Tenders of Colliers Project Leaders
Tenders of Colliers Project Leaders
Colliers Project Leaders Tender
Civil And Construction...+1Water Storage And Supply
Canada
General Description Of Scope Of Work • Disconnect The Existing Reverse Osmosis Units, Pretreatment Filters And Replace With New Reverse Osmosis Units, Associated Storage Tanks And Pretreatment Filters As Indicated In Drawings. Confirm Final Equipment Locations With Facility Prior To Completing Final Piping Connections. • Isolate The Existing Domestic Water Connection And Supply/return Reverse Osmosis Pipes Before Disconnecting The Existing Reverse Osmosis And Associated Filters. • Demolish The Existing Drainage Pipes As Per Drawing. • Place And Connect The New Reverse Osmosis Units And Associated Pretreatment Filters To The Existing Pipes As Per Drawing. • Provide The Required Cold Water Pipes, Drainage Pipes And Reverse Osmosis Pipe Segments As Per Drawings. • Coordinate Reverse Osmosis Units And Associated Equipment Installation With Manufacturer Recommendations And Specific Instructions. • Provide All Required Labour And Materials For Fully Functioning System. • Contractor To Ensure Construction Sequencing Is Coordinated And Approved By The Ministry. No Two Adjacent Reverse Osmosis Systems May Be Decommissioned Simultaneously. • Provide A Separate Price For Sanitization Of The All Impacted System Piping. Priority Sequence In Descending Order: • Room E208 (system 1 & 2) • Room E312 • Room Ng20 • Room E306 • Room E324 • Room E441a • Room Eg10 • Room E434
Closing Date10 Oct 2024
Tender AmountRefer Documents
Colliers Project Leaders Tender
Civil And Construction...+4Bridge Construction, Others, Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
Canada
Colliers Project Leaders Is Seeking The Services Of A Consulting Structural Engineer For Bailey Bridge 1 Remediation. This Bridge Is In Fair Condition With Localized Areas Where Deterioration Was Observed Or Structural Concerns Were Noted. The Deterioration Observed Ranges From Rusting Steel/peeling Paint, Concrete Scaling/delamination. Some Bridge Deck Members Were Found To Be Undersized. Gaps Were Observed In The Guard Rails Along The Abutments Of This Bridge. Scope Of Work Of The Project Is To To Provide Concrete And Steel Structural Remediation And Repairs As Per Recommendations From A 2021 Condition Assessment Report By Tacoma Engineering. As This Bridge Spans The Wye River Special Consultations May Be Required.
Closing Date14 Nov 2024
Tender AmountRefer Documents
31-40 of 89 archived Tenders