panel, DC Bus, Auxiliary Buses for required load as per site requirement on DC side of inverter complete.
(iv) Main distribution board Floor Mounted AC Panel, AC Bus, Auxiliary Buses for required load as per site requirement on AC side of inverter complete all as specified and directed.
(v) UPS with battery bank of 5 KVA with 60 minutes backup at 100% load as per design & specifications for Solar System critical components, Industrial type on in UPS with static switches for bypass complete.
(vi) UPS distribution board of Floor Mounted UPS DB, indication lamp complete all as required at site.
(k) Main DC Cables of sized as required at site, copper armored Cable confirming to IEC 62930:217/BSEN50618 temperature range -15°C to +90°C complete.
-
-
-
(l) 1.1KV copper Armored LT power Cable as per IS 7098 from inverter to transformer of AC Cables of off sizes as required at site incl end joints , mid joints , complete all as specified and directed. (m) LT Aux (DC & AC) control cables for UPS input, transformer, Inverter, panels of suitable size, 1.1KV copper LT cable as per relevant IS complete all as specified and directed. (n) Earth continuity conductor or main earthing lead copper cable or GI strip of suitable size as per design and as required at site. (o) Suitable size HDPE pipe 6kgf/cm2 rating for cable protection including all necessary fitting and fixing arrangement complete as required at site all as specified and directed. Note: Necessary earth work sand cushioning protection pipe bricks etc shall deemed to be included for laying of cables HDPE pipe up to power transformer. (p) Industrial type computer (one No) rugged & robust in nature to operate in a hostile environment. The computer shall be of HP make or of equivalent make having i10 of better processor with minimum 1 TB of hard drive, 21’’ LCD colour monitor, DVD Drive with writer multimedia kit and UPS with 30 min Power back up with internet connecction for PC.
-
-
-
(q) Coloured laser printer (one No) as per HP model number M1005 or techno commercially equivalent model in other make as approved by GE. The printer shall be equipped for printing scanning copying complete. (r) Generation Metering: Suitable capacity generation digital meter arrangement with associated accessories viz CT, PT, metering box, wiring etc for commissioning with initial inspection from local electricity supply company. (s) Net Metering : Suitable capacity Net digital metering arrangement with associated accessories viz CT, PT, metering box,wiring etc for commissioning with initial inspection from local electricity supply company Note : Metering arrangement should be SCADA supported and have following features to measure and record (i) Parameters of current, voltage , PF and frequency (ii)Total units generated since installation (iii) Total units exported (iv) Total units consumed in house (iv) any other metering reqd to determine efficiency.
(v) The contractor will be resposible for liaising with MPSEB for new net metering connection & grid connectivity approval against newly commenced 1 MW solar power plant.
(t) Inverter duty step up transformer BEE Level 5, ,copper wound, outdoor type of 1250 KVA or nearest size on higher side suitable for stepping up AC voltage from Power Conditioning Unit / Invertor to 11 KV confirming to IS-2026 incl all latest amendments incl first fill of transformer oil confirming to IS 335 , suitable plinth of size and design as per manufacture instruction with slot and clamps for incoming and outgoing cable protection pipe complete all as specified and directed - 01 No
-
-
-
(u) Isolation Transformers -2 Nos of 630 KVA or nearest higher capacity compatible with AC voltage of PCU incl first fill of transformer oil confirming to IS 335, suitable plinth of size and design as per manufacture instruction with slot and clamps for incoming and outgoing cable protection pipe complete all as specified and directed. (v) Surge Protection device complete all as specified and directed (w) Earthing with 600x600x6.00mm Galvanized steel earth plate electrode buried vertically in ground (earth pit not less than 2.25 meter deep below normal ground level) with top edge of the plate at a depth of not less than 1.5 m below ground level, connected to and including Galvanized steel Strip of size 32 x 6 mm by means of bolts, nuts and check nuts and washers of galvanized steel with and including 40 mm dia GI medium grade pipe for protection of GI strip to the extent of 7.5 meters as earthing lead including charcoal dust and salt packed all around the earth plate in the earth pit all as per Electrical Plate No 3 of SSR Part I (2009) including PCC foundation / chamber in mix 1:2:4 type B1 with MS angle iron frame, CI Cover with provision of locking arrangement and 20 mm dia medium grade G.I. Pipe from top edge of the earth plate upto M.S. funnel with wire mesh provided inside the concrete earth pit for watering arrangement complete including excavation and earthwork in any type of strata and testing complete including fill up the earth pit with soil for best result and removal of excavated material from the site complete all as specified and directed.
