Military Engineer Services Tender
View complete overview of Goa MES Tender
Costs
EMD
₹ 22,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_MES_215440_3Bid Award Id
ViewTender No
8760/E8Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
NOTES APPLICABLE TO SERIAL ITEM No. 01 to 03
-
-
-
... More
(a) Grease, gland packing for valves/pumps, bolts, nuts washers, rubber packing etc required for the routine maintenance will be provided by the contractor. The rates quoted are deemed to include the cost of the same.
-
-
-
... More
(b) Pump will be operated as directed by Engineer-in-Charge or his representative at the respective station.
-
-
-
... More
(c) The operator shall be responsible for releasing water from the above mentioned pump house to the users at Panaji and Bambolim areas and maintaining clean and sterile water at the swimming pool at Panaji area all as directed by Engineer-In-Charge.
-
-
-
... More
(d) Log sheets/ books for all the plants to be provided by the contractor and maintained by the operator. Weekly off shall be given to the employed staff and alternate arrangement shall be made by the contractor at no extra cost to the Govt.
-
-
-
... More
(e) The rate quoted shall be deemed to include the cost of manual chlorination and for maintaining required quantity of free chlorine in water all as directed.
-
-
-
... More
(f) Back wash to the filtration plant at Panaji shall be carried out weekly and when required depending upon the condition of water in order to keep the water dust free.
-
-
-
... More
(g) The contractor will be responsible for the safe custody and cleaning of the installation.
-
-
-
... More
(h) The operator will be in proper uniform.
-
-
-
... More
(j) Chemical will be measured and paid for separately under relevant item of Sch ‘A’
-
-
-
... More
(k) Net protection to swimming pool well will be provided by the contractor to avoid outside dust into the well.
-
-
-
... More
Cleaning the bottom and side walls of the balancing tank of swimming pool at Altinho, Panaji by scrubbing with the lime water and removing the mud/ dirt/ lime collected at the bottom of the balancing tank complete all as specified and as directed by Engineer-in-Charge.
4
-
-
... More
Cleaning of swimming pool bottom with suction sweeper including side wall and steel ladder with nylon brush at Altinho and Panaji complete all as specified and as directed by Engineer-in-Charge
100
-
-
... More
Notes applicable to item No. 3 & 4
-
-
-
... More
(a) Suction sweeper will be provided by the department under Schedule ‘C’, free for operating and the same shall be maintained by the contractor. Contractor has to provide brushes and other required equipment all as directed.
-
-
-
... More
(b) Repairs to suction float valves, minor repairs to suction sweeper's flanges, bolts and nuts, clamp, washers etc shall be provided by the contractor as and when required without any extra cost to the department.
-
-
-
... More
(c) The rate quoted shall be deemed to include the charges for divers for cleaning the side wall of the swimming pool once in every month and for maintaining clean and sterile water to the satisfaction of Engineer-In-Charge.
-
-
-
... More
Supply and fix set of seven pieces of Chlorination tablets Chlorine Granules containing algaecide and coagulation of size of 50.80mm in diameter (pack of floating plastic sealed disposable packet with arrangement for appropriate water contact with tablet and circulation through the plastic packets, with arrangement for string for hanging suitable for disinfection algae control and coagulation of swimming pool water. Disinfection capacity is eight lack forty thousand liters of water to obtain free Chlorine of 0.5ppm at release replacement indication visual and weight variation) complete all as specified and directed by Engineer-in-Charge. Make: Declibac Technologies or equivalent.
10
-
-
... More
Supply and add the following chemicals for water treatment to keep the swimming pool water free from fungi and bacteria at Altinho, Panaji.
-
-
-
... More
(a) Alum ferric compound of approved quality.
180
-
-
... More
(b) Copper Sulphate
120
-
-
... More
(c) Calcium Hypochlorite 65% to 75% available chlorine must contain appropriate quantities of dispersant/ corrosion inhibitors to prevent encrustation/ scaling in distribution system. Make: AQUAFIT of Shree Royalseema Hi-Strength Hypo Ltd.
550
-
-
... More
(d) Stable Bleaching powder, Grade I
260
-
-
... More
Notes applicable to item No. 6
-
-
-
... More
(a) The above chemicals mentioned her-in-before shall be added in the swimming pool water on required basis depending upon the quality of water as directed by the Engineer-in-Charge or his representative.
-
-
-
... More
(b) Prior approval shall be obtained before adding the chemicals and also with respect to the quality of the chemicals.
-
-
-
... More
(c) water test kit will be provided by the contractor and test results will be entered in the register on daily basis
-
-
-
... More
(d) Purchase voucher will be provided by the contractor to the Engineer-in-charge for onward submission to GE at the time of release of payment.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements