Tenders of Colliers Project Leaders

Tenders of Colliers Project Leaders

Colliers Project Leaders Tender

Corrigendum : Closing Date Modified
Canada
Site Wide Study - Structural & Study - Retaining Walls
Closing Date2 Aug 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
The Facility Where The Bundled Projects Will Take Place Is Located In 125 Resources Road, Etobicoke, On M9p 3v6, And Is Occupied By The Ministry Of The Environment, Conservation And Parks (mecp). There Are Various Other Buildings At This Site, But Specifically 125 Resources Road Has Tenant Space Divided Into Three (3) Wings (east, North, And West). Approximately 75% Of The Overall Area Is Used As Laboratory Space Of Various Disciplines And The Remainder Is Office And Miscellaneous Spaces. The Roof Areas At All The Wings Are In Poor Condition And Should Be Replaced. The Intent Of These Bundled Projects Is To Replace The Built Up Roofs As Follows: - Approximately 45000 Sf At The North Wing (b12425) - Approximately 32,200 Sf At The East Wing (b16338) - Approximately 31,600 Sf At The West Wing (b16360)
Closing Date9 Aug 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
Vedette Fab Kitchen Staff Quarters - Rfp Architect
Closing Date15 Aug 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
Switchgear And Panel Replacement
Closing Date19 Sep 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Civil And Construction...+1Building Construction
Canada
Scope Of Work The Intent Of The Project Is To Prepare Courtrooms To Be Equipped With New Av Technology As Per Jvn/solgen Facilities Scope Of Work (fsow) And Built Ready Drawings. A Sample Fsow Has Been Provided For Reference At Rfp Stage. The Overall Scope Of Work For The Project Will Go Beyond The Jvn’s Fsow In Order To Have The Necessary Electrical/conduiting, Cabling For Data (where Applicable), Power Management, Architectural & Interior Finishes, Patch & Paint And Environmental Dss Abatement Complete. The New Av Equipment (microphones, Video, Screens, Speakers, Servers, Racks, Etc.) Will Be Procured, Delivered, Installed, And Commissioned By Solgen-jvn (as Owner Supplied Equipment). The Scope Of This Project Will Include, But Is Not Limited To: • Millwork Modification To Dais, Installation Of Plywood Backing, And Nut Inserts For Mounting Of Monitor Brackets. • Setting Up Tracks For Cabling, Walls And Ceiling Repairs Post Conduit Installation, Fire Caulking To Be Applied To Any Conduit Through Wall Penetrations, Paint And Make Good All Walls And Flooring As Required. • Review Of Site Specific Conditions Such As Electrical Panels Capacity, Supplementary Cooling Requirements For Equipment/server Racks, Etc. • During Construction Stage, Completed Courtrooms Will Be Handed Over To The Ministry As They Are Completed. Allow For 20 Occupancy Sign-off Site Meetings. This Project Will Be Delivered In Three Phases, As Per Breakdown Below. Proponents Are To Account For 5 Separate Bid Packages. Project Phasing Has Been Determined According To The Expected Release Dates Of Jvn’s Fsows.
Closing Date23 Jul 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Civil And Construction...+1Building Construction
Canada
Scope Of Work The Intent Of The Project Is To Prepare Courtrooms To Be Equipped With New Av Technology As Per Jvn/solgen Facilities Scope Of Work (fsow) And Built Ready Drawings. A Sample Fsow Has Been Provided For Reference At Rfp Stage. The Overall Scope Of Work For The Project Will Go Beyond The Jvn’s Fsow In Order To Have The Necessary Electrical/conduiting, Cabling For Data (where Applicable), Power Management, Architectural & Interior Finishes, Patch & Paint And Environmental Dss Abatement Complete. The New Av Equipment (microphones, Video, Screens, Speakers, Servers, Racks, Etc.) Will Be Procured, Delivered, Installed, And Commissioned By Solgen-jvn (as Owner Supplied Equipment). The Scope Of This Project Will Include, But Is Not Limited To: • Millwork Modification To Dais, Installation Of Plywood Backing, And Nut Inserts For Mounting Of Monitor Brackets. • Setting Up Tracks For Cabling, Walls And Ceiling Repairs Post Conduit Installation, Fire Caulking To Be Applied To Any Conduit Through Wall Penetrations, Paint And Make Good All Walls And Flooring As Required. • Review Of Site Specific Conditions Such As Electrical Panels Capacity, Supplementary Cooling Requirements For Equipment/server Racks, Etc. • During Construction Stage, Completed Courtrooms Will Be Handed Over To The Ministry As They Are Completed. Allow For 20 Occupancy Sign-off Site Meetings. This Project Will Be Delivered In Three Phases, As Per Breakdown Below. Proponents Are To Account For 5 Separate Bid Packages. Project Phasing Has Been Determined According To The Expected Release Dates Of Jvn’s Fsows.
Closing Date23 Jul 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
Sioux Lookout Courthouse Aoda Exterior
Closing Date26 Jul 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
Study - Fire And Life Safety & Study - Fire Separation
Closing Date1 Aug 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
Consulting Rfp - 125rr Pump And Overhaul Bundle
Closing Date25 Sep 2024
Tender AmountRefer Documents 

Colliers Project Leaders Tender

Canada
The Intent Of This Project Is To Supply And Install A Security Upgrade To Include But Not Limited To Pals, Harding Intercom System, Paging Replacement, Smacs, Active Duress, Integrations Of Passive Duress, Cctv Integration, Watch Tour, Credential Data Base, In-out Readers, Integration Into Synergy, Inmate Phones, Power + Water + Lighting In Inmate Living Units And Cells Integration, Perimeter Detection, Door Control, Plc Control, Ups + Generator (load Tests To Ensure Sufficient), Connections To Generator As Required, Secure Remote Connection To Allow Remote Access For Service And Maintenance. New System Is To Be Installed In Parallel With The Old System. New System Must Be Tested To Meet Solgen Expectation Prior To Switching Over From Current System. System Must Work Without Fail, No Deficiencies Can Be Outstanding. Security Systems Must Be Fully Operational To Be Considered Complete. Solgen Confirmed That There Is No Readily Available Equipment List To Share At This Time. Consultant Will Need To Complete A Thorough Review During The Pre-design Phase And Cross Reference With Any Existing Drawings. General Project Requirements
Closing Date25 Sep 2024
Tender AmountRefer Documents 
1-10 of 89 archived Tenders