-
-
-
(x) Earthing with copper earth plate 600x600x3mm, earth plate electrode buried vertically in ground (earth pit not less 2.25 meter deep below normal ground level) with top edge of the plate at a depth of not less than 1.5 m below ground level, connected to and including copper earth strip of size 25 x 3 mm by means of bolts, nuts and check nuts and washers of copper steel with and including 40 mm dia GI medium grade pipe for protection of copper strip to the extent of 7.5 meters as earthing lead all as per Electrical Plate No 3 of SSR Part I (2009) including PCC foundation / chamber in mix 1:2:4 type B1 with MS angle iron frame, CI Cover with provision of locking arrangement and 20 mm dia medium grade G.I. Pipe from top edge of the earth plate upto M.S. funnel with wire mesh provided inside the concrete earth pit for watering arrangement complete including excavation and earthwork in any type of strata and testing complete including fill up the earth pit with soil for best result and removal of excavated material from the site complete.
Note- Nos of earthings shall be provided as required at site as per IE/IEC rule.
-
-
-
(y) Supply and fixing 15 Nos, AIO Solar Street light 40W made with high efficiency Mono light crystalline solar PV module, Lithium Ferro Phosphate battery with inbuilt BMS technology, High efficiency LED, MPPT solar charge controller and aluminium extruded body specially programmed to automatically control the dimming and brightness of light, which increase the backup time all as specified and directed and also shall comprise the followings: -
(a) S&F 3.5m high mild steel powder coated pole of suitable dia compatible with solar light fitting and fixtures along with gussets plate and nut bolts and washers etc.
(b) Necessary earthwork, PCC foundation & filling etc.
-
-
-
(z) Portable fire extinguishers in the control room for fire caused by electrical short circuit, sand buckets in the control room. The installation of fire extinguishers should confirm to TAC regulations and BIS standards. The fire extinguishers shall be provided in the control room housing PCUs as well as on the roof or site where PV arrays have been installed.
-
-
-
M&L for Brick, sub class ‘B’, old size, laid in trenches as in cable protection complete all as specified and as directed
15
-
-
Supply installation, testing and commissioning SF insulated VCB HT 11 KV, 3 Phase, 50 HZ, indoor type, totally enclosed / metal clad switch gear complete having rupturing capacity of 350 MVA, 630 A, overload, earth fault and short circuit protection, Voltmeter range (0-15 KV) and Ammeter (0-500 Amp), required battery bank with charging arrangement, complete of following specifications mentioned in IS/IEC 62271 -100 & 200 incl latest amendments / additions including followings: - (a) Motorized spring charging mechanism with 24volt DC universal motor 200 watts and having charging time less than 10 seconds. including manual closing / tripping push button. (b) Bus Bar Chamber including a set of 3 phase copper bus Bars of suitable size. (c) Dual core dual ratio Current Transformer (CT) chamber comprising of 3 Nos, single phase resin cast / ring core CTs of 200-100 / 5+5, burden not more than 15 VA and accuracy class 0.5, for metering, having class SP10 for protection as per IS:2705 for each circuit breaker - 01 Sets
1
-
-
(d) Potential Transformer (PT), 3 phase, dry type (resin cast) fixed type 11 KV / 110 Volts, Burden 100 VA, Accuracy class 0.5 with HT & LT HRC fuses / MCB for primary and secondary complete all as specified and as directed as per IS: 3156 - 01 Set (e) SCADA compatible self-powered IDMT numerical relays, over current & earth fault relay with high adjustable setting, short circuit fault relay for complete protection of HT ,11 KV,3 Phase feeder having facility to record fault current with MODBUS communication on RS 485 communication port - 01 No. including 1 No voltage monitoring relay for under voltage / over voltage protection. (f) Earthing switch rated for full making capacity with provision for safe & reliable position indicator. (g)(i) Assembly of Vacuum circuit breaker shall be completely insulated as per the relevant IS/IEC.
(ii) The vacuum interrupter bottle shall be of the same make of VCB.
(iii) Spring charged and electrically operated independent closing / tripping, trip free, operating mechanism and breaker close / open 0ption shall be provided.
(iv) VCB should be SF6 insulated and has to be integrated with existing panel. Cost of integration is included in quoted rates
-
-
-
Supply, installation, testing and commissioning of HT 11KV, 3 Phase, 50 Hz, outdoor type, totally enclosed/metal clad Switch gear complete with four vacuum circuit breaker (VCB) panel, rupturing capacity of 350 MVA, overload, earth fault and short circuit protection, voltmeter range (0-15 KV) and ammeter (0-630Amp), required battery bank with charging arrangement complete of following specifications mentioned in IS/IEC 62271-201 including latest amendments /additions. (a) Motorized spring charging mechanism with 24-volt DC Universal motor 200 watts and having charging time less than 10 second.
(b) Earthing switch related for full making capacity with provision for safe and reliable position indicator.
(i) Assembly of vacuum circuit breaker shall be completely insulated as per the relevant IS/IEC.
(ii) The rating of VCB shall be 11 KV, 630 Amps,21 KA (for 3 second), 50 Hz, 3 phases.
(iii) The vacuum interrupters bottle should be of the same make of VCB.
(iv) Electrically charged and electrically operated independent closing/tripping, trip free, operating mechanism including manual closing/ tripping push button and breaker close/ open portion shall be provided. Make: ABB/Siemens/Schneider.
(v) One bus bar chamber including a set of three phase 630 Amps copper bus bars to be provided for further extension in future, if necessary.
(vi) Strip heaters with thermostat to be provided with the following specifications: -
Power input 80 watts with Voltage rating 230 Volts AC single phase.
1
-
-
(vii) Dual core dual ratio current Transformers (CT) chamber comprising of 3 Nos, single phase resin cast/ring core CTs of 200-100/5+5, burden not less than 15 VA and accuracy class 0.5, for metering, having class SP 10 for protection as per IS:2705 for each circuit breaker-01 Sets.
(viii) SCADA compatible self powered IDMT numerical relays L&T, over current & earth fault relay with high adjustable setting, short circuit fault relay for complete protection of HT, 11 KV, 3 Phase feeder having facility to record fault current with MODBUS communication on RS 485 communication port-01 No including 1 No voltage monitoring relay for under voltage/over voltage protection.
(ix) Digital SCADA compatible meter of accuracy class 1, as per IEC 62052-11/IEC 62053-22 monitoring all electrical parameters like voltage & current per phase and watts, VA, VAR etc. Also to monitor all instantaneous integrated demand, parameters, neutral current, frequency, power factor, % load, % unbalance (V&I), phase angle, THD working on MODBUS protocol.
(x) One set of mechanical indicator for ON/OFF indicator for all LBS/VCB breaker.
(xi) One set of capacitive voltage indication for R-Y-B.
Note: -
1. Any auxiliary fitting/fitments for protection and functioning shall be provided as per the relevant IS.
2. The contractor shall submit GA drawings and technical specifications of VCB to GE for his approval before placing order.
-
-
-
S&F Voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of +/- 2.5% with time delay facility and of capacity 05 KVA complete all as specified and directed.
2
-
-
S&F Voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of +/- 2.5% with time delay facility and of capacity 02 KVA complete all as specified and directed.
1
-
-
M & L Earthing complete with copper steel earth plate electrode 60×60cm.× 3.15mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to copper strip 20x3 mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion
2
-
-
M&L for 200 mm thick (spread thickness) granular sub base (GSB) grading-II using stone aggregate of size 40 mm to 60 mm interstces filled, laid in single layers, spread, rolled & consolidated to required gradient & camber using power roller 8 to 12 tonne capacity etc. complete all as specified and directed.
18
-
-
Construction of Valve pit brick/stone/PCC block masonry constructed complete with Mild steel sheet cover 3mm thick and angle iron frame of size 40x40x6mm duly painted with two coats of synthetic enamel paint over a coat of red oxide primer and including locking arrangement and lifting handle including PCC bed all as specified and shown on drawing . Brick/stone/PCC block work all inner , outer surfaces of pit shall be plastered in cement mortar 1:4 complete of internal size 600 mm x 600 mm x 600 mm all as specified and shown on drawing of sizes.
2
-
-
S&F for Rotational moulded polyethylene water storage tanks 2 x 5000 Ltr (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I including suitable size PCC platform complete all as specified and directed.
1
-
-
Supply & Fixing of Monoblock centrifugal pump set suitable for operate with 3 Phase, 415 Volt AC 50 Hz supply and having ingress protection level IP-55, Class of insulation 'F', ISI Marked complete with bronze impeller, Stainless Steel shaft and all necessary hardware and pipe fittings / gasket. The pump set shall be duly fixed on rubber mountings and necessary electrical / earthing connection complete suitable to meet the following parameters :
a) Operating Head : 23 Mtr
b) Capacity : 5.0 HP
c) Suction : 50mm
d) Delivery : 80 mm
e) Rated RPM : 1400
2
-
-
Supply and fixing DOL starter in sheet steel enclosure, 3- phase, 415 Volts, 50 Hz, motor rating AC-3 duty, relay range 6-10 Amps, suitable for motor up to 10 Hp, all as specified and directed.
2
-
-
M&L for cutting existing GI water mains of 150 mm dia ( in position) for branch connections of the internal dia 100 mm include for turning water off and on and draining and refilling complete all as specified and directed.
1
-
-
Supply, installation, Commissioning and testing HV Junction box panel board of suitable shape and size as approved by GE for 3 phase 11000 Volts ,AC , 50 Hz supply, Outdoor cubical type, dust and vermin proof, pedestal mounting type suitable for Outdoor applications having suitable shape/ size canopy on top, made out of 3.15 mm thick MS sheet with using 25mm x 25mm x 5mm angle iron frame and supports, duly finished with powder coated using two coats of synthetic enamel paint of approved colour over a coat of red oxide primer all over steel surfaces complete including locking arrangement and including PCC work for fixing panel legs and bus bar of aluminium conductor suitable shape and size for 3 phase rating of 800 amps IP-54 including one coming and two outgoing Protection complete all as specified and directed.
2
-
-
Boring of holes under road, pavement, hard standing by trenchless technology using ultra sounding technique and necessary machine including supply and laying HDPE pipe of 150 mm dia suitable for 0.4 mpa working pressure, complete all as specified and directed.
30
-
-
M&L for fixing and installation of drop out fuse 11 KV complete having 12 insulators of rating upto 200 Amps.(each set will include RYB phasing) complete all as specified and directed.
1
-
-
Supply, assembly, erection, testing and commissioning outdoor type factory made powder coated Panel Board with 200 Amps bus 4 Nos. aluminium bus bar, having locking arrangments floor mounted free standing weather proof panel with IP-54 protection fabricated out of suitable sized angle iron and flats and covered with 3 mm thick CRCA sheet duly pretreated in seven tank process for de-greasing , de-rusting & phosphated painted with 2 coats of primer paint then the panel surface shall be finished and then painted with final coat of epoxy based powder coated paint.Panel shall be compartmentrised with rubber gasketed hinged door. Panel shall be having only front opening for installation of separate cable alleys, busbar chamber and switchgear compartments. Provision in cable alleys to be kept for bottom cable entry for incoming & outgoing cables. Panel have CT 5/200 Amps - 03 Nos, Digital Ammeter 0-200 Amps, Digital Voltmeter 0-500 Volt, Phase Indicator LED (RYB) - 03 Nos. A clear space of 200mm to be kept from floor level for switchgear compartment. Extended busbar links/ terminals to be provided for connecting cables. Air ventillation louvers to be provided for heat dissipation with earthing terminal at each end of the panel. Suitable sized knock-out holes consisting of the following:-
1
-
-
Incoming:-
(a) MCCB with thermal magnetic release 4 Pole 100 Amps 25 KA - 02 No. Outgoing:-
(a) MCCB with thermal magnetic release 4 Pole 63 Amps 25 KA - 03 Nos. (b) MCB SPN 32 Amps - 02 Nos.
-
-
-
M&L for earthing complete with galvanised steel plate electrode 600mm x 600mm x 6mm thick buried directly in ground (earth pit not less than 2.25 Mts deep below ground level with top edge of the plate not less than 1.50 Mtrs below ground level connected to glavanised MS strip of size 32mm x 6mm by means of bolts, nuts check nuts and washers of galvanised iron or steel connected to earthing test point all as specified incl 40 mm GI tubing medium grade and necessary fitting for protection of GI wire incl laying of charcoal dust and common salt in alternate layer, PCC Pit (1:3:6) type C-1 using 20 mm graded stone aggregate, RCC cover 40mm thick (1:2:4) type B-0 using 12.5mm graded stone aggregate reinforced with 6 mm dia round bar @ 75mm C/C both ways with MS handle 8mm dia, plastering 15mm thick CM (1:6) externally upto 150mm below ground level , GI funnel with 20mm dia medium grade GI pipe for watering and wire mesh incl excavation and earth work and disposal of surplus soil complete all as specified and shown on electrical plate No 3 of SSR Part (2009) and connected to earth test point incl testing and marking Bldg Nos / Name of Equipments and writing Test Results on a 3.0mm thick painted M.S. earth pit marking Plate (200mm x 200mm) duly welded with a 450mm long 10mm dia round M.S. rod, fixed with the earth pit chamber by grouting complete all as specified an directed.
Note:- (i) GI plate and GI pipe medium grade, upto 7.5m shall be deemed to be included in the rates quoted.
(ii) Excavation and earthwork in any type of soil strata shall be deemed to be included in the rates quoted.
(iii) The Steel work, RCC , PCC work shall be deemed to be included in the rates quoted.
10
-
-
Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded copper conductor, 1100 volts grade, of size single core 400 sq mm complete all as specified and directed.
330
-
-
Supply, laying & testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded copper conductor, 1100 volts grade, of size single core 240 sq mm complete all as specified and directed.
420
-
-
Construction of soakage well 1.2m dia and 3.00 m effective depth including earthwork in any type of soil, foundation concrete in PCC 1:3:6, walls of honey combed masanory with top ring of M-25 concrete including intercepting chamber and screen chamber made of brick masanory in CM, RCC cover slab in M-25/SFRC cover, interconnection pipes of RCC/DWC complete filled with brick bats complete all as specified in drawings and directed.
1
-
-
Construction on site LLDPE septic tank capacity 2000 Ltr design to carry sewage and sullage water/excavagation in any type pf soil PCC 1:4:8 below foundation, vent shaft, connection etc. complete for 05 Users with upflow filter including media complete all as specified and directed.
1
-
-
Supply and fixing cable route indicator for HT cables complete all as specified and directed.
15
-
-
M&L for earthing complete with galvanised steel plate electrode 600mm x 600mm x 6mm thick buried directly in ground (earth pit not less than 2.25 Mts deep below ground level with top edge of the plate not less than 1.50 Mtrs below ground level connected to GI wire 4mm by means of bolts, nuts check nuts and washers of galvanised iron or steel connected to earthing test point all as specified incl 40 mm GI tubing medium grade and necessary fitting for protection of GI wire incl laying of charcoal dust and common salt in alternate layer, PCC Pit (1:3:6) type C-1 using 20 mm graded stone aggregate, RCC cover 40mm thick (1:2:4) type B-0 using 12.5mm graded stone aggregate reinforced with 6 mm dia round bar @ 75mm C/C both ways with MS handle 8mm dia, plastering 15mm thick CM (1:6) externally upto 150mm below ground level , GI funnel with 20mm dia medium grade GI pipe for watering and wire mesh incl excavation and earth work and disposal of surplus soil complete all as specified and shown on electrical plate No 3 of SSR Part (2009) and connected to earth test point incl testing and marking Bldg Nos / Name of Equipments and writing Test Results on a 3.0mm thick painted M.S. earth pit marking Plate (200mm x 200mm) duly welded with a 450mm long 10mm dia round M.S. rod, fixed with the earth pit chamber by grouting complete all as specified an directed.
Note:- (i) GI wire and GI pipe medium grade, upto 7.5m shall be deemed to be included in the rates quoted.
(ii) Excavation and earthwork in any type of soil strata shall be deemed to be included in the rates quoted.
(iii) The Steel work, RCC , PCC work shall be deemed to be included in the rates quoted.
1
-
-
Sch A Part XV (Maintenance, manning and operation of solar plant)
Phase-II
-
-
-
Services for maintenance, operation of Solar power plant for 55 months (including two year defect liability period) in two shifts including Saturday, Sunday & holidays after completion of project as per conditions of contract including the following:- (i) The work order for outsourcing of services shall be placed for eleven months & no price adjustment for its extension shall be permissible. The Solar Power Plant shall be operated in 02 shifts per day unless otherwise directed by the Engr-in-charge/GE.
(ii) The contractor shall deploy minimum tradesman as follows:-
(aa) One trained Electrician in two shifts (one in each shift) and one helper in two shifts (one in each shift) as decided by engineer in charge shifts for attending/monitoring the breakdown and preventive maintenance.
Note: Penalty Clause:-
If the installation (Solar Power Generation Station) is not operated by the electrician and helper or found absent from duty the penalty for this lapse shall be final and binding as under:-
Skilled Electrician: - Double the rate of minimum wages published by the GOI during the absent period.
Helper: - Double the rate of minimum wages published by the GOI during the absent period.
(iii) The electrician must have ITI in Electrical and having experience of 02 years in operation & maintenance of solar power plant and familiar with SCADA operating system, weathering monitoring system, HT/LT installation and security and safety features complete. The Necessary technical qualification certificate shall be produced for verification of Engr-in-charge & get the written approval on record before deploying for works.
-
-
-
(iv) Contractor shall offer service for entire system as per inspection/ maintenance schedule as given in PS and as directed by Engineer in Charge and maintain necessary record for the same.
Contractor shall also ensure the following:-
(aa) Servicing of all solar equipment’s HT/LT control system, Transformers weather monitoring equipment’s SCADA system etc all as per OEM.
(ab) Cleaning of Solar PV modules by washing, sprays, brushes, tools and plants, any washing solutions as per OEM recommendations & as per laid down norms for solar power plant complete as directed by the Engr-in-charge/GE including providing arrangements for taking water from tapping point to modules.
(ac) Checking of meter readings and recording in log book in the format and as per instruction given by Engr-in-charge.
(ad) The Engineer/Electrician shall submit reports in soft and hard copy format as required by the Engineer in charge.
(ae) Safety, security of all E&M equipment’s solar panels, T&P and Sub Station complete all as directed by the Engineer-in-charge.
(af) Area cleaning removing of grasses, bushes etc as per the instructions of Engr-in-charge.
(v) The contractor shall pay minimum fair wages to the employees fixed by the Govt. of MP or Central Govt. whichever on higher side through bank account. The contractor shall produce the proof of payment to the employees such as statement of bank account, EPF payment as per EPF or MP act, ESI payment duly signed by all the tradesman/Engineer-In-Charge at the time of RAR/Final Bill.
-
-
-
(vi) Arrangement of all required work, access permissions shall be made available to work force of the contractor by the GE through Security Officer.
(vii) Repairing of all installation if required will be carried out on site or at service centre. Quoted rates shall be all inclusive and includes for required Spares, services labour, handling and transportation charges etc. (viii) Proper & efficient functioning of the plant must be ensured through regular inspection by qualified engineer of MNRE approved vendor of Category ‘A’ as per inspection/ maintenance schedule and rate quoted will be inclusive of the same .
-
-
-
(ix) Contractor shall arrange training one month for operation and maintenance to MES tradesman before handing over the installation to MES as directed by GE Note: Contractor shall recharge fire extinguisher as when required and cost of the same shall be deemed to be included in quoted rates.
Note:- All stationery, T&P, items required to maintain the Installations, for keeping in a presentable manner and to keep plant in 100% function able condition, payment of requisite charges and fees for SCADA to third party / SCADA OEM, are deemed to be Included in the cost of quoted rate.
(x) Cost of recharge of internet of SCADA system.
Note:- (i) For item No. 15.05, The pre-priced amount has been arrived as per the latest minimum wages rate.
(ii) For item No. 15.06 to 15.10, The pre-priced amount has been arrived at an anticipated increase in rate @5% for subsquent years.
(iii) The contractor shall not quote the rate below the pre-priced rates
-
-
-
First 8 Months
(During Defect liability period)
1
-
700000
Next 8 Months
(During Defect liability period)
1
-
735000
Next 8 Months
(During Defect liability period)
1
-
772000
Next 10 Months
(Beyond Defect liability period)
1
-
1014000
Next 10 Months
(Beyond Defect liability period)
1
-
1064000
Next 11 Months
(Beyond Defect liability period)
1
-
1118000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements